N6134019R0020_N6134019R0020__0003_conformed.pdf
PDF 820 KB Posted
- Attached to
- STIGS Solicitation Amendment 0005
- Solicitation number
- N6134019R0020
About this file
This is a solicitation amendment for the STIGS IDIQ contract. It provides notice that solicitation N6134018R0040 has been renumbered to N6134019R0020 for fiscal year 2019. Offerors are instructed to obtain guidance and funding information related to the STIGS contract from the attached document. The amendment does not specify any required products or services, pricing terms, or response dates. It solely serves to communicate an administrative change to the solicitation number for the referenced IDIQ contract.
N6134019R0020_N6134019R0020__0003_conformed.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6134019R0020_STIGS_Amendment_0004_documents.zip | ZIP file | |
| N6134019R0020_RFP_Question_Log_Rev_3.1.xlsx | XLSX spreadsheet | |
| N6134019R0020_N6134019R0020__0003.pdf | ||
| N6134019R0020_RFP_Question_Log_Rev_3.xlsx | XLSX spreadsheet | |
| N6134019R0020_N6134019R0020-0002_conformed.pdf | ||
| N6134019R0020_N6134019R0020_0002.pdf | ||
| N6134019R0020_RFP_Question_Log_Rev_1.xlsx | XLSX spreadsheet | |
| N6134019R0020_STIGS_Amendment.zip | ZIP file | |
| N6134019R0020_N61340019R0020_STIGS_RFP.docx | DOCX document | |
| N6134019R0020_Final_RFP.zip | ZIP file | |
| N6134019R0020_STIGS_Docs_14Mar19.pdf | ||
| N6134019R0020_Extra_Assistance_IVSE_Installation.docx | DOCX document | |
| N6134019R0020_STIGS_Pre-Award_QuestionsandAnswers_18Dec18.pdf | ||
| N6134019R0020_STIGS_Question_Form.doc | DOC document | |
| N6134019R0020_SECNAV_5512_1_Pass_ID_Form.pdf | ||
| N6134019R0020_STIGS_Site_Visit.pdf | ||
| N6134019R0020_STIGS_Docs_30Oct18.docx | DOCX document | |
| N6134019R0020_STIGS_Drive.jpeg | JPEG file | |
| N6134019R0020_STIGS_GFI_Instructions.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 04:00 PM local time 17 Jun 2019
X
A
X B
X C X D
EX
X
G
F 43 - 53
54 - 66
X H 67 - 75
Terick.a.coleman1@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 75
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N61340 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
TERICK A. COLEMAN 407-380-8555
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 3
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
5 - 7
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
8 - 9
10 - 12 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 13 - 19 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 20 - 27 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
28 - 39
PART II - CO NTRACT CLAUSES
NAWCTSD 253
CODE 2.5.3.6.1
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
40 - 42
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
19 Apr 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6134019R0020
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 81,100,000 Each
STIGS FFP
FFP
To include, but not limited to the general requirements found in paragraph 3.1 and subparagraphs of Statement of Work (SOW) 180005.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 18,000,000 Each
STIGS CPFF
CPFF
To include, but not limited to the general requirements found in paragraph 3.1 and subparagraphs of SOW 18005
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
SECTION B INSTRUCTIONS
B.1 ORDERING INSTRUCTIONS
This is a single award Indefinite Delivery/Indefinite Quantity (ID/IQ) contract with the ordering period as set forth in Section F. Ordering instructions are provided in Clause H.1 – Issuance of
Orders. Actual delivery order CLIN pricing will be established at the time of delivery order award and will be reflected in the individual delivery order.
B.2 STIGS IDIQ CONTRACT CEILING
The total dollar ceiling for the overall contract inclusive ofall delivery orders issued under the STIGS ID/IQ contract is $99,100,000.00. Initial contract line item (CLIN) value allocations represent projected award/types based upon historical and programmed requirements as of contract award. The Government reserves the right to reallocate value across the CLINs as necessary, throughout the ordering period, to accommodate requirements received.
