ATT 03 Draft QASP.docx

DOCX document 129 KB Posted

Attached to
T-34/T-44/T-6 Aircraft Maintenance and Contractor Logistics Support
Solicitation number
N61340-18-FOSR-0001
Issued by

About this file

N61340-18-FOSR-0001 Attachments

View the file

Other files

File Type Posted
ATT 18 T6 NASCC IMRL.pdf PDF
ATT 48 El Centro Gov Fac.pdf PDF
ATT 51 FRCSE Gov Fac.pdf PDF
ATT 35 NASCC ALSS.pdf PDF
ATT 43 T44C MEL.pdf PDF
N6134018FOSR0001_ATT_3_thru_17.zip ZIP file
ATT 45 NASWF Gov Fac.pdf PDF
ATT 67 NASP_NASWF WD.pdf PDF
ATT 79 01-50-T44A-600-6-1.pdf PDF
ATT 66 Oceana WD.pdf PDF
ATT 10 T44 Corr Ctrl Pln.pdf PDF
ATT 86 01-250-13-600-011-6.2.pdf PDF
N6134018FOSR0001_ATT_58_thru_72.zip ZIP file
N6134018FOSR0001_ATT_73_thru_89.zip ZIP file
ATT 05 Acronyms.pdf PDF
ATT 25 IMRL Supp CTW4.pdf PDF
ATT 83 01-50-T44C-600-6-3.pdf PDF
ATT 09 T6 Corr Ctrl Pln.pdf PDF
ATT 71 Miramar WD.pdf PDF
ATT 21 NASP GFP.pdf PDF
ATT 13 T44 Paint Schm.pdf PDF
ATT 23 NASCC GFM.pdf PDF
ATT 52 Miramar Gov Fac.pdf PDF
ATT 72 Hist Proj Flt Hrs.pdf PDF
ATT 87 01-250-13-600-16-6.2.pdf PDF
ATT 68 Fallon WD.pdf PDF
ATT 34 NASP ALSS.pdf PDF
ATT 56 PegNetAccRqstFrm.pdf PDF
ATT 08 T6 Turn Qual.pdf PDF
N6134018FOSR0001_ATT_39_thru_57.zip ZIP file
ATT 47 Lemoore Gov Fac.pdf PDF
ATT 40 AC Rec_Logs.pdf PDF
ATT_96_PACT_guide.pdf PDF
ATT 14 T34 Oceana Paint Schm.pdf PDF
ATT 15 T34 Miramar Paint Schm.pdf PDF
ATT 12 Gen Paint Schm.pdf PDF
ATT 11 T34 Corr Ctrl Pln.pdf PDF
ATT 63 NASCC CBA.pdf PDF
ATT 41 T6B MEL.pdf PDF
ATT 17 T34 El Centro Paint Schm.pdf PDF
ATT 32 Oceana GFP.pdf PDF
ATT 19 NASWF GFP.pdf PDF
ATT 27 IMRL Supp CTW5.pdf PDF
ATT 65 NASP NASWF CBA Pilots.pdf PDF
ATT 85 01-250-13-600-005-6.2.pdf PDF
ATT 58 NASWF CBA.pdf PDF
ATT 33 NASWF ALSS.pdf PDF
ATT 69 El Centro WD.pdf PDF
ATT 78 01-50-T44A-600-6 .pdf PDF
ATT 74 01-50-T34C-600-6-1.pdf PDF
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP) For T-34, T-44 and T-6 Contractor Logistics Support (CLS) Effort

This document is provided for information purposes only and does not constitute contractual requirements

For

T-34/T-44/T-6 Aircraft Maintenance and Contractor Logistics Support (CLS)

Contract Number: <upon award, enter contact number> Contractor Name: < upon award, enter contractor name >

5/23/2018

TABLE OF CONTENTS

1. Purpose3
2. Authority3
3. Government Roles and Responsibilities4
4. Contractor Representatives5
5. Performance Standards5
6. Incentives6
7. Methods of Quality Assurance Surveillance6
8. Ratings6
9. Documenting Performance6
10. Frequency of Measurement8
11. Record Retention8

