ITEM NO: 997-11-001
TITLE: Drydocking and Undocking; accomplish
PARA. NO: 3.2, 3.2.1, 3.2.2
PAGE NO: 1 of 6, 2 of 6
ITEM NO: 111-80-001
TITLE: Training Operations Center and
Berthing Installation, Boat Alt 226NS/3C;
accomplish
PARA. NO: 2.2 -2.4
PAGE NO: 1
ITEM NO:
TITLE:
PARA. NO:
PAGE NO:
ITEM NO:
TITLE:
PARA. NO:
PAGE NO:
ITEM NO: 110-21-001, others
TITLE: ABS Surveyor
PARA. NO: 3.1
PAGE NO: 1 of 2
ITEM NO: Solicitation
TITLE:
PARA. NO:
PAGE NO:
CONTRACTOR QUESTION 5:
Please clarify the language in para 3.1 of work item 110-21-001 and others work items in regards to the ABS surveyor for T&Is. Will the contractor be responsible for providing the ABS surveyor or will they be provided by the
Government?
GOVERNMENT RESPONSE: The ABS surveyor will be provided by the Government.
CONTRACTOR QUESTION 1: Paragraph 3.2 of Item 997-11-001 requires contractor to provide a sound dock, dockmaster, qualified personnel, and equipment certified in accordance with 2.2…which is MIL-
STD-1625. Sections HQ C-2-0021 on page 19 of 97, and HQ C-2-0022 on page 20 of 97 of the solicitation also require the use of drydocks and drydock facilities certified in accordance with MIL-STD-1625. However, paragraphs 3.2.1 and 3.2.2 allude to using an independent third party certification for the drydock and dockmaster. Is an independent third party drydock certification and contractor certified dockmaster acceptable in lieu of certification to MIL-STD-1625 for this contract? If MIL-STD-1625 certification is not waived for this contract, the government could be severely limiting the competition for this contract to as few as one contractor. Please waive the requirement for certification to MIL-STD-1625 and allow independent third party certification.
GOVERNMENT RESPONSE: The Government's response is forthcoming.
CONTRACTOR QUESTION 2: References for paragraphs 2.2-2.4 are missing from the package.
GOVERNMENT RESPONSE: The references have been added via the
AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
GOVERNMENT RESPONSE: Navy took vessel in 2016. The USNS
NARRAGANSETT has been active.
CONTRACTOR QUESTION 3: I see the Narraganett was contracted to
DonJon Marine for a time, when did the Navy take the vessel back over and has it been active?
CONTRACTOR POC:
REQUEST FOR SPECIFICATION CLARIFICATION
Attachment J-5
CONTRACTOR PHONE:
**Newly answered questions are indicated by a BOLD
Government Response.**
DATE OF REQUEST: SOLICITATION NO: N50054-17-R-0003
TITLE: USNS NARRAGANSETT (T-AFT-167) Docking Phased Maintenance Availability (DPMA) MARMC POC: Desireé Logan
CONTRACTOR: MARMC PHONE: 757-400-0329
CONTRACTOR QUESTION 4: Considering that the current bid date is
May 02, 2017 and as of this date we have not yet received all of the references, and along with the complexity of the bid, which will require a number of specialty subcontractors, and extensive material research, please extend the bid opening date to May 16, 2017. This should give all contractors the opportunity to prepare proposals that are most advantageous to the government
GOVERNMENT RESPONSE: The proposal due date has been amended via Amendment 0001.
GOVERNMENT RESPONSE: NoCONTRACTOR QUESTION 6:
Will Q.E.D. Systems be involved as the third party planner on this solicitation as they are on other MARMC solicitations?
