AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er questions. Please see the Summary of Changes for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6133119R0017

X 9B. DATED (SEE ITEM 11)

09-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Aug-2019

CODE

NSWC PANAMA CITY (L. HAWTHORNE)

LINDA.HAWTHORNE@NAVY.MIL

850-235-5386

110 VERNON AVE

PANAMA CITY FL 32407-7001

N61331 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X

N6133119R0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

QUESTIONS AND ANSWERS

1. Front Lower Tuck shows webbing at the bottom front, without seam allowance. Is this correct? See below.

Answer: Yes

2. The pattern shows a stitch line for the Front Lower Tuck. The annotation is only made on the top line.

Should this be stitched on all 3 sides, leaving the bottom open? See below.

Answer: Yes, it shall be stitched on all three sides leaving the bottom open.

3. The marker piece for the Cummerbund Hook and loop shows 3 separate lines for stitching vertically, while the drawings show a box-X and 2 lines of stitching. Which is correct? See below, Answer: The patterns are correct.

4. The marker piece for the Cummerbund Hook and loop measures 8.04 wide by 6.66 tall, however when sewn, this is too large for the cummerbund sides. Should this be 8 x 6 instead? Please clarify correct size.

Answer: Yes, it shall measure 8”X6”.

5. In Amendment 0002, question #3, you list the drag strap webbing cut lengths as M=19-1/2” and L=20”, however those lengths are too short if we are to follow the marks on the patterns. Please confirm lengths.

See below.

Answer: Follow marks on the pattern. Approximate cut lengths for both is 40 inches. Previously provided response erroneously provided measurements on the half.

6. In Amendment 0002, question #7, you list the male and female buckle parts as National Molding

4494/4507. Part 4507 is a non-adjustable female buckle, yet the drawings specify that both sides of the cummerbund buckles are adjustable. Should this be National molding parts 4494/4915? See below.

Answer: Only the male buckle shall be adjustable; PD drawings will be updated in a future revision to mitigate confusion.

(End of Summary of Changes)