ATT 75 01-50-T34C-600-6-2.pdf

PDF 4 MB Posted

Attached to
T-34/T-44/T-6 Aircraft Maintenance and Contractor Logistics Support
Solicitation number
N61340-18-FOSR-0001
Issued by

About this file

N61340-18-FOSR-0001 Attachments

View the file

Other files

File Type Posted
ATT 18 T6 NASCC IMRL.pdf PDF
ATT 48 El Centro Gov Fac.pdf PDF
ATT 51 FRCSE Gov Fac.pdf PDF
ATT 35 NASCC ALSS.pdf PDF
ATT 43 T44C MEL.pdf PDF
N6134018FOSR0001_ATT_3_thru_17.zip ZIP file
ATT 45 NASWF Gov Fac.pdf PDF
ATT 67 NASP_NASWF WD.pdf PDF
ATT 79 01-50-T44A-600-6-1.pdf PDF
ATT 66 Oceana WD.pdf PDF
ATT 10 T44 Corr Ctrl Pln.pdf PDF
ATT 86 01-250-13-600-011-6.2.pdf PDF
N6134018FOSR0001_ATT_58_thru_72.zip ZIP file
N6134018FOSR0001_ATT_73_thru_89.zip ZIP file
ATT 05 Acronyms.pdf PDF
ATT 25 IMRL Supp CTW4.pdf PDF
ATT 83 01-50-T44C-600-6-3.pdf PDF
ATT 09 T6 Corr Ctrl Pln.pdf PDF
ATT 71 Miramar WD.pdf PDF
ATT 21 NASP GFP.pdf PDF
ATT 13 T44 Paint Schm.pdf PDF
ATT 23 NASCC GFM.pdf PDF
ATT 52 Miramar Gov Fac.pdf PDF
ATT 72 Hist Proj Flt Hrs.pdf PDF
ATT 87 01-250-13-600-16-6.2.pdf PDF
ATT 68 Fallon WD.pdf PDF
ATT 34 NASP ALSS.pdf PDF
ATT 56 PegNetAccRqstFrm.pdf PDF
ATT 08 T6 Turn Qual.pdf PDF
N6134018FOSR0001_ATT_39_thru_57.zip ZIP file
ATT 47 Lemoore Gov Fac.pdf PDF
ATT 40 AC Rec_Logs.pdf PDF
ATT_96_PACT_guide.pdf PDF
ATT 14 T34 Oceana Paint Schm.pdf PDF
ATT 15 T34 Miramar Paint Schm.pdf PDF
ATT 12 Gen Paint Schm.pdf PDF
ATT 03 Draft QASP.docx DOCX document
ATT 11 T34 Corr Ctrl Pln.pdf PDF
ATT 63 NASCC CBA.pdf PDF
ATT 41 T6B MEL.pdf PDF
ATT 17 T34 El Centro Paint Schm.pdf PDF
ATT 32 Oceana GFP.pdf PDF
ATT 19 NASWF GFP.pdf PDF
ATT 27 IMRL Supp CTW5.pdf PDF
ATT 65 NASP NASWF CBA Pilots.pdf PDF
ATT 85 01-250-13-600-005-6.2.pdf PDF
ATT 58 NASWF CBA.pdf PDF
ATT 33 NASWF ALSS.pdf PDF
ATT 69 El Centro WD.pdf PDF
ATT 78 01-50-T44A-600-6 .pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAIR (PMA 273) 01-50-T34C-600-6-2

U.S. NAVY T-34C

TURBO MENTOR

SEVEN DAY INSPECTION

REQUIREMENTS

March 1, 2005

ATTACHMENT 75

NAVAIR (PMA 273) 01-50-T34C-600-6-2 N61340-18-FOSR-0001

T-34C

Seven Day Inspection Requirements

MAINTENANCE REQUIREMENTS CARD

CARD NUMBER

i

DATE

March 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

ELEC PWR

N/A

WORK AREA

WUC

ITEM

TASK DESCRIPTION/REQUIREMENT

HYD PWR

INTRODUCTION

This checklist contains abbreviated inspection requirements that are necessary to determine and ensure the integrity of the aircraft for flight.

APPLICATION

Seven Day Inspection requirements shall be accomplished every seven calendar days and have an allowable deviation requirement of plus or minus three calendar days.

When an aircraft is in an Out Of Reporting Status the Seven Day Inspection Requirements may be waived during the period of time the aircraft is physically Out Of Reporting.

When the aircraft is placed back in a Reporting Status, the Seven Day Inspection Requirements must be completed prior to the aircraft being made available for flight. At the same time the baseline for the Seven Day Inspection Requirements shall also be reestablished in the tracking system used for the aircraft.