Enclosures

1. Performance Standards9
2. Data Performance Standards11
3A. Surveillance Activity Checklist for MOBs13
3B. Surveillance Activity Checklist for Satellite Sites13
4. Performance Incentives14
5. Corrective Action Report15
6. Performance Assessment Report16
7. Customer Complaint Form17
8. Definitions For Evaluation Areas/Ratings18

For AP: N61340-18-R-1199

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

For T-34/T-44/T-6 Aircraft Maintenance and Contractor Logistics Support (CLS) Contract Number: <upon award, enter contact number> Contractor Name: < upon award, enter contractor name >

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) is a Government developed document used to ensure systematic quality assurance methods are used in the administration of the Contractor Logistics Support (CLS) effort. The intent is to ensure the Contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract. The QASP provides a systematic method to evaluate performance for the stated contract.

This QASP describes how the Government will observe, evaluate and document the Contractor’s performance in meeting the critical performance standards identified in the Performance Work Statement (PWS). Specifically, the QASP will identify the Government resources responsible for monitoring performance and surveillance methods that will be utilized in determining the quality level of services and products delivered under the contract.

This QASP does not detail how the Contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. This document may be changed at any time upon review and approval by the Contracting Officer’s Representative (COR) and Procuring Contracting Officer (PCO), and supported by the PWS. The COR will review the QASP and coordinate changes with the Contractor, when necessary. Updates shall ensure the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the PCO/ Administrative Contracting Officer (ACO), the Contractor and Government officials implementing surveillance activities.

The following FAR clauses apply: 52.246-4 Inspection of Services – Fixed-Price, 52.246-5 Inspection of Services – Cost-Reimbursement, or 52.246-6 Inspection of Services – Time-and-Material and Labor-Hour.

2. AUTHORITY

Authority for issuance of this QASP is provided under Federal Acquisition Regulation (FAR) Part 46 of the Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract action. This acceptance is to be executed by the PCO/ACO or a duly authorized representative.

3. GOVERNMENT ROLES AND RESPONSIBILITIES

Procuring Contracting Officer (PCO) and Administrative Contracting Officer (ACO) – Individuals appointed to enter into procurement (PCO) or administration (ACO) of contracts and make related determination and findings on behalf of the Government. The PCO and ACO ensure performance of all necessary actions for effective contracting ensuring compliance with the terms of the contract and safe-guards the interests of the United States in the contractual relationship. They are ultimately responsible for the final determination of the adequacy of the Contractor’s performance. The PCO will issue a delegation letter detailing all responsibilities of the ACO. The ACO will communicate on a regular basis decisions made and provide copies of all administrative modifications on to the PCO. The ACO will calculate the incentive/disincentive amount in accordance with the Performance Incentive Clause in the contract and then notify the Contractor.

Assigned PCO: <enter name> Organization or Agency: <enter organization or Agency name> Telephone: <enter number> Email: <enter address>

Assigned ACO: <enter name> Organization or Agency: <enter organization or Agency name> Telephone: <enter number> Email: <enter address>

Contracting Officer’s Representative (COR) – An individual appointed in writing by the PCO to act as the authorized representative to assist in administering the contract. The limitations of authority are contained in a written letter of appointment. The COR will be appointed in the resulting Task Orders. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government's behalf. Any changes that the Contractor deems as affecting contract price, terms or conditions shall be referred to the PCO for action. The COR is responsible for providing continuous technical oversight of the Contractor's performance and reporting early identification of performance problems to the PCO/ACO. The COR will track and provide data with respect to performance metrics. This data will be provided to the ACO on a monthly basis.