Section C - Descriptions and Specifications
DESCRIPTION OF WORK STATEMENT
Statement of Work (SOW) #180005, Attachment 1, defines and provides the basic requirements of the general tasks to be performed under this STIGS Indefinite Delivery/Indefinite Quantity (ID/IQ) contract. The Naval Air Warfare
Center Training Systems Division (NAWCTSD) may procure a broad range of training system products and courseware within the scope of this contract.
STIGS delivery orders may include the following types of efforts:
Training Requirements Analysis
New Trainers
Modifications to existing trainers
New courses in virtual environments
Modifications to existing courses in virtual environments
Development of new virtual ship 3-D models
Modification to existing virtual ship 3-D models
New Interactive Media Instruction (IMI/Instructor Led Training (ILT)
Modifications to existing IMI/ILT
Technical Documentation
Software support environment (SSE)
Centralized CMS
Provisioning Item Orders (PIO)
Over and Above (O&A) Work
Travel/On-site support
Interim contractor support
The tasks and detailed requirements for training system products and courseware will be defined in the SOW or
Statement of Objectives (SOO), and/or Performance Specification for each specific STIGS delivery order.
Section D - Packaging and Marking
DO SPECIFIC INFORMATION
D.1 DO SPECIFIC INFORMATION
Specific terms and conditions regarding Packaging and Marking shall be incorporated in individual delivery orders.
CLAUSES INCORPORATED BY FULL TEXT
5252.247-9503 MARKING OF WARRANTED ITEMS (NAVAIR) (OCT 2005)
(a) Each item covered by a warranty shall be stamped or marked in accordance with MIL-STD-129, Marking for
Shipment and Storage, and MIL-STD-130, Identification Marking of U.S. Military Property, current at the date of award. Where this is impracticable, written notice shall be attached to or furnished with the warranted item.
(b) Each item covered by a warranty shall have a written notice attached to or furnished with the warranted item, and marked with the following:
(1) National stock number or manufacturer's part number.
(2) Serial number or other item identifier (if the warranty applies to uniquely identified items).
(3) Contract number.
(4) Indication that a warranty applies.
(5) Manufacturer or entity (if other than the contractor) providing the warranty.
(6) Date or time when the warranty expires.
(7) Indication of whether or not attempted on-site repair by Government personnel will void the warranty.
5252.247-9507 PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005)
(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry
Security Program Operating Manual, DoD 5220.22-M.
(b) The contractor shall prominently display on the cover of each report the following information:
(1) Name and business address of contractor.
(2) Contract Number/Delivery/Task order number.
(3) Contract/Delivery/Task order dollar amount.
(4) Whether the contract was competitively or non-competitively awarded.
(5) Name of sponsoring individual.
(6) Name and address of requiring activity.
5252.247-9508 PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
5252.247-9509 PRESERVATION, PACKAGING, PACKING AND MARKING (NAVAIR)(JUL 1998)
(a) Preservation, packaging and packing shall conform to prevailing industry standards for the type of commodity purchased under this contract.
(b) All packages will be clearly marked with applicable contract number/delivery order number, and will contain appropriate packing slip. All deliveries will be marked for and/or consigned as follows: specific instructions will be provided at the delivery order level.
(c) In the event of any discrepancy in material shipped (overage, technical rejection, damage), the contractor shall, immediately upon request of the Contracting Officer, furnish disposition instructions. Normally, such disposition instruction shall be a properly completed Commercial Bill of Lading, which includes, but is not limited to, the mode of shipment, routing, special handling, and so forth.
(d) If the contractor is required to install equipment upon delivery, then the contractor shall inform the
Government of the date of shipment from the contractor's facilities and the anticipated date of arrival at the site.
This report shall be made no later than the actual date that the shipment is made from the contractor’s facilities. The report may be made by facsimile or e-mail, to the point of contact listed in Section G. All transportation, rigging, drayage, packing, unpacking, and handling necessary to accomplish the installation shall be the responsibility of the contractor.
