A17.7_90258634-02687-9025-8634_DD1423-2_ENGINEERING_DRAWINGS_DI-SESS-81000E_10-18-2018.pdf

PDF 43 KB Posted

Attached to
Printed Circuit Boards (PCB) Design
Solicitation number
N4523A19R1312
Issued by

About this file

DI-SESS-81000E

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

Form Approved OMB No. 0704-0188

The public reporting burden for this collect ion of information is est imated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any o ther aspect o f th i s co l lec t ion o f in format ion , in c lud ing suggest ions f o r red ucing the burden, to the Department o f Defense, Execut ive Se rv ices Di rec tora te (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collect ion of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM _______ OTHER SESS/MISC________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

3. SUBTITLE

ENGINEERING DRAWINGS

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000E

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16* 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A*

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A Draft

Final

Reg Repro

16. REMARKS

N4523A 0 1 0

15. TOTAL 0 1 0

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

ENGINEERING DRAWINGS

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16 14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS

Block 9 - Distribution Statement D. Distribution authorized to DoD and DoD contractors only.

Administration and operations only, effective 3/26/2019. Other U.S. requests shall be referred to COMNAVSEASYSCOM.

Block 4 - Tailored to allow vendor to provide only 10.2.4.

Block 10 - Proof of prior acceptance by a NAVSEA Activity shall be submitted in lieu of Personnel Qualifications Report prior to performance of any test.

Block 12 - Allow 45 Days from date of entry in WAWF for certification acceptance prior to material shipment.

Block 14 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.

Document no.: 90258634

N4523A 0 1 0

15. TOTAL

0 1 0

G. PREPARED BY

/S/ C. Shoemaker C/127.2

H. DATE

3/26/2019

I. APPROVED BY

/S/ J. Jordan C/127.2

J. DATE

3/26/2019

17. PRICE GROUP

19. ESTIMATED

TOTAL PRICE

17. PRICE GROUP

19. ESTIMATED

TOTAL PRICE

Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 3/26/2019. Other U.S. requests shall be referred to COMNAVSEASYSCOM.

Block 10 - Submit Engineering Drawings unless proof of prior acceptance by NAVSEA Activity.

Block 12 - Allow 45 Days from date of entry in WAWF for certification acceptance prior to material shipment

Block 14 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.

File details come from the government source that posted it.