Assigned COR: <enter name> Organization or Agency: <enter organization or Agency name> Telephone: <enter number> Email: <enter address>

Quality Assurance Program Manager (QAPM) – The QAPM manages the Government QASP. Information received from the Quality Assurance Specialist (QAS) will be reviewed and sent to the COR. The COR will send the data to the Defense Contract Management Agency (DCMA) and the PMA-273 Integrated Program Team Lead (IPTL).

Assigned QAPM: <enter name> Organization or Agency: <enter organization or Agency name> Telephone: <enter number> Email: <enter address>

Quality Assurance Specialist (QAS) – The QAS conducts Government Quality Assurance Surveillance oversight of the Contractor’s Quality/Maintenance Program. The QAS gathers data in a monthly report and forwards it on to the Chief of Naval Air Training Command (CNATRA) Detachment Officer in Charge (DET OIC) who then distributes this information to the QAPM.

Assigned QAS/QAR: <enter name> Organization or Agency: <enter organization or Agency name> Telephone: <enter number> Email: <enter address>

CNATRA Property Administrator (PA) – The CNATRA PA oversees all supply and Government Property (GP) related performance of the Contractor. The PA will coordinate with the CNATRA DET site -level Technical Points of Contact (TPOCs) to ensure supply and GP management and data are collected and monitored by the Government. The CNATRA PA will promulgate a schedule of the Contractor’s annual Property Management System Audit and random audits no later than 16 September each year to the CNATRA DET Site TPOC and the Contractor. The findings will be reported back to the CNATRA PA for review and action.

Assigned PA: <enter name> Organization or Agency: <enter organization or Agency name> Telephone: <enter number> Email: <enter address>

4. CONTRACTOR REPRESENTATIVES

The following employees of the Contractor will serve as the Contractor’s direct representatives for this contract as assigned.

Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>

Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>

Title: <enter title> Telephone: <enter number> Email: <enter address>

5. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the Contractor exceeds, meets or does not meet these standards. Enclosures (1), (2), (3A) and (3B) include performance standards found in paragraph 5.0 (Performance and Technical Requirements) of the PWS. The Government shall use these standards to determine Contractor performance and shall compare Contractor performance to the Acceptable Quality Level (AQL).

6. INCENTIVES AND DISINCENTIVES

The Government will use incentives and disincentives. Any incentives will be based on exceeding performance standards. Any disincentives will be based on not meeting performance standards. Information about incentives and disincentives can be found in the Performance Metrics clause in Section H of the contract. Enclosure (4) is the Performance Incentives matrix.

7. METHODS OF QUALITY ASSURANCE (QA) SURVEILLANCE

The Government will assess the Contractor’s performance in accordance with (IAW) the Performance Metrics clause in Section H-1 of the contract and Section 5.0 of the PWS requirements.

Enclosures (1) through (3) in this QASP list the methods of surveillance. Enclosures (5) through (7) are the forms used to capture and report corrective actions, performance assessments, and complaints. Enclosure (8) provides definitions for evaluation areas/ratings. Enclosures (1) through (8) will be utilized by the COR and ACO in the administration of this contract.

Regardless of the surveillance method, the COR shall always contact the Contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR shall be responsible for monitoring the Contractor’s performance in meeting a specific performance standard/AQL.

8. RATINGS

Metrics and methods used are designed to determine if performance exceeds, meets, or does not meet a given standard and AQL. Enclosure (8), Definitions For Evaluation Areas and Ratings, will be used to annotate evaluation ratings.

9. DOCUMENTING PERFORMANCE

9.1 Contractor Performance Assessment Report System (CPARS)

The market place for information technology, engineering, and management support services is very competitive. As such, the successful offeror has a vested interest in the Government generated Contractor Performance Assessment Reporting System (CPARS) rating under this contract. The COR is required to provide annual performance assessments in the Navy’s CPARS which will be used in documenting Contractor performance. This evaluation will be one determinant in issuance of additional Task Orders. The Government assessment for this procurement will address the quality of product or service, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.

9.2 Government Inspections. The Government QAS will perform inspections to ensure Contractor compliance with the appropriate paragraphs of the PWS, other Government requirements, and the Contractor’s own procedures, and will record the results of the inspections.

