Government Responses to Requests for Clarification

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO: 997-11-001

TITLE: Drydocking and Undocking; accomplish

PARA. NO: 3.2, 3.2.1, 3.2.2

PAGE NO: 1 of 6, 2 of 6

ITEM NO: 111-80-001

TITLE: Training Operations Center and

Berthing Installation, Boat Alt 226NS/3C;

accomplish

PARA. NO: 2.2 -2.4

PAGE NO: 1

ITEM NO:

TITLE:

PARA. NO:

PAGE NO:

ITEM NO:

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: 110-21-001, others

TITLE: ABS Surveyor

PARA. NO: 3.1

PAGE NO: 1 of 2

ITEM NO: Solicitation

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 5:

Please clarify the language in para 3.1 of work item 110-21-001 and others work items in regards to the ABS surveyor for T&Is. Will the contractor be responsible for providing the ABS surveyor or will they be provided by the

Government?

GOVERNMENT RESPONSE: The ABS surveyor will be provided by the Government.

CONTRACTOR QUESTION 1: Paragraph 3.2 of Item 997-11-001 requires contractor to provide a sound dock, dockmaster, qualified personnel, and equipment certified in accordance with 2.2…which is MIL-

STD-1625. Sections HQ C-2-0021 on page 19 of 97, and HQ C-2-0022 on page 20 of 97 of the solicitation also require the use of drydocks and drydock facilities certified in accordance with MIL-STD-1625. However, paragraphs 3.2.1 and 3.2.2 allude to using an independent third party certification for the drydock and dockmaster. Is an independent third party drydock certification and contractor certified dockmaster acceptable in lieu of certification to MIL-STD-1625 for this contract? If MIL-STD-1625 certification is not waived for this contract, the government could be severely limiting the competition for this contract to as few as one contractor. Please waive the requirement for certification to MIL-STD-1625 and allow independent third party certification.

GOVERNMENT RESPONSE: Work item 997-11-001 was updated via an ERRATA. To receive the ERRATA, please send an email request to Morgan Myrick, Contracting Officer, and Desireé

Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 2: References for paragraphs 2.2-2.4 are missing from the package.

GOVERNMENT RESPONSE: The references have been added via the

AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

GOVERNMENT RESPONSE: Navy took vessel in 2016. The USNS

NARRAGANSETT has been active.

CONTRACTOR QUESTION 3: I see the Narraganett was contracted to

DonJon Marine for a time, when did the Navy take the vessel back over and has it been active?

CONTRACTOR QUESTION 4: Considering that the current bid date is

May 02, 2017 and as of this date we have not yet received all of the references, and along with the complexity of the bid, which will require a number of specialty subcontractors, and extensive material research, please extend the bid opening date to May 16, 2017. This should give all contractors the opportunity to prepare proposals that are most advantageous to the government

GOVERNMENT RESPONSE: The proposal due date has been amended via Amendment 0001.

CONTRACTOR POC:

REQUEST FOR SPECIFICATION CLARIFICATION

Attachment J-5

CONTRACTOR PHONE:

**Newly answered questions are indicated by a BOLD

Government Response.**

DATE OF REQUEST: SOLICITATION NO: N50054-17-R-0003

TITLE: USNS NARRAGANSETT (T-AFT-167) Docking Phased Maintenance Availability (DPMA) MARMC POC: Desireé Logan

CONTRACTOR: MARMC PHONE: 757-400-0329

GOVERNMENT RESPONSE: NoCONTRACTOR QUESTION 6:

Will Q.E.D. Systems be involved as the third party planner on this solicitation as they are on other MARMC solicitations?

