This document contains government responses to requests for clarification on a solicitation for the pierside modernization of an Auxiliary Personnel Lighter (APL-62) crew living barge. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a firm-fixed-price contract to accomplish maintenance, repair, and preservation work on the 360-foot APL-62 at the contractor's facility located in the Puget Sound, Washington region. The solicitation is set aside for HUBZone small businesses under NAICS code 336611 with a size standard of 1,300 employees. Work on the APL-62 is scheduled to take place from June 4, 2024 to December 20, 2020 and will include scullery upgrades, repair of various superstructure items, blasting and preserving the superstructure, blasting and installing exterior nonskid, and cleaning of CHT tanks. The government responses did not provide drawings or dimensions requested in the clarification questions, advising offerors to refer to the ship check for clarity.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to RFCs 01-05 APL-62 Pierside Modernization
01) Question: SOW Work Item 3.6.2 “03 and 04 Level Deck Drain Maintenance”
Please provide a drawing to ID the deck couplings.
Response: No drawing available. The ship check is available to provide clarity.
02) Question: SOW Work Item 3.6.2 “03 and 04 Level Deck Drain Maintenance”
Are they inboard and behind bulkheads or outboard with no obstruction?
Response: No drawing available. The ship check is available to provide clarity.
03) Question: SOW Work Item 1.24 “Technical Representatives”
Does the government have a list of Manufacturers for the Tech Reps required by the SOW?
Response: Paragraph 1.24 states “Provide the services of a ‘qualified’ on site OEM Tech Rep…”
The Government does not establish that requirement, unless called out in the specific drawing for specific equipment. KTR is required to obtain a qualified Tech Rep that can conduct repairs IAW the SOW and drawing requirements, plus submit IAW CDRLs.
04) Question: SOW Work Item 3.6.1 “04 Level Life Line and Life Rail Install”
What is the Perimeter (Length and Width) of the Awning on the 04 level?
Response: No drawing/dimensions available for the awning; ship check is available to provide clarity.
05) Question: SOW Work Item 3.6.1 “04 Level Life Line and Life Rail Install”
Please provide a drawing to indicate the specs for the Awning.
Response: No drawing/dimensions available for the awning; ship check is available to provide clarity.