5252.247-9510 PRESERVATION, PACKAGING, PACKING AND MARKING FOR FOREIGN
MILITARY SALES (FMS) REQUIREMENTS (NAVAIR)(OCT 2005)
(a) Unless specified elsewhere in the contract, packing and packaging shall comply with MIL-STD-129 and other applicable DoD regulations. Packing and packaging materials shall provide protection from abuse during handling and from environmental, magnetic, and electrical damage during handling and subsequent future storage, possibly under less than desirable conditions.
(b) Marking: All unit and exterior containers/packs shall as a minimum be marked as follows:
(1) FMS Case Number.
(2) Part Number (with CAGE Code).
(3) For - the organization/address the material is shipped to.
(4) The applicable MILSTRIP number (identified separately for each line item of the contract/delivery order)
(5) Project Code number.
(6) Project Directive Line Item (PDLI) Number.
(7) Requisition Serial Number (RSN).
(8) Quantity.
(9) From - the contractor's address shipped from.
(10) Ship to - the shipping address provided in the contract.
(11) Transportation Priority
(12) Required Delivery Date
(c) The contractor shall affix labels to the outside of each external pack warning all handlers that fragile, delicate, etc., equipment is contained within and to warn against particular improper handling and storage procedures/conditions as may be applicable to the item(s) ordered.
5252.247-9514 TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999)
Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M.
Section E - Inspection and Acceptance
E.1 DO SPECIFIC INFORMATION
Specific terms and conditions regarding Inspection and Acceptance shall be incorporated in individual delivery orders.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
0002 N/A N/A N/A Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-3 Inspection Of Supplies Cost-Reimbursement MAY 2001
52.246-16 Responsibility For Supplies APR 1984
5252.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by TO BE
SPECIFIED ON INDIVIDUAL DELIVERY ORDERS AS REQUIRED.
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
5252.246-9513 INSPECTION AND ACCEPTANCE OF TRAINING DEVICES (NAVAIR) (OCT 2007)
Inspection of Device TO BE SPECIFIED ON INDIVIDUAL DELIVERY ORDERS AS REQUIRED shall be accomplished in accordance with the Specification/Statement of Work entitled TO BE SPECIFIED ON
INDIVIDUAL DELIVERY ORDERS AS REQUIRED, dated TO BE SPECIFIED ON INDIVIDUAL
DELIVERY ORDERS AS REQUIRED, and the Government approved Contract Data Requirements List (CDRL), DD Form 1423, data item entitled Test Procedures and Test/Inspection Reports (TP and TIR). Any Government inspection/acceptance to be conducted in the contractor's facility, will be performed by the Administrative
Contracting Officer's quality assurance representative with support of TO BE SPECIFIED ON INDIVIDUAL
DELIVERY ORDERS AS REQUIRED. technical personnel. Final inspection to be performed at the device delivery site will be directed and witnessed by the technical representative of the Procuring Contracting Officer
(PCO). Final acceptance of this Contract Line Item will be evidenced by signature of the PCO or his duly authorized representative on a DD Form 250, Material Inspection and Receiving Report.
5252.246-9514 INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION
(NAVAIR)(FEB 1995)
Inspection and acceptance of technical data and information will be performed by the Procuring Contracting
Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements
List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled NAWCTSD 4330/60 Data Item Transmittal/Acceptance/ Rejection Form. The attached form will not be used for high cost data such as drawings, specifications, and technical manuals.
Section F - Deliveries or Performance
ORDERING PERIOD
F.1 Order Delivery/Duration
This IDIQ utilizes an ordering period of 60 months from date of award. Orders may be issued up to the last day of the ordering period, with delivery dates up to 5 years. Required delivery date(s) for individual orders issued under this contract will be specified at the delivery order level.
F.2 Effective Period.
The IDIQ remains in effect (e.g. terms & conditions) after the ordering period expires for any orders that were placed prior to the ordering period expiring, inclusive of the Government’s right to exercise any
Options that may exist on Delivery Orders.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 60 mths. ADC 81,100,000 N/A
0002 60 mths. ADC 18,000,000 N/A
52.242-15 Stop-Work Order AUG 1989
52.242-15 Alt I Stop-Work Order (Aug 1989) - Alternate I APR 1984
52.242-17 Government Delay Of Work APR 1984
52.247-34 F.O.B. Destination NOV 1991
5252.211-9506 PROVISIONED ITEMS (FEB 1995)
Provisioned items shall be delivered in accordance with individual Provisioned Items Orders (PIOs) issued pursuant to TO BE SPECIFIED ON INDIVIDUAL DELIVERY ORDERS AS REQUIRED. The Government may order provisioned items for a period of up to twelve (12) months following delivery of each training system or training system modification.