ITEM NO: 426-80-001

TITLE: Speed Log Replacement

PARA. NO: 2

PAGE NO: 1 of 3

ITEM NO: 441-80-001

TITLE: SEATEL ANTENNA RELOCATE

PARA. NO: 2

PAGE NO: 1 OF 1

ITEM NO: 562-11-001

TITLE: RUDDER, STEERING GEAR AND

SKEG

PARA. NO: 3.2

PAGE NO: 2 OF 6

ITEM NO: 575-11-001

TITLE: STERN ROLLER FOUNDATION

PARA. NO: 2

PAGE NO: 1 of 2

ITEM NO: 672-00-100

TITLE: CONVERT LINE LOAD LOCKER

PARA. NO: 2

PAGE NO: 1of 2

ITEM NO: 593-11-001

TITLE: Collecting, Holding and Transfer

(CHT) Piping, tank, level sensors and lift stations; repair and replace

PARA. NO: 3.11 & 3.12

PAGE NO: 3 of 4

ITEM NO: 123-11-002

TITLE: Ballast Tank Inspection, repair, preserve; accomplish

PARA. NO: 2.4

PAGE NO: 1 of 5

ITEM NO: Multiple

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: 111-80-001

TITLE: Training Operations Center and

Berthing Installation, Boat Alt 226NS/3C

PARA. NO: 2.0

PAGE NO: 1 of 2

ITEM NO: 672-00-001

TITLE: Convert Line Load Lockers to Storage

Spaces BOAT ALT 226NS/8C

PARA. NO: 2.2

PAGE NO: 1 of 2

ITEM NO: 245-11-001

TITLE: Propeller, repair

CONTRACTOR QUESTION 16: The work item references drawing

5111286, Line Locker Conversion to Storerooms which was not provided on either CD of references. Please provide the referenced drawing.

GOVERNMENT RESPONSE: Reference has been added via the

AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 17: The drawings indicate that the vessel is equipped with controllable pitch propeller system manufactured by

Propulsion Systems Inc. The work item is written as if the vessel is equipped with fixed propellers and intregral hubs, as inspection of bluing for propeller bore contact fit, and the installation of the propeller nut and keeper is included in the work item. The work item does not completely correspond to the equipment installed onboard the vessel. Paragraph 3.12 directs the contractor to remove the equipment listed in 1.3. Paragraph 1.3 lists (1) Port and (1) Starboard Propeller, not propeller assembly. Is it the governments intention for the contractor to remove the (4) propeller blades and hub for each propeller assembly from the vessel?

GOVERNMENT RESPONSE: Work Item upated via ERRATA. To receive the ERRATA, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 14:

Will the ABS be provided by the Government or to be provided by the

Contractor?

GOVERNMENT RESPONSE: Answered in question 5

CONTRACTOR QUESTION 15: The work item references the following drawings that were not provided on each of the reference Cds received.

5111375 Partial Foc'sle Deck and Details Removal; 5111376 Berth, Training Operation Center, T-SCIF Scantlings and Details; 5111382

Training operations Center and T-SCIF False Floors Installation. Please provide the referenced drawings.

GOVERNMENT RESPONSE: Reference has been added via the

AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

GOVERNMENT RESPONSE: Paragraphs 3.11 and 3.12 were updated via an ERRATA. To receive the ERRATA, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract

Specialist at MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 13:

Item 123-11-002 is for Ballast Tank inspection and repairs; however, drawing 633-30698 Rev A, Hull Zinc Installation is for the hull. The

Contractor requests drawing be provide for Ballast Tank Zincs.

GOVERNMENT RESPONSE: To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé

Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 12:

Paragraph 3.11 tasks the removal and installation of the equipment listed in

1.3.7, and paragraph 3.12 requires the installation and connection of new level sensors listed in 1.3.7. However, the only location listed under paragraph 1.3 is 1.3.1, which lists the entire CHT System. Similarly, paragraph 3.2 directs the installation and testing of new material listed in

1.3 and there isn't any material listed under 1.3. Please clarify.

CONTRACTOR QUESTION 11: PLEASE PROVIDE MISSING

REFERENCE 2.2

GOVERNMENT RESPONSE: Reference has been added via the

AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 7: The following references are missing from the package - 2.3-2.5 and 2.8. Please provide.

