EXHIBIT A
Offeror:
SECTION B - SUPPLIES OR SERVICES AND PRICES EXHIBIT A
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | BASE YEAR |
| A001 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT | | | | | |
| FFP | | | | | |
| Designated ship's INTERIOR SPACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A002 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR BULKHEAD SURFACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A003 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING | | | | | |
| FFP | | | | | |
| To bare metal, prepare, prime and paint designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| | | | MAX | | |
| | | | NET AMT | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A004 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP | | | | | |
Designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces).
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A005 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTERIOR DECK AREAS in accordance "C" section herein. (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A006 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare and prime designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A007 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A008 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A009 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare, prime and paint under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A010 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A011 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A012 | | 50,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A013 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE DECKS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A014 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's NON-MACHINERY FLOODABLE AND NON-FLOODABLE VOIDS AND BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A015 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP The HULL SURFACES (FREE BOARD) ON BERTHING BARGES ONLY FROM THE UPPER BOOTTOP LIMITS TO THE TOP OF THE DESIGNATED DECK EDGE LEVEL in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A016 | | 120,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP | | | | | |
CARRIER ISLAND STRUCTURE, MASTS, SMOKE STACKS, WEAPONS ELEVATORS, BOAT DECKS AND CATWALKS in accordance "C" section herein.
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A017 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| CLEAN AND PREPARE TO BARE METAL FFP Designated ship's MACHINERY INTAKE SURFACES ONLY TO SSPC-SP11 in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A018 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTAKE/UPTAKE SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT |
| A019 | | | Lot | | |
| ACCELERATED DELIVERY | | | | |
| FFP | | | | |
| It is anticipated that 10 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items A001 through A018 and A020AA through A020AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Ordering Officer at a ____% percentage additional fee of the proposed CLIN price. (Zero % will be the additional charge if name is provided by the offeror). ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this CLIN: | | | | |
Total amount of CLINS A001 through A018 and A020AA through A020AB = $____________ (multiplied by) 10 percent = ______________(multiplied by percentage proposed for this CLIN) of _______%= _______________(insert this total amount in the unit price and amount spaces provided for (CLIN A019)
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY UNDEFINED | UNIT | UNIT PRICE | MAX AMOUNT |
| A020 | | | | UNDEFINED | $0.00 |
| ADDITIONAL WORK | | | | |
| FFP | | | | |
| The Government anticipates that there may be a possibility that additional work may become necessary during the performance of work ordered by Delivery Orders to this contract. The offeror shall fill in the SubClins and the resultant values will be used for purposes of evaluation and for pricing of any additional work required during performance of the contract. The total number of labor hours and total material price shall be negotiated by the Ordering Officer at the time a modification to the Delivery Order is processed. | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A020AA | | 500 | MAN HOURS | | $0.00 | $0.00 |
| LABOR HOURS-STRAIGHT TIME | | | | | |
| FFP | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| A020AB | | 50,000 | U.S. DOL | | $0.00 | $0.00 |
| MATERIALS | | | | | |
| FFP | | | | | |
| Offerors shall list $1.00 for Unit Price to equal total item amount of 50,000. | | | | | |
Total Base Year Price $0.00
EXHIBIT B
Offeror:
SECTION B - SUPPLIES OR SERVICES AND PRICES EXHIBIT B
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | OPTION YEAR 1 |
| B001 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT | | | | | |
| FFP | | | | | |
| Designated ship's INTERIOR SPACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B002 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR BULKHEAD SURFACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B003 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING | | | | | |
| FFP | | | | | |
| To bare metal, prepare, prime and paint designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| | | | MAX | | |
| | | | NET AMT | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B004 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP | | | | | |
Designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces).
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B005 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTERIOR DECK AREAS in accordance "C" section herein. (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B006 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare and prime designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B007 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B008 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B009 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare, prime and paint under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B010 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B011 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B012 | | 50,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B013 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE DECKS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B014 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's NON-MACHINERY FLOODABLE AND NON-FLOODABLE VOIDS AND BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B015 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP The HULL SURFACES (FREE BOARD) ON BERTHING BARGES ONLY FROM THE UPPER BOOTTOP LIMITS TO THE TOP OF THE DESIGNATED DECK EDGE LEVEL in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B016 | | 120,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP | | | | | |
CARRIER ISLAND STRUCTURE, MASTS, SMOKE STACKS, WEAPONS ELEVATORS, BOAT DECKS AND CATWALKS in accordance "C" section herein.