ITEM NO: 426-80-001
TITLE: Speed Log Replacement
PARA. NO: 2
PAGE NO: 1 of 3
ITEM NO: 441-80-001
TITLE: SEATEL ANTENNA RELOCATE
PARA. NO: 2
PAGE NO: 1 OF 1
ITEM NO: 562-11-001
TITLE: RUDDER, STEERING GEAR AND
SKEG
PARA. NO: 3.2
PAGE NO: 2 OF 6
ITEM NO: 575-11-001
TITLE: STERN ROLLER FOUNDATION
PARA. NO: 2
PAGE NO: 1 of 2
ITEM NO: 672-00-100
TITLE: CONVERT LINE LOAD LOCKER
PARA. NO: 2
PAGE NO: 1of 2
ITEM NO: 593-11-001
TITLE: Collecting, Holding and Transfer
(CHT) Piping, tank, level sensors and lift stations; repair and replace
PARA. NO: 3.11 & 3.12
PAGE NO: 3 of 4
ITEM NO: 123-11-002
TITLE: Ballast Tank Inspection, repair, preserve; accomplish
PARA. NO: 2.4
PAGE NO: 1 of 5
ITEM NO: Multiple
TITLE:
PARA. NO:
PAGE NO:
ITEM NO: 111-80-001
TITLE: Training Operations Center and
Berthing Installation, Boat Alt 226NS/3C
PARA. NO: 2.0
PAGE NO: 1 of 2
ITEM NO: 672-00-001
TITLE: Convert Line Load Lockers to Storage
Spaces BOAT ALT 226NS/8C
PARA. NO: 2.2
PAGE NO: 1 of 2
ITEM NO: 245-11-001
TITLE: Propeller, repair
CONTRACTOR QUESTION 16: The work item references drawing
5111286, Line Locker Conversion to Storerooms which was not provided on either CD of references. Please provide the referenced drawing.
GOVERNMENT RESPONSE: Reference has been added via the
AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé
Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 17: The drawings indicate that the vessel is equipped with controllable pitch propeller system manufactured by
Propulsion Systems Inc. The work item is written as if the vessel is equipped with fixed propellers and intregral hubs, as inspection of bluing for propeller bore contact fit, and the installation of the propeller nut and keeper is included in the work item. The work item does not completely correspond to the equipment installed onboard the vessel. Paragraph 3.12 directs the contractor to remove the equipment listed in 1.3. Paragraph 1.3 lists (1) Port and (1) Starboard Propeller, not propeller assembly. Is it the governments intention for the contractor to remove the (4) propeller blades and hub for each propeller assembly from the vessel?
GOVERNMENT RESPONSE: Work Item upated via ERRATA.
To receive the ERRATA, please send an email request to Morgan
Myrick, Contracting Officer, and Desireé Logan, Contract
Specialist at MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 14:
Will the ABS be provided by the Government or to be provided by the
Contractor?
GOVERNMENT RESPONSE: Answered in question 5
CONTRACTOR QUESTION 15: The work item references the following drawings that were not provided on each of the reference Cds received.
5111375 Partial Foc'sle Deck and Details Removal; 5111376 Berth, Training Operation Center, T-SCIF Scantlings and Details; 5111382
Training operations Center and T-SCIF False Floors Installation. Please provide the referenced drawings.
GOVERNMENT RESPONSE: Reference has been added via the
AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé
Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
GOVERNMENT RESPONSE: Paragraphs 3.11 and 3.12 were updated via an ERRATA. To receive the ERRATA, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract
Specialist at MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 13:
Item 123-11-002 is for Ballast Tank inspection and repairs; however, drawing 633-30698 Rev A, Hull Zinc Installation is for the hull. The
Contractor requests drawing be provide for Ballast Tank Zincs.
GOVERNMENT RESPONSE: To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé
Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 12:
Paragraph 3.11 tasks the removal and installation of the equipment listed in
1.3.7, and paragraph 3.12 requires the installation and connection of new level sensors listed in 1.3.7. However, the only location listed under paragraph 1.3 is 1.3.1, which lists the entire CHT System. Similarly, paragraph 3.2 directs the installation and testing of new material listed in
1.3 and there isn't any material listed under 1.3. Please clarify.
CONTRACTOR QUESTION 11: PLEASE PROVIDE MISSING
REFERENCE 2.2
GOVERNMENT RESPONSE: Reference has been added via the
AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 7: The following references are missing from the package - 2.3-2.5 and 2.8. Please provide.