5252.216-9506 MINIMUM AND MAXIMUM QUANTITIES (NAVAIR)(MAR 1999)
As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is $3,500; the maximum quantity is $99,100,000.
5252.247-9505 TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data
Requirements List, DD Form 1423, Exhibit A-F, attached hereto, and the following:
(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13
(date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below.
Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the
DD Form 1423.
(1) PCO
Code 2.5.3.6.1
Sidney Galloway
12211 Science Dr., Orlando, FL 32826
(2) ACO
To Be Specified in Individual Delivery Order
(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.
(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.
(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements
(i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.
(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.
(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.
(g) DD Form 1423, Block 14 Mailing Addresses:
CDRL ADDRESSEE EMAIL ADDRESS MAILING ADDRESS
TO BE SPECIFIED ON INDIVIDUAL DELIVERY ORDERS AS REQUIRED
Section G - Contract Administration Data
G.1 DO SPECIFIC INFORMATION
Specific terms and conditions regarding Contract Administration Data shall be incorporated in individual delivery orders.
252.204-7006 Billing Instructions OCT 2005
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of
Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-
7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
https://www.sam.gov/ https://wawf.eb.mil/
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting
Officer.
Combo
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the
Contracting Officer.
Invoice 2 in 1
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC To be completed at award https://wawf.eb.mil/
Issue By DoDAAC N61340
Admin DoDAAC** N61340
Inspect By DoDAAC To be completed at award
Ship To Code To be completed at award
Ship From Code To be completed at award
Mark For Code To be completed at award
Service Approver (DoDAAC) To be completed at award
Service Acceptor (DoDAAC) To be completed at award
Accept at Other DoDAAC To be completed at award
LPO DoDAAC To be completed at award
DCAA Auditor DoDAAC To be completed at award
Other DoDAAC(s) To be completed at award
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert
“See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the
DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition
Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact.
____N61340_____________________________________________________________
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
5252.201-9500 TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012)
(a) The Technical Point of Contact (TPOC) for this contract is: To Be Completed at Delivery Order Level
(b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order
COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order.
Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO).
(c) The contractor may use this technical POC for technical questions related to the existing contract or order.
Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System
(CPARS), clarification of technical requirements, and statement of work inquires.
(d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract.
5252.204-9503 EXPEDITING CONTRACT CLOSEOUT (NAVAIR) (JAN 2007)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the
Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party might be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
5252.232-9510 PAYMENT OF FIXED FEE (NAVAIR) (OCT 2005)
(a) The fixed fee, as specified in Section B of this contract, subject to any adjustment required by other provisions of this contract, will be paid in installments. The fixed fee will be paid not more frequently than TO BE
SPECIFIED ON INDIVIDUAL DELIVERY ORDERS AS REQUIRED based on the allowable cost. The amount of each such installment shall be in the same ratio to the total fixed fee as the TO BE SPECIFIED ON
INDIVIDUAL DELIVERY ORDERS AS REQUIRED. Payment shall be made in accordance with FAR Clauses
52.216-7, "Allowable Cost and Payment," and 52.216-8, "Fixed Fee."
(b) In the event of termination of the work in accordance with the FAR Clause 52.232-22, "Limitation of Funds," the fixed fee shall be redetermined by mutual agreement equitably to reflect the reduction of the work performed.
The amount by which such fixed fee is less than or exceeds payments previously made on account of fee, shall be paid to (or repaid by) the contractor.
(c) The balance of the fixed fee shall be payable in accordance with other clauses of this contract.
(d) For indefinite delivery type contracts the terms of this clause apply to each delivery/task order there under.
5252.232-9524 ALLOTMENT OF FUNDS (NAVAIR)(OCT 2005)
(a) This contract is incrementally funded with respect to both cost and fee.
