C04.0 N4523A24R1050 APL-62 Attachment J-2 Price Proposal Worksheet.xlsx

XLSX spreadsheet 85 KB Posted

Attached to
Pierside Modernization of APL-62
Solicitation number
N4523A24R1050
Issued by

About this file

This document contains a price proposal worksheet and instructions for contractors to use in preparing a proposal for the solicitation N4523A24R1050 for the pierside modernization of APL-62 being conducted by the Department of the Navy Naval Supply Systems Command. The price proposal worksheet includes templates for contractors to provide their labor rates and mix, price out over 50 separate work items and tasks involved in the modernization, and break out the total proposed price by direct labor costs, overhead, G&A, and profit. Contractors are instructed to fill out designated cells in the worksheet templates with their own rates and pricing details prior to submission in response to the solicitation.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Sheet

Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet

All yellow fields are to be filled out by the Contractor prior to submittal to The Government.
DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW.
Labor Mix & Rates Sheet
1Enter Company Name and Date
2Fill in each rate in its applicable yellow cell
3Fill in each labor category and ensure all yellow boxes are filled in
a.Example Labor Categories
Shipfitter
Sheetmetal
Welder/Burer
Electrician
Inside Machinist
Outside Machinist
Boilermaker
Pipefitter
Insulator/Lagger
Shipwright/Carpenter
EX/Ord
Painter/Blaster
Rigger/Laborer
QA/NDT
4Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours
5Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate.
Price Proposal Worksheet
1All company and contract information and rates will be autopopulated from previous sheet.
2Fill in each yellow cell with its applicable information
3Anything that is not in yellow is locked, these cells will auto-calculate.
4Before submitting, ensure there are no more bright yellow cells.
IF USING FCCOM
Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission.
Labor Hour Breakdown
1Enter each labor categoy will autofill from the "labor Mix & Rates" sheet
2Fill in each Regular and Overtime hour for each labor category and line item.

Labor Mix & Rates

Contractor/Company Name:
Project/Vessel Name:APL-62Date:

Base Rates: Regular Labor ERROR:#DIV/0! Fringe Overhead G&A Profit FCCOM

Labor Mix and Rates

Labor Category Regular Hours Overtime Hours Total Category Hours Total Regular $/hour Total Overtime $/hour Total Category Dollars

0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
Column Totals000$0.00$0.00$0.00

Direct Labor Rate Per Hour ERROR:#DIV/0!

Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT

APL-62 Price Proposal

Contractor/Company Name:0
Project/Vessel Name:APL-62Date:12/31/99

Base Rates: Labor ERROR:#DIV/0! Fringe 0.00% Overhead 0.00% G&A 0.00% Profit 0.00% FCCOM 0.00

Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival ConferenceArrival ConferenceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.5Required DocumentsRequired DocumentsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.6Progress MeetingsProgress MeetingsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.8Availability RequirementsAvailability RequirementsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.8.2Provide Vessel Electrical ServiceTransport VesselsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.8.3Provide Fire Protection EquipmentCare of VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.8.4Provide Office SpaceCFR ReportsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.9Care of VesselSafety RequirementsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.12Condition Found/Inspection Discrepency Report (CFR/IDR)Preservation OQEERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.14Safety RequirementsEnvironmental/Hazwaste ManagementERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.17Preservation RequirementsGas FreeERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.18Envrionmental & Hazwaste ManagementDevelop & Maintain Test PlanERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.20Weight ControlPersonnel & EquipmentERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.22Integrated Logistic SupportDocking ProceduresERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.23Gas FreeBlocking PlanERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.24Technical RepresentativesERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.25General Requirements for TestingSetting and Aligning BlocksERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.26Compartment Arrival / Closeout InspectionsDocking ConferenceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.1CHT Tank RepairsDocking the VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.2CHT Tank Cleaning PCPPost DockingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.3Tank/Void Visual InspectionERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.4Identify Color Schemes and MarkingsUndockingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.5Preliminary Air TestFinal Docking ReportERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.6Touch-Up PreservationIdentify Distinguishing Figures and MarkingsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.7Final Air TestRubber FendersERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.8Tank/Void Closeout InspectionZinc ReplacementERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.9CHT Tank No. One and No.2 Pipe Penetration RepairsHull Blasting and PreservationERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.1Life Line and Life Rail RepairsHull & FB Visual InspectionERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.2Chain and Turnbuckle Assembly RepairsHull & FB U/T InspectionERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.3Main Deck Nonskid RepairOpen, Pump, Clean, Vent, Gas Free, Close all tanksERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.4Visual Inspection for Structural DefectsTank/ Void Visual InspectionERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.5Ultrasonic Test (UT) InspectionIdentify Color Schemes and MarkingsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.104 Level Life Line and Life Rail InstallTank/Void Blast & PreservationERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.203 and 04 Level Deck Drain MaintenanceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.3Commander United States Pacific Fleet Emblem/Panel RepairsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.403 Level Generator Room Sealant RepairsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.504 Level Exterior Vent Plenum to Deck Sealant RepairsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.604 Level 4 Inch Gooseneck Vent MaintenanceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.8WI-3 Exterior Ladder Landing Platform ModificationsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.9Superstructure PreservationERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.10Visual Inspection for Structural Defects (Exterior Superstructure Surfaces)ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.1101, 02, 03 & 04 Level Nonskid RepairERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.12Visual Inspection for Structural Defects - DeckERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.13Ultrasonic Test (UT) InspectionERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.9.1WI-2 Scullery UpgradeERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.1Operational ResponsibilityERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.2Dock Trial Baseline TestingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.3Final Dock TrialERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.4Post Dock TrialERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00
Column Totals0ERROR:#DIV/0!$0.00ERROR:#DIV/0!$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

Base Work Package for CLIN 0001 (APL-62) ERROR:#DIV/0!