GOVERNMENT RESPONSE: References have been added via the
AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 10: PLEASE PROVIDE MISSING
REFERENCE 2.3
CONTRACTOR QUESTION 8: PLEASE PROVIDE MISSING
REFERENCE 2.3
GOVERNMENT RESPONSE: Reference has been added via the
AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
GOVERNMENT RESPONSE: Ayers Marine ElectronicsCONTRACTOR QUESTION 9: PLEASE PROVIDE SOURCE FOR
AUTHORIZED TECHNICAL REPRESENTIVE
GOVERNMENT RESPONSE: Reference have been added via the
AMRDEC website. To receive the references, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
PARA. NO: 1.3, 3.2, 3.12 thru 3.12.4
PAGE NO: 1 of 7, 3 of 6
ITEM NO: 245-11-001
TITLE: Propeller, repair
PARA. NO: 1.3, 3.2, 3.12 thru 3.12.4
PAGE NO: 1 of 7, 3 of 6
ITEM NO: 123-11-001
TITLE: Tank Inspection and Repair, accomplish
PARA. NO: 3.2 and 3.4
PAGE NO: 3 of 4
ITEM NO: 633-21-001
TITLE: Impressed Current Cathodic Protection
(ICCP) System; inspect and repair
PARA. NO: 3.2.1
PAGE NO: 2 of 6
ITEM NO: 321-80-001
TITLE: Shore Power System Receptacle
Replace and Relocate, BOATALT 226NS/4C
PARA. NO: 1.3.2; 3.3
PAGE NO: 1 of 2
CONTRACTOR QUESTION 17: The drawings indicate that the vessel is equipped with controllable pitch propeller system manufactured by
Propulsion Systems Inc. The work item is written as if the vessel is equipped with fixed propellers and intregral hubs, as inspection of bluing for propeller bore contact fit, and the installation of the propeller nut and keeper is included in the work item. The work item does not completely correspond to the equipment installed onboard the vessel. Paragraph 3.12 directs the contractor to remove the equipment listed in 1.3. Paragraph 1.3 lists (1) Port and (1) Starboard Propeller, not propeller assembly. Is it the governments intention for the contractor to remove the (4) propeller blades and hub for each propeller assembly from the vessel?
GOVERNMENT RESPONSE: Work Item upated via ERRATA.
To receive the ERRATA, please send an email request to Morgan
Myrick, Contracting Officer, and Desireé Logan, Contract
Specialist at MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 18: Paragraph 3.2 requires the contractor to provide the services of an authorized technical representative to provide on-site technical support for inspection, special tools, reports and adjustment of the equipment. The work item does not direct the contractor to disassemble the propeller hub, which normally requires an autrhorized technical representative. If the contractor is not completing a hub overhaul, is the technical representative required?
GOVERNMENT RESPONSE: Errata created to include overhaul of the Hub. To receive the ERRATA, please send an email request to Morgan Myrick, Contracting Officer, and Desireé Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 19: Paragraph 3.4 of the work it em directs the contractor to replace shell/hull plate and associated support structure that has detiorated 20% loss or more and interior bulkhead and support structure deteriorated 22% or more referenced from the tank inspection complete in paragraph 3.2. Paragraph 3.2 calls for a visual inspection of each tank listed in paragraph 1.2. Determination of palting deterioration should be measured using an NDE method such as Ultrasonic Testing. Will the government change paragraph 3.2 to include Ultrasonic testing requirements for the tank plating?
GOVERNMENT RESPONSE: UT's are in WI 110-21-001 interior
Gauging.
CONTRACTOR QUESTION 20: Please provide contact information for the authorized and qualified technical representative for this item.
GOVERNMENT RESPONSE: Contact information was included via an ERRATA in paragraph 4.4. To receive the ERRATA, please send an email request to Morgan Myrick, Contracting Officer, and
Desireé Logan, Contract Specialist at
MARMC_NRFK_411_PROCUREMENT@navy.mil.
CONTRACTOR QUESTION 21: Please provide nameplate data for HPU listed in 1.3.2 for accomplishment of 009-17 as required in para 3.3.
GOVERNMENT RESPONSE: The Government's response is forthcoming.