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B017 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| CLEAN AND PREPARE TO BARE METAL FFP Designated ship's MACHINERY INTAKE SURFACES ONLY TO SSPC-SP11 in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B018 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTAKE/UPTAKE SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT |
| B019 | | | Lot | | |
| ACCELERATED DELIVERY | | | | |
| FFP | | | | |
| It is anticipated that 10 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items B001 through B018 and B020AA through B020AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Ordering Officer at a ____% percentage additional fee of the proposed CLIN price. (Zero % will be the additional charge if name is provided by the offeror). ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this CLIN: | | | | |
Total amount of CLINS B001 through B018 and B020AA through B020AB = $____________ (multiplied by) 10 percent = ______________(multiplied by percentage proposed for this CLIN) of _______%= _______________(insert this total amount in the unit price and amount spaces provided for (CLIN B019)
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY UNDEFINED | UNIT | UNIT PRICE | MAX AMOUNT |
| B020 | | | | UNDEFINED | $0.00 |
| ADDITIONAL WORK | | | | |
| FFP | | | | |
| The Government anticipates that there may be a possibility that additional work may become necessary during the performance of work ordered by Delivery Orders to this contract. The offeror shall fill in the SubClins and the resultant values will be used for purposes of evaluation and for pricing of any additional work required during performance of the contract. The total number of labor hours and total material price shall be negotiated by the Ordering Officer at the time a modification to the Delivery Order is processed. | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B020AA | | 500 | MAN HOURS | | $0.00 | $0.00 |
| LABOR HOURS-STRAIGHT TIME | | | | | |
| FFP | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| B020AB | | 50,000 | U.S. DOL | | $0.00 | $0.00 |
| MATERIALS | | | | | |
| FFP | | | | | |
| Offerors shall list $1.00 for Unit Price to equal total item amount of 50,000. | | | | | |
Total Option Year 1 Price $0.00
EXHIBIT C
Offeror:
SECTION B - SUPPLIES OR SERVICES AND PRICES EXHIBIT C
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | OPTTION YEAR 2 |
| C001 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT | | | | | |
| FFP | | | | | |
| Designated ship's INTERIOR SPACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C002 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR BULKHEAD SURFACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C003 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING | | | | | |
| FFP | | | | | |
| To bare metal, prepare, prime and paint designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| | | | MAX | | |
| | | | NET AMT | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C004 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP | | | | | |
Designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces).
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C005 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTERIOR DECK AREAS in accordance "C" section herein. (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C006 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare and prime designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C007 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C008 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C009 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare, prime and paint under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C010 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C011 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C012 | | 50,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C013 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE DECKS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C014 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's NON-MACHINERY FLOODABLE AND NON-FLOODABLE VOIDS AND BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C015 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP The HULL SURFACES (FREE BOARD) ON BERTHING BARGES ONLY FROM THE UPPER BOOTTOP LIMITS TO THE TOP OF THE DESIGNATED DECK EDGE LEVEL in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C016 | | 120,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP | | | | | |
CARRIER ISLAND STRUCTURE, MASTS, SMOKE STACKS, WEAPONS ELEVATORS, BOAT DECKS AND CATWALKS in accordance "C" section herein.
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C017 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| CLEAN AND PREPARE TO BARE METAL FFP Designated ship's MACHINERY INTAKE SURFACES ONLY TO SSPC-SP11 in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C018 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTAKE/UPTAKE SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT |
| C019 | | | Lot | | |
| ACCELERATED DELIVERY | | | | |
| FFP | | | | |
| It is anticipated that 10 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items C001 through C018 and C020AA through C020AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Ordering Officer at a ____% percentage additional fee of the proposed CLIN price. (Zero % will be the additional charge if name is provided by the offeror). ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this CLIN: | | | | |
Total amount of CLINS C001 through C018 and C020AA through C020AB = $____________ (multiplied by) 10 percent = ______________(multiplied by percentage proposed for this CLIN) of _______%= _______________(insert this total amount in the unit price and amount spaces provided for (CLIN C019)
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY UNDEFINED | UNIT | UNIT PRICE | MAX AMOUNT |
| C020 | | | | UNDEFINED | $0.00 |
| ADDITIONAL WORK | | | | |
| FFP | | | | |
| The Government anticipates that there may be a possibility that additional work may become necessary during the performance of work ordered by Delivery Orders to this contract. The offeror shall fill in the SubClins and the resultant values will be used for purposes of evaluation and for pricing of any additional work required during performance of the contract. The total number of labor hours and total material price shall be negotiated by the Ordering Officer at the time a modification to the Delivery Order is processed. | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C020AA | | 500 | MAN HOURS | | $0.00 | $0.00 |
| LABOR HOURS-STRAIGHT TIME | | | | | |
| FFP | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| C020AB | | 50,000 | U.S. DOL | | $0.00 | $0.00 |
| MATERIALS | | | | | |
| FFP | | | | | |
| Offerors shall list $1.00 for Unit Price to equal total item amount of 50,000. | | | | | |
Total Option Year 2 Price $0.00
EXHIBIT D
Offeror:
SECTION B - SUPPLIES OR SERVICES AND PRICES EXHIBIT D
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | OPTION YEAR 3 |
| D001 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT | | | | | |
| FFP | | | | | |
| Designated ship's INTERIOR SPACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D002 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR BULKHEAD SURFACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D003 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING | | | | | |
| FFP | | | | | |
| To bare metal, prepare, prime and paint designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| | | | MAX | | |
| | | | NET AMT | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D004 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP | | | | | |
Designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces).
