Waterjet Waste Removal Question and Answer
Question 1: What is the length of hose required to pump each machine?
Answer 1: Shop 11A will require a 50-foot line, Shop 31A will require 160-foot line, and Shop 51R will require a 50-foot line.
Question 2: Will water be provided on-site?
Answer 2: Yes, the Government will provide on-site water.
Question 3: Will site preparations be completed prior to arrival.
Answer 3: All site preparations will be completed before arrival.