(b) The amounts presently available and allotted to this contract for payment of fee, as provided in the Section I clause of this contract entitled “FIXED FEE”, are as follows:
ITEM(S) ALLOTTED TO FIXED FEE
To Be Specified on Individual Delivery Orders As Required
(c) The amounts presently available and allotted to this contract for payment of cost, subject to the Section I
“LIMITATION OF FUNDS” clause, the items covered thereby and the period of performance which it is estimated the allotted amount will cover are as follows:
PERIOD OF
ITEM(S) ALLOTTED TO COST PERFORMANCE
To Be Specified on Individual Delivery Orders As Required
(d) The parties contemplate that the Government will allot additional amounts to this contract from time to time by unilateral contract modification, and any such modification shall state separately the amounts allotted for cost and for fee, the items covered thereby, and the period of performance the amounts are expected to cover.
5252.242-9511 CONTRACT ADMINISTRATION DATA (NAVAIR)(NOV 2017)
(a) Contract Administration Office.
(1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the
ADMINISTERED BY Block on the face page of the contract, modification, or order.
(b) Special Instructions (see FAR 42.202(b) and (c)):
(1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)):
Functions Retained Retained for Performance By:
(a)(3),(4),(23) PCO
(a)(40),(41),(44),(46),(47),(58) PCO & TPOC
(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):
Additional Functions Retained for Performance By:
None None
(c) Inquiries regarding payment should be referred to: MyInvoice through the Wide Area Workflow eBusiness
Suite: https://wawf.eb.mil.
G-TXT-PAY PAYMENT INSTRUCTIONS (APR 2018)
FOR GOVERNMENT USE ONLY
Contract/Order
Payment Clause
Type of
Payment
Request Supply Service Construction
Payment Office
Allocation Method
52.212-4 (Alt I), Contract Terms and
Conditions—
Commercial Items
52.216-7, Allowable
Cost and Payment
Cost Voucher X X N/A Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or
52.232-7, Payments under Time-and-
Materials and Labor-
Hour Contracts deliverable subline item for which payment is requested.
52.232-1, Payments Navy
Shipbuilding
Invoice (Fixed
Price)
X N/A N/A Line Item specific by fiscal year. If there is more than one
ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-1, Payments;
52.232-2, Payments under Fixed-Price
Research and
Development
Contracts;
52.232-3, Payments under Personal
Services Contracts;
52.232-4, Payments under Transportation
Contracts and
Transportation-Related
Services Contracts; and
52.232-6, Payments under Communication
Service Contracts with
Common Carriers
Invoice X X N/A Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-5, Payments
Under Fixed-Price
Construction Contracts
Construction
Payment
Invoice
N/A N/A X Line Item specific by fiscal year. If there is more than one
ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-16, Progress
Payments
Progress
Payment*
X X N/A Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress
Payments are considered contract level financing, and the
“contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3.
52.232-29, Terms for
Financing of Purchases of Commercial Items;
52.232-30, Installment
Payments for
Commercial Items
Commercial
Item
Financing*
X X N/A Specified in approved payment.
The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR
32.207(b)(2) and 32.1007(b)(2).
52.232-32, Performance-Based
Payments
Performance-
Based
Payments*
X X N/A Specified in approved payment.
The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR
32.207(b)(2) and 32.1007(b)(2).
252.232-7002, Progress Payments for
Foreign Military Sales
Acquisitions
Progress
Payment*
X X N/A Allocate costs among line items and countries in a manner acceptable to the Administrative
Contracting Officer.
*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).
Section H - Special Contract Requirements
H.1 DO SPECIFIC INFORMATION
Specific terms and conditions regarding Special Contract Requirements will be incorporated in the individual delivery order.