GOVERNMENT RESPONSE: References have been added via the

AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 10: PLEASE PROVIDE MISSING

REFERENCE 2.3

CONTRACTOR QUESTION 8: PLEASE PROVIDE MISSING

REFERENCE 2.3

GOVERNMENT RESPONSE: Reference has been added via the

AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

GOVERNMENT RESPONSE: Ayers Marine ElectronicsCONTRACTOR QUESTION 9: PLEASE PROVIDE SOURCE FOR

AUTHORIZED TECHNICAL REPRESENTIVE

GOVERNMENT RESPONSE: Reference have been added via the

AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

PARA. NO: 1.3, 3.2, 3.12 thru 3.12.4

PAGE NO: 1 of 7, 3 of 6

ITEM NO: 245-11-001

TITLE: Propeller, repair

PARA. NO: 1.3, 3.2, 3.12 thru 3.12.4

PAGE NO: 1 of 7, 3 of 6

ITEM NO: 123-11-001

TITLE: Tank Inspection and Repair, accomplish

PARA. NO: 3.2 and 3.4

PAGE NO: 3 of 4

ITEM NO: 633-21-001

TITLE: Impressed Current Cathodic Protection

(ICCP) System; inspect and repair

PARA. NO: 3.2.1

PAGE NO: 2 of 6

ITEM NO: 321-80-001

TITLE: Shore Power System Receptacle

Replace and Relocate, BOATALT 226NS/4C

PARA. NO: 1.3.2; 3.3

PAGE NO: 1 of 2

ITEM NO: 589-11-001

TITLE: Allied Marine Crane; repair

PARA. NO: 3.7

PAGE NO: 2

ITEM NO: 589-11-001

TITLE: Allied Marine Crane;repair

PARA. NO: 3.10

PAGE NO: 3

ITEM NO: 589-11-001

TITLE: Allied Marine Crane;repair

PARA. NO: 3.10

PAGE NO: 3

ITEM NO: 589-11-001

Allied Marine Crane; repair

PARA. NO: 3.11

PAGE NO: 3

ITEM NO: 583-11-001/589-11-001

TITLE: Marine Crane and Marine Davit repair

PARA. NO: 3.1

PAGE NO: 1

ITEM NO: 583-11-001

Marine Allied Marine Davit repair

PARA. NO: 3.2 - 3.2.1

PAGE NO: 1

583-11-001

TITLE: AlliedMarine Davit repair

PARA. NO: 3.7

CONTRACTOR QUESTION 27: Is the Allied Tech Rep required for removal, disassembly, inspection and reinstallation as required in item

589-11-001?

GOVERNMENT RESPONSE: Yes, para 3.2.1

CONTRACTOR QUESTION 28: Paragraph 3.7 states to accomplish full teardown, inspection/ (OVERHAUL) using 2.2 through 2.9. Is overhaul based on the inspection report required paragraph 3.7.5.1 i.e additional repairs and material?

GOVERNMENT RESPONSE: No, a full overhaul is required. The required report in 3.7.5.1 is used for OQE of the inspection and overhaul.

GOVERNMENT RESPONSE: 583-11-001 2.2 is a NAVSEA STD tech manual, 2.4 is the tech manual from Allied. 589-11-001 2.2 crane serial number is 1712 SUPERVISOR to acquire Ref. To receive the ERRATA, please send an email request to Morgan

Myrick, Contracting Officer, and Desireé Logan, Contract

Specialist at MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 22: Paragraph 3.7 states to accomplish full teardown, inspection/ (OVERHAUL) using 2.2 through 2.9. Is overhaul based on the inspection report required paragraph 3.7.5.1 i.e additional repairs and material?

GOVERNMENT RESPONSE: No, a full overhaul is required. The required report in 3.7.5.1 is used for OQE of the inspection and overhaul.

CONTRACTOR QUESTION 23: Paragraph 3.10 states to assemble, install, align, adjust and connect each component dissassemble, inspected and repaire in 3.4, however 3.4 states to remove and dispose of fluids. Is correct paragraph 3.7?