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D005 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTERIOR DECK AREAS in accordance "C" section herein. (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D006 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare and prime designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D007 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D008 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D009 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare, prime and paint under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D010 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D011 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D012 | | 50,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D013 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE DECKS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D014 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's NON-MACHINERY FLOODABLE AND NON-FLOODABLE VOIDS AND BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D015 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP The HULL SURFACES (FREE BOARD) ON BERTHING BARGES ONLY FROM THE UPPER BOOTTOP LIMITS TO THE TOP OF THE DESIGNATED DECK EDGE LEVEL in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D016 | | 120,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP | | | | | |
CARRIER ISLAND STRUCTURE, MASTS, SMOKE STACKS, WEAPONS ELEVATORS, BOAT DECKS AND CATWALKS in accordance "C" section herein.
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D017 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| CLEAN AND PREPARE TO BARE METAL FFP Designated ship's MACHINERY INTAKE SURFACES ONLY TO SSPC-SP11 in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D018 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTAKE/UPTAKE SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT |
| D019 | | | Lot | | |
| ACCELERATED DELIVERY | | | | |
| FFP | | | | |
| It is anticipated that 10 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items D001 through D018 and D020AA through D020AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Ordering Officer at a ____% percentage additional fee of the proposed CLIN price. (Zero % will be the additional charge if name is provided by the offeror). ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this CLIN: | | | | |
Total amount of CLINS D001 through D018 and D020AA through D020AB = $____________ (multiplied by) 10 percent = ______________(multiplied by percentage proposed for this CLIN) of _______%= _______________(insert this total amount in the unit price and amount spaces provided for (CLIN D019)
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY UNDEFINED | UNIT | UNIT PRICE | MAX AMOUNT |
| D020 | | | | UNDEFINED | $0.00 |
| ADDITIONAL WORK | | | | |
| FFP | | | | |
| The Government anticipates that there may be a possibility that additional work may become necessary during the performance of work ordered by Delivery Orders to this contract. The offeror shall fill in the SubClins and the resultant values will be used for purposes of evaluation and for pricing of any additional work required during performance of the contract. The total number of labor hours and total material price shall be negotiated by the Ordering Officer at the time a modification to the Delivery Order is processed. | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D020AA | | 500 | MAN HOURS | | $0.00 | $0.00 |
| LABOR HOURS-STRAIGHT TIME | | | | | |
| FFP | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| D020AB | | 50,000 | U.S. DOL | | $0.00 | $0.00 |
| MATERIALS | | | | | |
| FFP | | | | | |
| Offerors shall list $1.00 for Unit Price to equal total item amount of 50,000. | | | | | |
Total Option Year 3 Price $0.00
EXHIBIT E
Offeror:
SECTION B - SUPPLIES OR SERVICES AND PRICES EXHIBIT D
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | OPTION YEAR 4 |
| E001 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT | | | | | |
| FFP | | | | | |
| Designated ship's INTERIOR SPACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E002 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR BULKHEAD SURFACES in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E003 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING | | | | | |
| FFP | | | | | |
| To bare metal, prepare, prime and paint designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces). | | | | | |
| | | | MAX | | |
| | | | NET AMT | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E004 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP | | | | | |
Designated ship's INTERIOR DECK AREAS in accordance "C" section herein (Excludes machinery spaces).