All PWS tasks may be inspected on any appropriate basis, at a frequency determined primarily by the COR, PMA-273 IPTL and/or at the direction of the PCO.

9.2.1 Acceptable Performance

The Government shall document positive performance. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.

9.2.2 Unacceptable Performance

When unacceptable performance occurs, the COR shall inform the Contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case, the COR shall document the discussion and place it in the COR file. When the COR determines formal written communication is required, the COR shall prepare a Contract Action Requests (CAR) and present it to the Contractor's task manager or on-site representative. The CAR form is Enclosure (5) of this QASP.

The Contractor shall acknowledge receipt of the CAR in writing. The Contractor shall be given a reasonable time after notification to correct the unacceptable performance. The Contractor shall notify the COR if the time allowed for correction is not adequate.

The Government shall review the Contractor's corrective action plan to determine acceptability. The COR will not consider the corrective action(s) complete until all deficiencies have been corrected and determined by the QAS/QAPM to be adequate (Government follow up). Contractor non-responsiveness, deficiencies not adequately addressed or corrected after notification of such, or estimated dates of completion that are not acceptable to the QAS/QAPM will be forwarded to the COR and PCO/ACO for action.

9.3 Corrective Action Requests (CAR)

The COR will maintain overall visibility of all CARs. The PMA-273 IPTL will follow up to verify the implementation and effectiveness of the Contractor’s actions before CAR close out. The level of CAR issued depends on the nonconformance in terms of severity, frequency, and previous corrective actions. If the Contractor is not responsive to lower-level CARs, the COR will escalate the matter. CARs may become part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, disincentives, or other actions deemed necessary by the PCO/ACO.

When written, CARs must be specific in identifying the exact deficiency and the Contractor personnel with whom the deficiency was discussed. All written CARs will require the Contractor to identify the root cause of the deficiency, action taken to correct the specific deficiency, action taken to prevent recurrence, action taken to determine if other products/aircraft are affected by same/similar deficiencies, and the date when the corrective action will be implemented. The QAR will perform a follow-up audit to assure that the corrective action has effectively resolved the deficiency.

A Corrective Action Log shall be established by the COR to maintain and track CARs issued to the Contractor. CARs shall be recorded and tracked by a control number.

XXXXXX - Contract Number TBA
CY - Calendar Year (i.e., 2017, 2018, etc.)
XXXX – Site CAR issued to

01 – First CAR for the calendar year

10. FREQUENCY OF MEASUREMENT

10.1. Frequency of Measurement. All inspection records, observations, monthly reports, CARs, and other pertinent data will be reviewed monthly by the COR to analyze whether the negotiated frequency of measurement is appropriate for the work being performed. This does not preclude the necessity of adjusting surveillance due to specific incidents or deficiencies noted. The review should include at a minimum a description of the data analyzed, a description of the conclusions/results, and actions planned/taken. These reviews will be documented and records maintained by the COR.

If one or more standards are unsatisfactory, further evaluation is required to determine if the Contractor's overall performance is unsatisfactory. The COR will assess the results of each performance standard, taking into consideration the importance and criticality of each in relation to the total service being evaluated. The COR will document the overall evaluation.

The COR will immediately notify the Contractor as to whether work performance has been satisfactory or not. If the Contractor's performance is unsatisfactory, a CAR should be issued and other actions, such as increasing the level of surveillance, may be considered.

10.2. Frequency of Performance Assessment Meetings. The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.

11. RECORD RETENTION

In addition to providing quarterly reports to the PCO and ACO, the COR will maintain a complete quality assurance file. The file will contain all copies of reports, evaluations, recommendations and actions related to the Government’s performance of the quality assurance function. Particular emphasis should be placed on deficiencies and corrective actions, procedural disapprovals, and rejection of product. Surveillance records must be retained for a minimum of one year after completion of the end item. All such records will be maintained for the life of the contract. The COR will forward these records to the PCO and ACO at termination or completion of the contract.