GOVERNMENT RESPONSE: Yes, paragraph 3.7 is the correct reference. To receive the ERRATA, please send an email request to

Morgan Myrick, Contracting Officer, and Desireé Logan, Contract

Specialist at MARMC_NRFK_411_PROCUREMENT@navy.mil.

GOVERNMENT RESPONSE: Paragraph 3.10 has been updated via an ERRATA. To receive the ERRATA, please send an email request to Morgan Myrick, Contracting Officer, and Desireé

Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 24: Paragraph 3.10 calls out to install new gaskets, o-rings, bushings, pins, keys, studs, bolts, nuts and parts listed in

5.3.2 - 5.3.7, hosever no parts are listed in paragraph 5. Is material required for renewal based on condition found report in paragrapn

3.7.5.1?

CONTRACTOR QUESTION 25: Paragraph 3.11 states to accomplish 009-

107 for cleaning and flushing of all new disturbed hydraulic piping. Is the intent of this paragraph to perform a HOT OIL FLUSH and submitting a PCP and would it also include hoses removed and hard blanked?

GOVERNMENT RESPONSE: Yes, a PCP is required per SI 107 para 3.4, hoses must be reistalled prior to accomplising 009-107.

CONTRACTOR QUESTION 26: Reference 2.2 is not for a Allied Davit.

Is reference 2.2 incorrect?

CONTRACTOR QUESTION 17: The drawings indicate that the vessel is equipped with controllable pitch propeller system manufactured by

Propulsion Systems Inc. The work item is written as if the vessel is equipped with fixed propellers and intregral hubs, as inspection of bluing for propeller bore contact fit, and the installation of the propeller nut and keeper is included in the work item. The work item does not completely correspond to the equipment installed onboard the vessel. Paragraph 3.12 directs the contractor to remove the equipment listed in 1.3. Paragraph 1.3 lists (1) Port and (1) Starboard Propeller, not propeller assembly. Is it the governments intention for the contractor to remove the (4) propeller blades and hub for each propeller assembly from the vessel?

GOVERNMENT RESPONSE: Work Item upated via ERRATA. To receive the ERRATA, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 18: Paragraph 3.2 requires the contractor to provide the services of an authorized technical representative to provide on-site technical support for inspection, special tools, reports and adjustment of the equipment. The work item does not direct the contractor to disassemble the propeller hub, which normally requires an autrhorized technical representative. If the contractor is not completing a hub overhaul, is the technical representative required?

GOVERNMENT RESPONSE: Errata created to include overhaul of the

Hub. To receive the ERRATA, please send an email request to Morgan

Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 19: Paragraph 3.4 of the work it em directs the contractor to replace shell/hull plate and associated support structure that has detiorated 20% loss or more and interior bulkhead and support structure deteriorated 22% or more referenced from the tank inspection complete in paragraph 3.2. Paragraph 3.2 calls for a visual inspection of each tank listed in paragraph 1.2. Determination of palting deterioration should be measured using an NDE method such as Ultrasonic Testing. Will the government change paragraph 3.2 to include Ultrasonic testing requirements for the tank plating?

GOVERNMENT RESPONSE: UT's are in WI 110-21-001 interior

Gauging.

CONTRACTOR QUESTION 20: Please provide contact information for the authorized and qualified technical representative for this item.

GOVERNMENT RESPONSE: Contact information was included via an

ERRATA in paragraph 4.4. To receive the ERRATA, please send an email request to Morgan Myrick, Contracting Officer, and Desireé

Logan, Contract Specialist at

MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 21: Please provide nameplate data for HPU listed in 1.3.2 for accomplishment of 009-17 as required in para 3.3.

GOVERNMENT RESPONSE: The Government's response is forthcoming.