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E005 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTERIOR DECK AREAS in accordance "C" section herein. (Excludes machinery spaces). | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E006 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare and prime designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E007 | | 1,500 | Square Foot | | $0.00 | $0.00 |
| PREPARE AND PRIME FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E008 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's EXTERIOR DECK AREAS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E009 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| REMOVE EXISTING DECK COVERING FFP To bare metal, prepare, prime and paint under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E010 | | 2,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Under designated ship's AQUEOUS FILM FORMING FOAM (AFFF) PROPORTIONATING UNITS (INSIDE THE COAMING) in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E011 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E012 | | 50,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E013 | | 5,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's MACHINERY SPACE DECKS in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E014 | | 3,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's NON-MACHINERY FLOODABLE AND NON-FLOODABLE VOIDS AND BILGES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E015 | | 25,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP The HULL SURFACES (FREE BOARD) ON BERTHING BARGES ONLY FROM THE UPPER BOOTTOP LIMITS TO THE TOP OF THE DESIGNATED DECK EDGE LEVEL in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E016 | | 120,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP | | | | | |
CARRIER ISLAND STRUCTURE, MASTS, SMOKE STACKS, WEAPONS ELEVATORS, BOAT DECKS AND CATWALKS in accordance "C" section herein.
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E017 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| CLEAN AND PREPARE TO BARE METAL FFP Designated ship's MACHINERY INTAKE SURFACES ONLY TO SSPC-SP11 in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E018 | | 20,000 | Square Foot | | $0.00 | $0.00 |
| PREPARE, PRIME AND PAINT FFP Designated ship's INTAKE/UPTAKE SPACES in accordance "C" section herein. | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT |
| E019 | | | Lot | | |
| ACCELERATED DELIVERY | | | | |
| FFP | | | | |
| It is anticipated that 10 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items E001 through E018 and E020AA through E020AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Ordering Officer at a ____% percentage additional fee of the proposed CLIN price. (Zero % will be the additional charge if name is provided by the offeror). ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this CLIN: | | | | |
Total amount of CLINS E001 through E018 and E020AA through E020AB = $____________ (multiplied by) 10 percent = ______________(multiplied by percentage proposed for this CLIN) of _______%= _______________(insert this total amount in the unit price and amount spaces provided for (CLIN E019)
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY UNDEFINED | UNIT | UNIT PRICE | MAX AMOUNT |
| E020 | | | | UNDEFINED | $0.00 |
| ADDITIONAL WORK | | | | |
| FFP | | | | |
| The Government anticipates that there may be a possibility that additional work may become necessary during the performance of work ordered by Delivery Orders to this contract. The offeror shall fill in the SubClins and the resultant values will be used for purposes of evaluation and for pricing of any additional work required during performance of the contract. The total number of labor hours and total material price shall be negotiated by the Ordering Officer at the time a modification to the Delivery Order is processed. | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E020AA | | 500 | MAN HOURS | | $0.00 | $0.00 |
| LABOR HOURS-STRAIGHT TIME | | | | | |
| FFP | | | | | |
| ITEM NO | SUPPLIES/SERVICES | MAX QUANTITY | UNIT | UNIT PRICE | MAX AMOUNT | |
| E020AB | | 50,000 | U.S. DOL | | $0.00 | $0.00 |
| MATERIALS | | | | | |
| FFP | | | | | |
| Offerors shall list $1.00 for Unit Price to equal total item amount of 50,000. | | | | | |
Total Option Year 4 Price $0.00
PRICING SUMMARY
Offeror:
| SECTION B - SUPPLIES OR SERVICES AND PRICES EXHIBIT A-E |
| Department use only for administrative purposes. (Offerors do not fill in) |
| ITEM NO | SUPPLIES/SERVICES | Qty | Unit | Unit Price | Amount |
| 0001 | BASE YEAR EFFORT | | | | $0.00 |
| REFERENCE EXHIBIT "A" FOR BASE YEAR EFFORT | | | | |
| 1001 | OPTION I - SECOND YEAR EFFORT | $0.00 |
| REFERENCE EXHIBIT "B" FOR OPTION 1 - SECOND YEAR EFFORT | |
| 2001 | OPTION II - THIRD YEAR EFFORT | $0.00 |
| REFERENCE EXHIBIT "C" FOR OPTION 2 - THIRD YEAR EFFORT | |
| 3001 | OPTION III - FOURTH YEAR EFFORT | $0.00 |
| REFERENCE EXHIBIT "D" FOR OPTION 3 - FOURTH YEAR EFFORT | |
| 4001 | OPTION IV - FIFTH YEAR EFFORT | $0.00 |
| REFERENCE EXHIBIT "E" FOR OPTION 4 - FIFTH YEAR EFFORT | |
TOTAL FOR ALL 5 YEARS EFFORT $0.00