This document contains government responses to contractor questions regarding a solicitation for pierside modernization of an Army pier barge. The solicitation seeks a firm-fixed-price contract to accomplish maintenance, repair, and preservation work on a 360-foot steel crew living barge named APL-62. Work includes scullery upgrades, repairing various superstructure items, blasting and preserving the superstructure, blasting and installing exterior nonskid, and cleaning wastewater tanks. The availability period is from June 4, 2024 to December 20, 2024 at the contractor's Puget Sound, Washington area facility. The solicitation is set aside for HUBZone small businesses with 1,300 employees or fewer and is issued by the Department of the Navy Naval Supply Systems Command.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to RFCs 06-09 APL-62 Pierside Modernization
06) Question: SOW Work Item 3.5.1 “Life Line and Life Rail Repairs”
SOW States:
3.5.1 Straighten 40 lineal feet of damaged rails using the report of 3.5.4 for guidance.
3.5.4 3.5.4 Visual Inspection for Structural Defects: Visual Inspection Accomplish each mooring bitt, towing bitt, cleat, chock, padeye, handrail, deck socket, for structural damage and defects of the Main Deck and topside fittings after completion of blasting. (REQUIRED REPORT CDRL A033)
Question: Just confirming that the Government’s intent is for the contractor to bid 3.5.1 for inspection only – and that the work to be performed would be authorized by the Government dependent upon the findings of the visual inspection.
Response: Paragraph 3.5.4 will determine areas of the repairs for 40 linear feet of damaged rails per paragraph 3.5.1
Repairs shall be included on contractors estimate.
07) Question: SOW Work Item 3.6.1 “04 Level Life Line and Life Rail Install”
SOW States: Weld Install ABS Steel Lines and Rails on 100 percent of exterior perimeter including Awning, in accordance with drawing 804-5184155, match color and sheen to new preservation top coat of 3.6.9.
Upon review of drawing 804-5184155, it references an additional 10 drawings on Pg 1. Can the government provide the additional referenced drawings?
Response: Government is unable to supply additional drawings.
08) Question: SOW Work Item 3.6.8 “WI-3 Exterior Ladder Landing Platform”
SOW States: Accomplish the requirements of drawing 110-8573269 prior to the start of 3.6.9.
Upon review of drawing 110-8573269, it references an additional 5 drawings on Pg 1. Can the government provide the additional referenced drawings?
Response: The Government has supplied 5 additional drawings.
09) Question: SOW Work Item 3.6.1 “Life Line and Life Rail Style”
The SOW references Drawing 804-5184155, which has more than one style option as well as material options.
The one style that comes closest to the SOW description is sample K as listed above. However, this is not the style of hand rail on the Main Deck of level 03.
The style of hand rail on the Main Deck and level O3 is not listed as an option on drawing 804-5184155 and is a flat bar welded directly to the deck with Half Moon cut out for the horizontal rails to fit into.
1. Please verify the hand rail design that is wanted on the 04 deck and Awning.
Response: Paragraph 3.6.1 and sub-paragraphs specify the same requirements as drawing 804-5184155 Style K. “Weld Install ABS Steel Lines and Railes on 100 percent of exterior perimeter including Awning” Accomplish the requirements of the SOW.