ATTACHMENT 03 N61340-18-FOSR-0001

T-34/44/6 QASP

ENCLOSURE 1 - PERFORMANCE STANDARDS

Sites
Focus Area
Standard / AQL
Surveillance Method / Inspector
Incentives
Rating
Main Operating Bases (MOBs)
Performance including Ready for Production Availability (RFPA)
STD: Sufficient number of aircraft available IAW PWS paragraph 5.2.10.4.c

AQL: average >98% RFPA for each aircraft at each site Review: Daily Status Report

- Monthly Contract Summary Report

- Monthly Quality Data Evaluation (QDE) Report

QAR, COR

See Performance Metrics clause in Section H-1 of the Contract

Main Operating Bases (MOBs)
Performance including Sortie Completion Rate (SCR)
STD: Sufficient number of aircraft available IAW PWS paragraph 5.2.10.4.b

AQL: average of >98% SCR for each aircraft at each site Review: Daily Status Report

- Monthly Contract Summary Report

- Monthly QDE Report

See Performance Metrics clause in Section H-1 of the Contract

All Sites (MOBs and Satellite Sites)
Quality/Safety
STD: Quality Contract Minimums (per PoP) IAW PWS paragraph 5.5.1

AQL: No Level III, IV, or repeat CARs; no more than 6 Level II CARs of which no more than 3 SOF, and no repeated CARs Review: Daily Status Report

- Monthly Contract Summary Report

- Monthly QDE Report

QAR, COR

See Performance Metrics clause in Section H-1 of the Contract

Main Operating Bases (MOBs)
Service Life Maintenance Management (SLMM)
STD: All aircraft shall fly so that in-flight hours are IAW PWS paragraph 5.8.1

AQL: SLMM average > 80% across all MOBs Review: Daily Status Report

- Monthly Contract Summary Report

- Monthly QDE Report

QAR, COR

See Performance Metrics clause in Section H-1 of the Contract

All Sites (MOBs and Satellite Sites)
Aircraft maintained IAW OEM manuals
STD: Compliance with OEM manuals IAW PWS paragraph 5.0

AQL: Zero deviations Audit, Monitor, and Observation

None

ENCLOSURE 2 - DATA PERFORMANCE STANDARDS

Sites
Description
Standard (STD)/AQL
Surveillance Method / Inspector
Incentive
Ratings
Main Operating Bases (MOBs)
Fixed Maintenance
STD: CDRL A009, Daily Aircraft Status Report (DASR) IAW PWS paragraph 5.2.1.25

AQL: 100% Acceptable on each submission Review daily report

QAR, CNATRA N4 Class Desk and ACO N/A

Main Operating Bases (MOBs)
Quality Control Program Plan Updates
STD: CDRL A021, Quality Control Program Plan Updates IAW PWS paragraph 5.5.4

AQL: 100% Acceptable on each submission.

Review the periodic update plan

QAS, CNATRA N4 Class Desk, QAPM, and ACO N/A

All Sites (MOBs) and Satellite Sites)
Logistics Management Information System (LMIS), Data Collection, Documentation and Reporting Requirements

STD: CDRL A026, Maintenance Information System (MIS) Report IAW PWS paragraph 5.11.1.1

AQL: 100% Acceptable on each submission.

First one due 45 days after full performance begins and subsequent monthly Review monthly report

QAS, CNATRA N4 Class Desk, QAPM, COR, and ACO N/A

Main Operating Bases (MOBs)
Supply Management
STD: CDRL A008, Monthly Maintenance Plan (MMP) IAW PWS paragraph 5.2.1.23, 5.2.6.3, and 5.12.1

AQL: 100% Acceptable on each submission Review the monthly plan

QAS, CNATRA N4 Class Desk, QAPM and ACO N/A

Main Operating Bases (MOBs) and Satellite Sites
Service Life Maintenance Management (SLMM)
STD: CDRL A023, Service Life Maintenance Management (SLMM) Activity Tracking Report IAW PWS paragraphs 5.8.2 and 5.9.1

AQL: 100% Acceptable on each submission.