H.2 ISSUANCE OF ORDERS
1. The following types of delivery orders may be issued under this contract:
a. Fixed Price (Firm Fixed Price (FFP))
Fixed price orders may be issued when the scope of effort is sufficiently defined to allow technical and cost risks to be predicted with reasonable certainty. Under this contract type, the Contractor shall be required to submit a fixed price proposal to accomplish the total effort inclusive of all labor, material, and travel costs, as appropriate. The contractor shall be required to deliver the specified product within the specified time and fixed price amount.
b. Cost Reimbursement (Cost Plus Fixed Fee (CPFF))
Cost reimbursement orders may be issued when it is not possible to sufficiently define the magnitude of the effort required to accomplish the stated effort. Under this contract type, the Contractor shall be required to submit an estimated cost proposal to accomplish the total effort inclusive of all labor, materal, and travel costs, as appropriate. The estimated cost for an order shall be based on the contractor’s labor rates and material costs, with the applicable overhead, G&A, and fee. The order amount will be expressed as a total estimated cost plus fee.
c. Hybrid
Any combination of the contract types above.
2. Individual delivery orders will specify the type of order to be used and will incorporate or complete all applicable clauses not incorporated or completed in the basic STIGS ID/IQ into the delivery order. Such applicable clauses will pertain only to the respective individual delivery order.
3. Orders may be issued as a result of a Government prepared Statement of Work (SOW), Statement of
Objectives (SOO) or Performance Specification (PRF).
H.3 SECURITY REQUIREMENTS
As required by FAR clause 52.204-2 of the contract, the contractor shall comply with the DoD Manual
5220.22M, “DoD Industrial Security Manual” which will be used in the development of security requirements. A DD Form 254 will be issued at the basic contract level for overall security requirements.
Awardee shall be required to obtain appropriate facilities and personnel security clearances in accordance with any DD Form 254 in support of a delivery order requirement.
H.4 DELIVERY ORDER PROCEDURES
1. The following activity(ies) or individual(s) is/are designated as Contracting Office(s) / Officer(s):
a. All Procuring Contracting Officers: N61340
The above activity(ies) or individual(s) is/are responsible for issuing and administering any orders placed hereunder. Contracting Officers may negotiate revisions/modifications to orders, but only within the scope of this contract.
2. Delivery orders. All delivery orders issued hereunder are subject to the terms and conditions of this contract. The contract shall control in the event of conflict with any delivery order.
5252.204-9505 SYSTEM AUTHORIZATION ACCESS REQUEST NAVY (SAAR-N) REQUIREMENTS
FOR INFORMATION TECHNOLOGY(IT) (NAVAIR)(NOV 2017)
(a) Contractor personnel assigned to perform work under this contract may require access to Navy Information
Technology (IT) resources (e.g., computers, laptops, personal electronic devices/personal digital assistants
(PEDs/PDAs), NMCI, RDT&E networks, websites such as MyNAVAIR, and Navy Web servers requiring Common
Access Card (CAC) Public Key Infrastructure (PKI)). Contractor personnel (prime, subcontractor, consultants, and temporary employees) requiring access to Navy IT resources (including those personnel who previously signed
SAAR DD Form 2875) shall submit a completed System Authorization Access Request Navy (SAAR-N), OPNAV
5239/14 (Jul 2008) form or latest version thereof, and have initiated the requisite background investigation (or provide proof of a current background investigation) prior to accessing any Navy IT resources. The form and instructions for processing the SAAR-N form are available at:
https://navalforms.documentservices.dla.mil/formsDir/_OPNAV_5239_14_7631.pdf. Instruction Note: SAAR-N forms are required to be downloaded and then completed. The "E-MAIL SUBMIT" button on the SAAR-N form is not to be used.
(b) SAAR-N forms will be submitted to the Government Sponsor or Technical Point of Contact (TPOC) via the contractor's Facility Security Officer (FSO). The designated SAAR-N Government Sponsor or TPCO for contractor employees requiring IT access, the STIGS Project Manager shall be responsible for signing and processing the
SAAR-N forms. For those contractors that do not have a FSO, SAAR-N forms shall be submitted directly to the designated SAAR-N Government Sponsor or TPOC. Copies of the approved SAAR-N forms may be obtained through the designated SAAR-N Government Sponsor or TPOC. Requests for access should be routed through the
NAVAIR_SAAR.fct@navy.mil mailbox.