OPTION YEAR TABLE IF NEEDED:

Option Item Proposal Package
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Column Totals0ERROR:#DIV/0!$0.00ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!$0.00$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

Total Option Items (O): ERROR:#DIV/0!

TOTAL PROPOSED PRICE: ERROR:#DIV/0!

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

Labor Hour Breakdown

Contractor/Company Name:0
Project/Vessel Name:APL-62Date:12/31/99
Base Rates:Regular Labor RateERROR:#DIV/0!
NameRateTotal CostNameRateTotal Cost
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Regular HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
1.4Arrival Conference00ERROR:#DIV/0!
1.5Required Documents00ERROR:#DIV/0!
1.6Progress Meetings00ERROR:#DIV/0!
1.8Availability Requirements00ERROR:#DIV/0!
1.8.2Provide Vessel Electrical Service00ERROR:#DIV/0!
1.8.3Provide Fire Protection Equipment00ERROR:#DIV/0!
1.8.4Provide Office Space00ERROR:#DIV/0!
1.9Care of Vessel00ERROR:#DIV/0!
1.12Condition Found/Inspection Discrepency Report (CFR/IDR)00ERROR:#DIV/0!
1.14Safety Requirements00ERROR:#DIV/0!
1.17Preservation Requirements00ERROR:#DIV/0!
1.18Envrionmental & Hazwaste Management00ERROR:#DIV/0!
1.20Weight Control00ERROR:#DIV/0!
1.22Integrated Logistic Support00ERROR:#DIV/0!
1.23Gas Free00ERROR:#DIV/0!
1.25General Requirements for Testing00ERROR:#DIV/0!
1.26Compartment Arrival / Closeout Inspections00ERROR:#DIV/0!
3.4.1CHT Tank Repairs00ERROR:#DIV/0!
3.4.2CHT Tank Cleaning PCP00ERROR:#DIV/0!
3.4.4Identify Color Schemes and Markings00ERROR:#DIV/0!
3.4.5Preliminary Air Test00ERROR:#DIV/0!
3.4.6Touch-Up Preservation00ERROR:#DIV/0!
3.4.7Final Air Test00ERROR:#DIV/0!
3.4.8Tank/Void Closeout Inspection00ERROR:#DIV/0!
3.4.9CHT Tank No. One and No.2 Pipe Penetration Repairs00ERROR:#DIV/0!
3.5.1Life Line and Life Rail Repairs00ERROR:#DIV/0!
3.5.2Chain and Turnbuckle Assembly Repairs00ERROR:#DIV/0!
3.5.3Main Deck Nonskid Repair00ERROR:#DIV/0!
3.5.4Visual Inspection for Structural Defects00ERROR:#DIV/0!
3.5.5Ultrasonic Test (UT) Inspection00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.6.104 Level Life Line and Life Rail Install00ERROR:#DIV/0!
3.6.203 and 04 Level Deck Drain Maintenance00ERROR:#DIV/0!
3.6.3Commander United States Pacific Fleet Emblem/Panel Repairs00ERROR:#DIV/0!
3.6.403 Level Generator Room Sealant Repairs00ERROR:#DIV/0!
3.6.504 Level Exterior Vent Plenum to Deck Sealant Repairs00ERROR:#DIV/0!
3.6.604 Level 4 Inch Gooseneck Vent Maintenance00ERROR:#DIV/0!
3.6.8WI-3 Exterior Ladder Landing Platform Modifications00ERROR:#DIV/0!
3.6.9Superstructure Preservation00ERROR:#DIV/0!
3.6.10Visual Inspection for Structural Defects (Exterior Superstructure Surfaces)00ERROR:#DIV/0!
3.6.1101, 02, 03 & 04 Level Nonskid Repair00ERROR:#DIV/0!
3.6.12Visual Inspection for Structural Defects - Deck00ERROR:#DIV/0!
3.6.13Ultrasonic Test (UT) Inspection00ERROR:#DIV/0!
3.9.1WI-2 Scullery Upgrade00ERROR:#DIV/0!
3.13.1Operational Responsibility00ERROR:#DIV/0!
3.13.2Dock Trial Baseline Testing00ERROR:#DIV/0!
3.13.3Final Dock Trial00ERROR:#DIV/0!
3.13.4Post Dock Trial00ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
Column Totals00000000000000000000000000000000000000ERROR:#DIV/0!

Base Work Package ERROR:#DIV/0!

OPTION YEAR TABLE IF NEEDED:

Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Direct HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
Column Totals00000000000000000000000000000000000000ERROR:#DIV/0!

Total Option Items (O): ERROR:#DIV/0!

TOTAL DIRECT LABOR COSTS BY WORK ITEM ERROR:#DIV/0!

File details come from the government source that posted it. Updated .