PAGE NO: 2

ITEM NO: 583-11-001

TITLE: Allied Marine Crane;repair

PARA. NO: 3.10

PAGE NO: 3

ITEM NO: 583-11-001

TITLE: Allied Marine Davit ;repair

PARA. NO: 3.10

PAGE NO: 3

ITEM NO: 583-11-001

Allied Marine Crane; repair

PARA. NO: 3.12

PAGE NO: 3

ITEM NO: 259-11-002

TITLE: Main, Ship Service Diesel Engine and

Fire Pump Intake/Exhaust Piping Ssystems, repairs

PARA. NO: 3.2.1

PAGE NO: 2 of 4

ITEM NO: 259-11-002

TITLE: Main, Ship Service Diesel Engine and

Fire Pump Intake/Exhaust Piping Ssystems, repairs

PARA. NO: 3.11

PAGE NO: 3 of 4

ITEM NO: 631-11-001

TITLE: Bilge; preserve

PARA. NO: 1.2.1

PAGE NO: 1 of 4

ITEM NO:

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 35: Questions #4 and Amendment 0001 extended the bid date from May 02, 2017 to May 05, 2017, however today's

(04/18/17) ship check has generated some additional findings and subsequent questions, which will be submitted soonest. We learned at the shipcheck that an ERRATA is forthcoming. Please consider the amount of time and resources it takes to disperse this information to our subcontractors and material vendors and the time it takes to return their pricing. At that point we must evaluate each offer and incorporate into our bid to ensure submittal of the most advantageous proposal to the

Government. Assuming the ERRATA will be issued in a timely manner, please extend the bid opening date to May 16, 2017.

GOVERNMENT RESPONSE: The Government's response is forthcoming.

CONTRACTOR QUESTION 32: Is it the government's intention to have the contractor remove all intake and exhaust insulation from the engines to the intakes and the engines to the exhaust stacks for inspection?

GOVERNMENT RESPONSE: The Government's response is forthcoming.

CONTRACTOR QUESTION 33: In accordance with NAVSEA STD 009-

11 and MIL-STD-769, what type of insulation and lagging (covering) does the government wish to be installed on the intakes and exhausts once repairs are completed?

GOVERNMENT RESPONSE: The Government's response is forthcoming.

GOVERNMENT RESPONSE: The Government's response is forthcoming.

CONTRACTOR QUESTION 34: Please provide the compartment number for the space the government has indicated as the Bow Thruster

Compartment and wishes to have preserved.

CONTRACTOR QUESTION 29: Paragraph 3.10 states to assemble, install, align, adjust and connect each component dissassemble, inspected and repaire in 3.6, however 3. states to disconjnect and remove davit. Is correct paragraph 3.7?

GOVERNMENT RESPONSE: Yes, paragraph 3.7 is the correct reference. To receive the ERRATA, please send an email request to

Morgan Myrick, Contracting Officer, and Desireé Logan, Contract

Specialist at MARMC_NRFK_411_PROCUREMENT@navy.mil.

CONTRACTOR QUESTION 30: Paragraph 3.10 calls out to install new gaskets, o-rings, bushings, pins, keys, studs, bolts, nuts and parts listed in

5.3.2 - 5.3.7, hosever no parts are listed in paragraph 5. Is material required for renewal based on condition found report in paragrapn

3.7.5.1?

GOVERNMENT RESPONSE: No, a full overhaul is required. The required report in 3.7.5.1 is used for OQE of the inspection and overhaul.

CONTRACTOR QUESTION 31: Paragraph 3.12 states to accomplish 009-

107 for cleaning and flushing of all new disturbed hydraulic piping. Is the intent of this paragraph to perform a HOT OIL FLUSH and submitting a PCP and would it also include hoses removed and hard blanked?

GOVERNMENT RESPONSE: Yes, a PCP is required per SI 107 para 3.4, hoses must be reistalled prior to accomplising 009-107.

CONTRACTOR QUESTION 28: Paragraph 3.7 states to accomplish full teardown, inspection/ (OVERHAUL) using 2.2 through 2.9. Is overhaul based on the inspection report required paragraph 3.7.5.1 i.e additional repairs and material?

GOVERNMENT RESPONSE: No, a full overhaul is required. The required report in 3.7.5.1 is used for OQE of the inspection and overhaul.