(c) In order to maintain access to Navy IT resources, the contractor shall ensure completion of initial and annual
IA training, monitor expiration of requisite background investigations, and initiate re-investigations as required. If requested, the contractor shall provide to the designated SAAR-N Government Sponsor or TPOC documentation sufficient to prove that it is monitoring/tracking the SAAR-N requirements for its employees who are accessing
Navy IT resources. For those contractor personnel not in compliance with the requirements of this clause, access to
Navy IT resources will be denied/revoked.
(d) The SAAR-N form remains valid throughout contractual performance, inclusive of performance extensions and option exercises where the contract number does not change. Contractor personnel are required to submit a new
SAAR-N form only when they begin work on a new or different contract.
5252.211- 9510 CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011)
(a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall:
(1) Not by word or deed give the impression or appearance of being a Government employee;
(2) Wear appropriate badges visible above the waist that identify them as contractor employees when in
Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order;
(3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work;
(4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and
(5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative.
(b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer.
(c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees.
5252.216-9512 PAPERLESS CONTRACTING (NAVAIR)(JUN 2009)
(a) Orders and requests for proposals are hereby authorized to be issued by facsimile or by electronic commerce
(including e-mail and paperless methods of delivery). Nothing in this contract should be read to prohibit these types of orders. In the event of a conflict with any other provision of this contract, this clause shall govern.
(b) To the extent the terms "written", "mailed", or "physically delivered" appear in other provisions of this contract, these terms are hereby defined to explicitly include electronic commerce, email, or paperless delivery methods.
5252.217-9500 ORDERING - PROVISIONED ITEMS (FIXED-PRICE)(NAVAIR) (OCT 2005)
(a) Contract Modification - Provisioned Items and Other Requirements to be Furnished When Ordered by the
Government. The contractor shall furnish supplies or other requirements under the Item(s) set forth in this clause when a contract modification is issued by the Government in accordance with the procedures specified herein. The
Government shall not be liable for any expenses incurred by the contractor under any Item set forth herein until a contract modification is issued by the Government.
(b) Contractor Qualifying Proposal - Requirements Being Ordered. When required by the Procuring Contracting
Officer (PCO), the contractor shall submit a qualifying proposal for the requirements the Government contemplates ordering hereunder. Such proposal shall be supported by cost or pricing data as prescribed in FAR 15.403 and
DFARS 215.403 unless such requirement has been waived for orders under the contract pursuant to FAR 15.403.
Certification of the cost or pricing data shall be made upon agreement on price.
(c) Ordering Period and Terminal Date for Delivery or Performance. Contract modifications for supplies or other requirements may be issued during the period covered by this contract at any time prior to the delivery date of the last article under the applicable Item called for in Section B hereof for which the supplies or other requirements are being procured. Contract modifications issued in accordance with this clause shall provide that deliveries or performance shall be completed not later than fourteen (14) months after the delivery of the last article under the applicable Item called for in Section B hereof, for which the supplies or other requirements are being procured.
(d) Ordering. For the purposes of this contract, the PCO is the ordering activity. The PCO will issue contract modifications for supplies or other requirements to be furnished by the contractor in accordance with requirements specified by the cognizant provisioning or requiring activity designated in paragraph (q) below. Each contract modification issued in accordance with paragraph (e) or (f) below shall -
(1) be prepared on Standard Form 30 (Amendment of Solicitation/Modification of Contract);
(2) be numbered as a modification to this contract in accordance with DFARS 204.7106;
(3) state that the contract modification is issued in accordance with this clause;
(4) identify the Item number set forth in Section B of the Schedule under which the supplies or other requirements are being procured (new contract line item number(s) shall not be assigned in any contract modification issued by the ACO.
