L-VT04 Additional Ind Questions-Gov Response 18-21.docx
DOCX document 13 KB Posted
- Solicitation number
- N61331-22-T-VT04
About this file
This document contains details for a federal solicitation seeking video surveillance system services. The Naval Surface Warfare Center Panama City Division has a requirement to design, assemble, and install an advanced video surveillance system for the Ocean Simulation Facility at the Navy Experimental Dive Unit in Panama City, Florida. The scope of work involves replacing existing cameras, displays, control systems, routing and processing technology, recording devices, cabling and connectors to modernize the current system. All equipment must be NDAA and TAA compliant. This is a total small business set aside with a NAICS code of 334310 and size standard of 750 employees. Interested small businesses must RSVP by December 7th, 2021 to attend a required site visit on December 13th where an overview will be provided and facilities can be inspected.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| L-VT04 Additional Ind Questions-Gov Response 22-24.docx | DOCX document | |
| C-CDRL VideoSurveillanceSystem.docx | DOCX document | |
| Site Visit Questions.pdf | ||
| L- VT04 Ind Questions-Gov Response.docx | DOCX document | |
| CLAUSES.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N61331-22-T-VT04
Industry Questions and Government Response
Continuation Sheet 1/21/2022
18. Regarding project milestones: Requesting that the COR develop the project milestones so that clins can be assigned to each milestone activity.
The contract CLIN structure will be based on milestones for items such as the PDR, CDR, Installation, Test Acceptance, documentation delivery, etc. Milestones will be established based on the award date and anticipated completion date.
19. Regarding progress payments: What is the expectation for progress payments if there is a lump sum cost submitted?
This will be a firm fixed price contract. Invoicing will be accepted for completed CLIN’s only.
20. Will the successful offeror be allowed to bill for materials once they arrive on site?
Invoicing will be accepted for completed CLIN’s only.
21. Is the customer able to extend the period of performance?
The contract POP cannot extend beyond 12 months from the award date.
If an option to extend the POP is included in the contract, it would not exceed Aug 2023.