First submission due EOM +5 days, and subsequent monthly Review periodic report

QAS, CNATRA N4 Class Desk, COR, and PMA-273 IPTLs N/A

Main Operating Bases (MOBs)
Service Life Maintenance Management (SLMM)
STD: CDRL A024, Service Life Maintenance Management (SLMM) Performance Report IAW PWS paragraph 5.8.2

AQL: 100% Acceptable on each submission.

First submission due EOM +5 days, and subsequent monthly Review periodic report

QAS, CNATRA N4 Class Desk, COR, and PMA-273 IPTLs N/A

Main Operating Bases (MOBs) and Satellite Sites
Fixed Maintenance
STD: CDRL A005, Contractors Flight and Ground Operations Plan IAW PWS paragraph 5.2.1.8

AQL: 100% Acceptable on each submission.

Review plan

QAS, CNATRA N4 Class Desk, COR, ACO, and PMA-273 IPTLs N/A

Enclosure 3 – Surveillance Activity Checklists (3A and 3B) Surveillance Activity Checkists: The Government (ACO and COR) will perform surveillance on a monthly basis utilizing the below checklist and produce a Monthly Contract Summary Report. The Government will utilize the data to calculate the Contractor’s quarterly performance metrics. The Government will utilize the Surveillance Activity Checklist (SAC) report, as well as other information, to prepare the CPAR.

ENCLOSURE 3A - SURVEILLANCE ACTIVITY CHECKLIST FOR MOBS

ENCLOSURE 3B - SURVEILLANCE ACTIVITY CHECKLIST FOR SATELLITE SITES

Enclosure 4 – Performance Incentives

Assessment Period
Acceptable Performance Definition
How Measured
Incentives
Base Year
All measurement areas rated “Satisfactory” or above. See enclosure (8).
Annually
(+) Contractor receives a positive assessment (CPAR), appropriate for the quality of service provided.

(-) Contractor receives a negative assessment (CPAR), appropriate for the quality of service provided.

Option Year 1
All measurement areas rated “Satisfactory” or above. See enclosure (8).
Annually
(+) Contractor receives a positive assessment (CPAR), appropriate for the quality of service provided.

(-) Contractor receives a negative assessment (CPAR), appropriate for the quality of service provided.

Option Year 2
All measurement areas rated “Satisfactory” or above. See enclosure (8).
Annually
(+) Contractor receives a positive assessment (CPAR), appropriate for the quality of service provided.

(-) Contractor receives a negative assessment (CPAR), appropriate for the quality of service provided.

Option Year 3
All measurement areas rated “Satisfactory” or above. See enclosure (8).
Annually
(+) Contractor receives a positive assessment (CPAR), appropriate for the quality of service provided.

(-) Contractor receives a negative assessment (CPAR), appropriate for the quality of service provided.

Option Year 4
All measurement areas rated “Satisfactory” or above. See enclosure (8).
Annually
(+) Contractor receives a positive assessment (CPAR), appropriate for the quality of service provided.

(-) Contractor receives a negative assessment (CPAR), appropriate for the quality of service provided.

Option Year 5
All measurement areas rated “Satisfactory” or above. See enclosure (8).
Annually
(+) Contractor receives a positive assessment (CPAR), appropriate for the quality of service provided.

(-) Contractor receives a negative assessment (CPAR), appropriate for the quality of service provided.

Option Year 6
All measurement areas rated “Satisfactory” or above. See enclosure (8).
Annually
(+) Contractor receives a positive assessment (CPAR), appropriate for the quality of service provided.

(-) Contractor receives a negative assessment (CPAR), appropriate for the quality of service provided.