(5) set forth in full detail the supplies or other requirements and the quantities being procured (deliverable requirements shall be set forth in a contract exhibit (see paragraph (m) below));
(6) include as an Exhibit, DD Form 1423, Contract Data Requirements List, using the exhibit identifier designated in Section B for the Item number, whenever data is ordered under any contract line item number which does not refer to a contract exhibit attached to the contract;
(7) set forth packing and marking requirements for supplies being procured (see FAR 47.305-10 and DFARS
247.305-10);
(8) set forth consignment instructions for supplies being procured to the extent they are known at the time the contract modification is issued (see FAR 47.305-10 and DFARS 247.305-10);’
(9) set forth the negotiated delivery or performance dates;
(10) identify those items, if any, subject to the "Limitation of Liability - High-Value Items" clause, if included in this contract;
(11) obligate funds to cover priced orders issued under paragraph (e) below or ceiling priced orders issued under paragraph (f) below;
(12) set forth the applicable accounting and appropriation data (to be provided to the Cognizant Contracting
Officer by the cognizant provisioning or requiring activity (see paragraph (q) below)); and
(13) be given the same distribution as this contract, except that distribution of voluminous contract exhibits shall be limited to: (i) the contractor; (ii) the contract administration office; (iii) the cognizant provisioning or requiring activity; (iv) the paying office, and (v) the accounting office.
(e) Issuance of Contract Modifications Covering Priced Orders. For each order placed pursuant to this clause, the
Cognizant Contracting Officer will prepare a supplemental agreement to this contract in the form of a priced order when supplies or other requirements are to be furnished by the contractor unless otherwise provided for under paragraph (f) below. The supplies or other requirements being procured shall be clearly defined in the supplemental agreement. Such supplemental agreement shall be priced and otherwise definitive at the time of issuance and shall be signed by the contractor and the Cognizant Contracting Officer.
(f) Issuance of Contract Modifications Covering Ceiling Priced Orders. In those cases where it is not possible to price supplies or other requirements in accordance with paragraph (e) above due to urgency such as safety-of-flight or readiness impact, the Cognizant Contracting Officer will prepare a supplemental agreement to this contract in the form of a ceiling priced order. A ceiling priced order shall not be used to obtain contractor support services. Each ceiling priced order shall clearly define the supplies or other requirements being procured and shall set forth a not-to-exceed ceiling price and shall specify the total ceiling price for the DFARS Clause 252.217-7027, "Contract
Definitization". The ceiling price set forth in any ceiling priced order shall not be used as a billing price for delivered items. Each ceiling priced order shall provide for total performance of the order for the specified ceiling price and such ceiling price shall bear a reasonable relationship to the work to be performed. A milestone schedule which culminates in a mutually agreed date upon which complete definitization will occur shall be included in each ceiling priced order. The milestone schedule established in the ceiling priced order concerned shall be within the period set forth in paragraph (h) below. Provisioned Items Orders shall comply with the applicable requirements set forth in DFARS 217.7602-2. Each supplemental agreement covering a ceiling priced order shall be signed by the contractor and the Cognizant Contracting Officer. Additional requirements or quantities shall not be added to any ceiling priced order issued hereunder.
(g) Limitation of Government Liability Under Ceiling Priced Orders. The firm price of each ceiling priced order shall not exceed the ceiling price as established in accordance with paragraph (h). The ceiling price shall be the maximum amount for which the Government shall be liable if the ceiling priced order is terminated before the firm price is established. If at any time the contractor has reason to believe that the total price to the Government for the supplies or other requirements called for in any ceiling priced order will be substantially less than the ceiling price specified therefore, the contractor shall promptly notify the Cognizant Contracting Officer, in writing, with a copy to the cognizant provisioning or requiring activity. The Cognizant Contracting Officer will, based upon such notification, decrease the ceiling price of the ceiling priced order concerned. A decrease in the ceiling price of any ceiling priced order shall be set forth in a supplemental agreement to this contract and shall be signed by the contractor and the Cognizant Contracting Officer.
(h) Establishment of Firm Prices of Ceiling Priced Orders. The contractor shall submit to the Cognizant
Contracting Officer not later than TO BE SPECIFIED ON INDIVIDUAL DELIVERY ORDERS AS
REQUIRED days after the issuance of each ceiling priced order a qualifying proposal for the supplies or other requirements ordered by the Government that shall include:
(1) a statement of costs incurred and an estimate of the costs expected to be incurred in the performance of the ceiling priced order together with sufficient data to support the accuracy and reliability of such estimate and
(2) supporting cost or pricing data (see…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .