Attachment 7 - PP Questionnaire.rtf
RTF text file 175 KB Posted
- Solicitation number
- N61339-09-R-0002
About this file
Attachment 7
Text of this file
PAST PERFORMANCE QUESTIONNAIRE
ACADEMIC & SIMULATOR TRAINING FOR THE TC-12B AIRCRAFT
RFP N61339-09-R-0002
Attachment (7) TC-12B Past Performance Questionnaire N61339-09-R-0002
- 1 -
Past Performance Questionnaire (PPQ) for Solicitation N61339-09-R-0002
Please complete this form and submit it using one of the following methods:
(Do not send copies to any other address)
1) Email to alan.wright@navy.mil
2) Fax to 407-380-4742
3) Mail to Naval Air Warfare Center Training Systems Division (NAWCTSD) ATTN: Code 25323/Alan Wright 12350 Research Parkway Orlando, FL 32826-3275
Please refer any questions on this matter to the NAWCTSD Contract Specialist, Alan Wright (407) 380-4066, e-mail: alan.wright@navy.mil
NOTES TO THE EVALUATOR: Please use the following ratings to respond to the enclosed questions. Please check one response for each question on the following pages and provide comments as appropriate.
PAST PERFORMANCE QUESTIONNAIRE RATINGS
EXCEPTIONAL – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
SATISFACTORY - Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
MARGINAL - Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
UNSATISFACTORY - Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
A. GENERAL CONTRACT INFORMATION: (Section A is to be filled out by offeror)
1. Contractor Name/Address:
2. Cage Code: _____________________
3. Contract Number: ___________________________________
4. Contract Award Date: _______________________
5. Supply or Service Contract: _________________________________________
6. Brief Description of Effort (Product and/or Service Provided):
7. Contract Type (FFP, CPFF, CPAF, T&M, IDTC etc.): _______________________________
8. Competitively or Non-Competitively Awarded: _________________________________
9. Contract Value: _______________________________________
10. Contract Completion Date: ____________________________
11. Contact Information: List name, address, telephone number, e-mail address for:
a. Contracting Officer:___________________________________________________
b. Program Manager:___________________________________________________ _________________________________________________________
c. Contracting Officer Representative (COR), if applicable:____________________
B. RELEVANCY AND QUALITY OF CONTRACTOR’S PAST PERFORMANCE:
1. Did this effort involve classroom/ground school instruction?
YES
NO
If YES, please rate the quality of the instruction provided: E VG S M U N/A
Comment:
2. Did this effort involve simulator instruction?
If YES, please rate the quality of the instruction provided: E VG S M U N/A
Comment:
3. Did this effort involve development of a flight training device(s)?
(a) If YES, please rate the quality of the flight training device(s) provided: E VG S M U N/A
Comment:
4. Did this effort involve maintenance of any flight training device(s)?
If YES, please rate the quality of the maintenance provided: E VG S M U N/A
Comment:
5. Did this effort involve curriculum development?
If YES, please rate the quality of curriculum developed: E VG S M U N/A
Comment:
6. If this effort involved curriculum development, was it delivered timely?
If YES, please rate the delivery provided: E VG S M U N/A
Comment:
7. Did this effort involve scheduling of students?
(a) If YES, please rate the quality of the scheduling services provided: E VG S M U N/A
Comment:
8. To what extent did the contractor adhere to contract delivery schedules?
E VG S M U N/A
Comment:
9. To what extent were the contractor’s reports and documentation accurate, complete, and timely?
Comment:
10. Rate the contractor’s degree of initiative and ability to quickly identify problems (technical, management, budget, or schedule).
Comment:
11. Describe the Contractor’s willingness and ability to solve the problems identified.
Comment:
12. How effective was the contractor in ensuring a smooth transition during the phase-in/phase-out period of the contract? E VG S M U N/A
Comment:
13. Rate the contractor’s ability/willingness to commit adequate resources?
Comment:
14. What is the contractor’s history on changing personnel throughout contract performance?
Comment:
15. If a person did not perform well, rate and describe the action taken by the contractor to correct this.
Comment:
C. BUSINESS RELATIONS:
1. How cooperative, business-like and concerned was the Contractor with the interests of the end-user (i.e. student)?
Comment:
2. To what extent was the contractor effective in interfacing with your organization’s staff/personnel?
Comment:
3. Rate the interaction between the contractor and government personnel involved in administering the contract (i.e. PCO, ACO, Program Manager, COR/QAE, etc.)