ENCLOSURE 5 - CORRECTIVE ACTION REPORT (CAR)

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY |_| MAJOR |_| MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

|_| ACCEPTED |_| REJECTED

12. CLOSE DATE

ENCLOSURE 6 -PERFORMANCE ASSESSMENT REPORT (PAR)

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER
2. CONTRACTOR
3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
5. COR PHONE
6. SUSPENSE DATE

I. PERFORMANCE

7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)

|_| NEW

|_| REPEAT

|_| NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY

III. ACTION CORRECTED

14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE

15. COR REMARKS (REQUIRED)

6. CONTRACTOR REPRESENTATIVE REMARKS

ENCLOSURE 7 - CUSTOMER COMPLAINT RECORD

CUSTOMER COMPLAINT RECORD

DATE/TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION

BUILDING NUMBER

INDIVIDUAL

PHONE NUMBER

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED/VALIDATED BY

ENCLOSURE 8 - DEFINITIONS FOR EVALUATION AREAS AND RATINGS

1. EVALUATION AREAS. All tasks (which include sub-task and specific emphasis) will be assessed focusing on the following areas:

Quality of Product or Service
Assess the contractor’s conformance to contract requirements, specifications and standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety and health standards). Include, as applicable, a discussion of the accuracy of reports/data; the extent to which the products/services provided meet the specifications of the contract; the extent to which the contractor’s work measures up to commonly accepted technical or professional standards; and the degree of Government technical direction required to solve problems that arise during performance.
Schedule
Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules and administrative requirements. This assessment of the contractor’s adherence to the required delivery schedule should include the contractor’s efforts during the assessment period that contribute to or affect the schedule variance. This element applies to contract closeout activities as well as contract performance
Cost Control
Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Include, as applicable, a discussion of the contractor’s ability to perform within the total estimated cost (what is the relationship of the negotiated costs and budgeted costs to actuals); innovative approaches implemented by the contractor that resulted in cost savings; the timeliness, accuracy, and completeness of invoices; and the adequacy of the contractor’s budgetary internal controls.
Business Relations
Assess the integration and coordination of all activity needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior, customer satisfaction, timely award and management of subcontracts. Include, as applicable, a discussion of customer orientation displayed by the contractor; degree of satisfaction with amount of interaction between the contractor and the government; adequacy of the contractor’s accounting, billing, and estimating systems and the contractor’s management of Government Furnished Property (GFP) if a substantial amount of GFP has been provided to the contractor under the contract; timeliness of awards to subcontractors and management of subcontractors, including subcontractor costs; efforts taken to ensure early identification of subcontract problems and the timely application of corporate resources to preclude subcontract problems from impacting overall prime contractor performance; and the amount of prime contractor effort devoted to managing subcontracts and whether the subcontractors were an integral part of the contractor’s team.
Management of Key Personnel
Assess the contractor’s performance in selecting, retaining, supporting, and replacing, when necessary, key personnel. Include, as appropriate, a discussion of how well the contractor matched the qualifications of key positions, as described in the contract, with the personnel who filled the positions; whether the contractor supported key personnel so they were able to work effectively; corrective actions taken by the contractor in the event key personnel did not perform well; and extent to which replacements for key personnel met or exceeded the qualifications of the position as described in the contract.
Utilization of Small Business
Assess whether the contractor provided maximum practicable opportunity for Small Business to participate in contract performance consistent with efficient performance of the contract. Assess compliance with all terms and conditions in the contract relating to Small Business participation, including FAR 52.219-8, Utilization of Small Businesses, FAR 52.219-9, Small Business Subcontracting Plan (DoD Contracts), and DFARS 252.219-7003, Small Business Subcontracting Plan. Assess any small business participation goals which are stated separately in the contract. Assess achievement on each individual goal stated within the contract or subcontracting plan, including good faith effort if the goal was not achieved.
Other Areas
Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

2. EVALUATION RATINGS.

2.1 Evaluation Ratings

Exceptional
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.

image1.png image2.png

File details come from the government source that posted it.