CAUTION

Ensure area around aircraft is free of foreign objects and all safety items are properly positioned, removed or installed, as applicable.

ii

DATE

March 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

Change Summary:

Card Number Date Revision i March 1, 2005 Original ii March 1, 2005 Original 1 March 1, 2005 Original 2 March 1, 2005 Original 3 March 1, 2005 Original 4 March 1, 2005 Original

DATE

March 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

ELEC PWR

1.

1.a.

1.b.

1.c.

1.d.

1.e.

1.f.

1.g.

1.h.

1.i.

1.i.1.

1.i.2.

THINK SAFETY

NB 6 Parachute, Front Cockpit:

Serial Number Record Check Exterior Of Container For Fraying, Contamination, Dampness, Oil or Acid Stains, Other Obvious Damage Check Exposed Spring Opening Bands For Damage, Security, Correct Number Check Harness For Fraying, Correct Number, Condition Of Harness Keepers Check External Tackings, 13 Total Correct Number and Security Check Back Pad Attachment Check Exterior Hardware For Damage and Corrosion Check Ripcord Handle Pockets For Obstructions and Security Of Handles In The Pockets Ripcord Protector and Base Plate Protector Flaps Open Through The Cable Eye Check Ripcord Check For Security Exposed Grommets and Cones

DATE

March 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

1.i.3.

1.i.4.

1.i.5.

1.i.6.

1.i.7.

2.

2.a.

2.b.

2.c.

2.d.

2.e.

2.f.

2.g.

NB 6 Parachute, Front Cockpit (Continued):

Check Ripcord Cable Loose or Bent Pins, Broken Strands, Corrosion Check Snap Fasteners For Security and Corrosion Check Exposed Ripcord Arming Cable For Dents, Nicks, Cuts, Corrosion, Security Check Exposed Power Cable For Dents, Nicks, Cuts, Corrosion, Security Ripcord Protector and Base Plate Protector Flaps Close

NB 6 Parachute, Rear Cockpit:

Serial Number Record Check Exterior Of Container For Fraying, Contamination, Dampness, Oil or Acid Stains, Other Obvious Damage Check Exposed Spring Opening Bands For Damage, Security, Correct Number Check Harness For Fraying, Correct Number, Condition Of Harness Keepers Check External Tackings, 13 Total Correct Number and Security Check Back Pad Attachment Check Exterior Hardware For Damage and Corrosion

DATE

March 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

2.

2.h.

2.i.

2.i.1.

2.i.2.

2.i.3.

2.i.4.

2.i.5.

2.i.6.

2.i.7.

NB 6 Parachute, Rear Cockpit (Continued):

Check Ripcord Handle Pockets For Obstructions and Security Of Handles In The Pockets Ripcord Protector and Base Plate Protector Flaps Open Through The Cable Eye Check Ripcord Check For Security Exposed Grommets and Cones Check Ripcord Cable Loose or Bent Pins, Broken Strands, Corrosion Check Snap Fasteners For Security and Corrosion Check Exposed Ripcord Arming Cable For Dents, Nicks, Cuts, Corrosion, Security Check Exposed Power Cable For Dents, Nicks, Cuts, Corrosion, Security Ripcord Protector and Base Plate Protector Flaps Close

No Further Entries On This Card

DATE

March 1, 2005

CHANGE #

Original

CARD NUMBER: NAVAIR (PMA 273) 01-50-T34C-600-6-2

TITLE: SEVEN DAY INSPECTION CHECKLIST

ELEC PWR

3.

3.a.

3.b.

3.c.

3.d.

3.e.

3.f.

4.

4.a.

4.b.

5.

5.a.

5.b.

Lubrication Requirements:

Note 1: Utilize VV-L-800 General Purpose Lubricating Oil to lubricate the following items.

Hinge Points Battery Access Door Hinge Points Avionics Bay Access Door Hinge Points Rudder Trim Tab Hinge Points Elevator Trim Tabs Hinge Points Aileron Trim Tabs Hinge Points Cowling Doors Landing Gear Oleo Struts:

Note 2: Utilizing Mil-H-83282C Hydraulic Fluid to clean, wipe down and coat the exposed chrome areas of the landing gear oleo struts.

Nose Landing Gear Clean/Wipe Down and Coat With a Light Film Main Landing Gear, Both Clean/Wipe Down and Coat With a Light Film Tire Inflation Requirements:

Main Landing Gear Tires, Both Check For Proper Inflation Using A Certified Tire Gauge. Proper Inflation Is 90 ± 2 PSI.

Nose Landing Gear Tire Check For Proper Inflation Using A Certified Tire Gauge. Proper Inflation Is 70 ± 2 PSI.

No Further Entries On This Card

File details come from the government source that posted it.