Comment:
4. Describe the overall communication between contractor and Government.
Comment:
D. CUSTOMER SATISFACTION:
1. Are training evaluations completed by students at the end of each course?
(a) If YES, please rate how the majority of the students evaluate the quality of the instruction received:
Comment:
2. How flexible is the Contractor in accommodating last minute scheduling changes?
Comment:
3. How flexible is the contractor in accommodating requests for training during weekends and/or holidays when required?
Comment:
4. How often was the trainer non-operational during scheduled training events?
Never
Rarely
Sometimes
Often
Very Often
Comment:
5. How would you rate this company’s overall performance on this contract?
Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Comment:
6. Complete the following sentence by choosing one of the phrases below:
Given what I know today about the contractor’s ability to execute what was promised in the proposal, I ______________________ award a contract to this contractor today, given that I had a choice.
Definitely would not
Probably would not
Might or might not
Probably would
Definitely would
Comment:
E. SUBCONTRACT PAST PERFORMANCE HISTORY:
1. Did the contractor perform as the prime contractor?
2. If yes, were there any subcontractors? And if so, how many subcontractors were managed (in terms of organizations – not size of workforce managed)?
3. If Prime with subcontractor effort: To what extent did the contractor coordinate, integrate, and provide for effective subcontractor management?
Comment:
4. If Contractor performed as a Subcontractor, please provide a short description of the effort performed and the extent of the contractor’s subcontracted effort (i.e., the contractor performed 20% of the overall effort and played a significant role in overall performance or performed 20% of the overall effort in a more minor support role) in performance and cost:
F. ADVERSE ACTIONS PAST PERFORMANCE
1. Has this contract been partially or completely terminated for default or convenience?
No
Yes
Default
Convenience
(a) If Yes, please explain (e.g., inability to meet cost, performance or delivery schedules):
2. Are there any pending terminations?
Default
Convenience
(a) If Yes, please explain and indicate status:
3. Have any show cause or cure notices been issued?
(a) If Yes, please explain and indicate status:
4. Have there been, or is there an ongoing investigation regarding a violation of the labor or wages requirements of the Service Contract Act of 1965 or Fair Labor Standards Act?
(a) If Yes, please explain and indicate status:
G. RECORD OF SUPERIOR PAST PERFORMANCE
1. Was this Contractor nominated for any contract-related performance awards (i.e. Small Business, Quality Improvement, etc.)?
(a) If YES, please provide a short description of the award and why the Contractor was nominated for this award.
Comment: _________________________________________
2. Did the Contractor’s performance exceed the required contract performance?
(a) If YES, please provide a short description of the above level performance and identify the value you would associate with this effort.
Comment: _______________________
H. EVALUATOR INFORMATION
1. Evaluator’s Organization:
Organization Name/Address:
2. Organization Description:
3. Evaluator Identification: (NOTE: This information will not be released)
(a) Evaluator Name and Title:
(b) Evaluator Signature:
(c) Evaluator Voice and FAX Numbers:
(d) Evaluator E-Mail:
Other files
| File | Type | Posted |
|---|---|---|
| N6133909R0002 Amend 0002.zip | ZIP file | |
| N6133909R0002 Amend 0001.zip | ZIP file | |
| Attchment 3 - CNATRA Inst1542.153B.pdf | ||
| N6133909R0002.doc | DOC document | |
| Attachment 1 - TC12B Configuration.doc | DOC document | |
| Attachment 6 - Visual Database.doc | DOC document | |
| Attchment 5 - MESM with changes.doc | DOC document | |
| Attachment 4 - Floor Plan.doc | DOC document | |
| Attachment 2 - CNATRA Inst1542.147C.pdf | ||
| Attachment 2 - CNATRA Inst1542.147C.pdf | ||
| Attachment 7 - PP Questionnaire.rtf | RTF text file | |
| Attachment 4 - Floor Plan.doc | DOC document | |
| Attachment 6 - Visual Database.doc | DOC document | |
| Attchment 5 - MESM with changes.doc | DOC document | |
| DRAFT N61339-09-R-0002.doc | DOC document | |
| Attachment 1 - TC12B Configuration.doc | DOC document | |
| Attchment 3 - CNATRA Inst1542.153B.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .