About this file
This Performance Work Statement (PWS) details Nationally Recognized Testing Laboratory (NRTL) field evaluation services for the Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF) in Bremerton, Washington. The primary objective is to provide third-party evaluation of government-owned Industrial Plant Equipment (IPE) and portable tools to verify compliance with Occupational Safety and Health Administration (OSHA) regulations, National Electrical Code (NEC), and National Fire Protection Association (NFPA) requirements.
The contract has a 5-year ordering period and requires the contractor to inspect and certify equipment, provide NRTL registered certification marks, and submit detailed field evaluation reports. Performance locations include PSNS & IMF sites in Bremerton and Everett, Washington, and the Trident Refit Facility in Bangor. The contractor must furnish personnel, equipment, and transportation, and perform comprehensive safety inspections using qualified NRTL employees. The service will ensure that government-owned equipment meets safety standards and is properly labeled, with a focus on machine guarding and electrical safety compliance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C2 25Q5801 Combined Synopsis Solicitation_FINAL_REV 1.pdf | ||
| C3 25Q5801 RFQ QA Attachment_22D5703 Simplified History.xlsx | XLSX spreadsheet | |
| C3 25Q5801 RFQ Questions and Answers.pdf | ||
| Attachment C_25Q5801 CDRL PSNS CERT A002.pdf | ||
| C2 25Q5801 Combined Synopsis Solicitation.pdf | ||
| Attachment A_25Q5801 Performance Work Statement.pdf | ||
| Attachment F_25Q5801 Contractor Badging and Access Requirements.pdf | ||
| Attachment B_25Q5801 Exhibit Line Item ELIN Table.xlsx | XLSX spreadsheet | |
| Attachment D_25Q5801 CDRL PSNS MARK A001.pdf | ||
| Attachment E_25Q5801 DI-MISC-82386 CERTIFICATION DATA REPORT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Nationally Recognized Testing Laboratory Field Evaluation Services, PSNS & IMF
Puget Sound Naval Shipyard & Intermediate Maintenance Facility Bremerton, WA 98314
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to provide Nationally Recognized Testing Laboratory (NRTL) field evaluation services. The Government shall not exercise direct supervision or control over any contractor employees. Notwithstanding, the contractor shall ensure employees comply with all requirements of this Performance Work Statement (PWS) and contract.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform NRTL field evaluation services as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF) and Trident Refit Facility Bangor (TRFB) each procure Industrial Plant Equipment (IPE). For nearly all IPE assets and portable tools, the PSNS & IMF Environmental, Safety, and Health Office, Code 106, requires the owning organization to obtain NRTL field evaluation services to verify that equipment and their component parts are in compliance with Occupational Safety and Health Administration (OSHA) standards. While many assets are factory-certified, not every procured asset is. This effort will provide a means to obtain NRTL field evaluation services for IPE or portable tool procurements where NRTL field evaluation services are not a requirement of the equipment procurement contract.
1.3 Objectives: The objective of this service contract is to obtain NRTL field evaluation services for the purpose of verifying that installed IPE and its component parts are in compliance with OSHA regulations concerning machine guarding and electrical safety
1.4 Scope: The contractor shall provide third party evaluation of Government owned IPE to certify compliance with the applicable OSHA regulations in accordance with Code of Federal Regulations (CFR) Title 29, Chapter XVII, Part 1910, and to ensure the Government owned IPE has been installed in accordance with National Electrical Code (NEC) and/or National Fire Protection Association (NFPA) requirements. The Government owned equipment that satisfies the applicable OSHA, NEC, NFPA, and/or PSNS&IMF OSH requirements shall be labeled with a NRTL registered certification mark or labeling that identifies that the Government owned equipment is in conformance with the applicable safety and technical standards. A NRTL field evaluation report shall be provided to the Government indicating all deficiencies and implemented or required resolution(s). The NRTL field evaluation report shall indicate whether the Government owned equipment has been labeled or not labeled during the inspection service visit, and if it has been labeled, the field evaluation report shall indicate that the Government owned equipment is in conformance with the applicable safety and technical standards.
1.5 Period of Performance: The ordering period for this contract shall be 5 years from date of contract award.
1.6.1 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.7 Location:
1.7.1 Place of Performance: The work to be performed under this contract will be performed at various production facilities at the following sites:
Bremerton site
1400 Farragut Avenue Bremerton, WA 98314
Naval Station Everett 2000 West Marine View Drive
Everett, WA 98201
Trident Refit Facility Bangor 7000 Finback Circle
Silverdale, WA 98315
1.7.2 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:20a.m. and 4:02p.m. Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.7.3 Recognized Holidays: Contractor is not required to perform services on federal holidays. The list of current federal holidays can be found here: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
In addition to the above listed holidays, Puget Sound Naval Shipyard is normally closed for all except necessary services during the week between Christmas Day and New Year's Day (curtailment). Necessary services/ frequencies for various facilities are noted on the detail sheets and work contracted for shall be performed during this period unless otherwise directed by the Contracting Officer. Exact number of closure days may vary from year to year. Actual requirements will be determined in advance of the closure. On site work performed by the Contractor for the Contractor's convenience during this time must also be specifically requested by the Contractor in writing and approved by the Contracting Officer in advance.
1.8 Security Requirements: Contractor Employees, in order to gain access to the government facilities identified in paragraph 1.7.1 to perform work under this contract, shall comply with the Badging and Access Requirements Attachment to the solicitation/contract.
1.8.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.9 Special Qualifications: The contract personnel performing third party evaluation of Government owned IPE to certify compliance with the applicable Occupational Safety and Health Administration (OSHA) regulations in accordance with CFR Title 29, Chapter XVII, Part 1910 and ensuring the Government owned IPE has been installed in accordance with NEC/NFPA/PSNS&IMF Occupational Safety and Health (OSH) requirements shall be a trained and qualified employee of an OSHA recognized Nationally Recognized
Testing Laboratory who is authorized to certify and label the Government owned equipment with a registered certification mark or label to designate that the equipment is in conformance with the applicable safety and technical standards. The contractor will be required to conform to all Federal NRTL requirements such as, but not limited to, OSHA, NFPA, and Federal Communications Commission (FCC).
1.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.11 Contracting Officer Representative (COR): The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel.
The COR is NOT authorized to change any of the terms and conditions of this contract. Only the warranted Contracting Officer is authorized to make modifications/changes to the terms and conditions of this contract. If the Contractor believes any Government personnel has effectively issued a change resulting in a change in effort and price/cost of the contract, the Contractor shall immediately notify the Contracting Officer in writing.
CORS:
1.12 Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to execution of this contract.
1.12.1 Identification of Contractor Employees: All contractor personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government officials. All contractor personnel on a government installation will be required to obtain and wear badges in the performance of this contract.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1 Common Definitions: Per FAR 52.212-4(e), FAR 52.202-1 is incorporated by reference to this contract.
2.2 Special Definitions:
2.2.1 Industrial Plant Equipment (IPE): Plant equipment used for positioning, cutting, abrading, grinding, shaping, forming, joining, testing, measuring, heating, treating, or otherwise altering the physical, electrical, or chemical properties of materials, components, or end use items. IPE, in some cases may also include ventilation systems that are used in support of the operation of IPE.
2.2.2 Nationally Recognized Testing Laboratory (NRTL): Recognizes private sector organizations to perform certification for certain products to ensure that they meet the requirements of both the construction and general industry OSHA electrical standards. Each NRTL has a scope of test standards that they are recognized for, and each NRTL uses its own unique registered certification mark(s) to designate product conformance to the applicable product safety test standards. After certifying a product, the NRTL authorizes the manufacturer to apply a registered certification mark to the product. If the certification is done under the NRTL program, this mark signifies that the NRTL tested and certified the product, and that the product complies with the requirements of one or more appropriate product safety test standards. An organization must have the necessary capability both as a product safety testing laboratory and as a product certification body to receive OSHA recognition as an NRTL.
2.2.3 Registered Certification Mark: A mark, label, or sticker signifying that the NRTL tested and certified the product under the NRTL program, and that the product complies with the requirements of one or more appropriate product safety test standards. Users of the product can generally rely on the mark as evidence that the product complies with applicable OSHA approval requirement(s) and is safe for use in the workplace. After certifying a product under the NRTL program, the NRTL authorizes the manufacturer to apply a registered certification mark to the product.
2.3 Acronyms:
COR Contracting Officer’s Representative CFR Code of Federal Regulations FAR Federal Acquisition Regulation IAW In Accordance With IEC International Electrotechnical Commission IPE Industrial Plant Equipment ISO International Organization for Standardization KO Contracting Officer NAVSEA Naval Sea Systems Command NEC National Electric Code NFPA National Fire Protection Association
NIST National Institute of Standards and Technology NRTL Nationally Recognized Testing Laboratory NSE Naval Station Everett OSH Occupational Safety and Health (manual) OSHA Occupational Safety and Health Administration PSNS&IMF Puget Sound Naval Shipyard & Intermediate Maintenance Facility PWS Performance Work Statement QASP Quality Assurance Surveillance Plan REF Reference TRFB Trident Refit Facility Bangor
PART 3
SPECIFIC TASKS
3. SPECIFIC TASKS:
3.1 NRTL Field Evaluation Services: The contractor shall provide onsite Occupational Safety and Health Administration (OSHA) recognized NRTL field evaluation services to verify that Government owned IPE or portable tool, its installation if applicable, and component parts is in compliance with the requirements of 29 CFR 1910, NFPA 70, NFPA 79, and PSNS&IMF OSH Vol I Chapter 9. Compliance and/or approval shall be specified under the “Approval” and “Acceptance” criteria in the OSHA regulations Subpart “O”, Machinery and Machine Guarding paragraph 1910.212, and Subpart “S”, Electrical paragraph 1910.303 and paragraph 1910.399.
3.2 OSHA Approved Certification: The Government owned IPE or portable tool, and its installation if applicable, shall be inspected, approved as defined in 29 CFR 1910.399, and labeled with a Registered Certification Mark (ref. CDRL A001) by a Nationally Recognized Testing Laboratory as defined in 29 CFR 1910.7. An NRTL Field Evaluation Report shall be provided to the Government for each IPE or portable tool evaluated (ref. CDRL A002). A single report compiled of all IPE and portable tools evaluated in a service visit is also acceptable in lieu of a report for each IPE or portable tool. The report shall identify at a minimum issue/certification date, IPE and portable tools evaluated, all deficiencies or lack thereof, and methods of resolution for those deficiencies.
PART 4
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
4. GOVERNMENT FURNISHED ITEMS AND SERVICES:
4.1 Services: The Government will provide personnel from each IPE or portable tool owning organization to assist (e.g. equipment access, demonstration or operation of the equipment being inspected) before and during each field evaluation service.
4.2 Materials: The Government will furnish Operations and Maintenance manuals, IPE assembly drawings, electrical schematics/diagrams, and/or electronics schematics/diagrams that are provided by the Original Equipment Manufacturer at the installation or field evaluation location for each IPE or portable tool undergoing service.
PART 5
CONTRACTOR FURNISHED ITEMS AND SERVICES
5. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
5.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 4 of this PWS.
5.2 Transportation: The Contractor shall furnish their own means of transportation to accomplish the onsite services outlined in this PWS. The Government shall not be required to provide transportation or escort for Contractor employees.
5.3 Materials: The Contractor shall furnish a NRTL registered certification mark for each IPE or portable tool determined to be in compliance with NRTL standards.
5.4 Equipment: The Contractor shall provide all electronics, diagnostic devices (e.g. voltage meters, multimeters), and small tools (e.g. screwdrivers, Allen wrenches) that are necessary to access IPE internals and perform all inspections and tests that are required to confirm that the inspected IPE satisfied NEC/NFPA machine guarding and electrical safety requirements.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS):
6.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
Code of Federal Regulations (CFR)
6.2 29 CFR 1910------------------------------------- Occupational Safety and Health Standards
National Fire Protection Association (NFPA)
6.3 NFPA 70 ----------------------------------------- National Electrical Code
6.4 NFPA 79 ----------------------------------------- Electrical Standard for Industrial Machinery
Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF), Occupational Safety and Health (OSH) Manual
6.5 OSH Volume I, Chapter 9 --------------------- Listing Requirements for Electrical Equipment
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. ATTACHMENT/TECHNICAL EXHIBIT LIST:
7.1 Technical Exhibit 1 – Performance Requirements Summary
7.2 Technical Exhibit 2 – Deliverables Schedule
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
File details come from the government source that posted it. Updated .