RFC6_Response.doc

DOC document 34 KB Posted

Attached to
Maintenance, Repair and Preservation of Edgecumbe Barge
Solicitation number
N4523A18R1065
Issued by

About this file

Request for Clarification #6 Response

View the file

Other files

File Type Posted
RFC4_Response.doc DOC document
RFC5_Response.doc DOC document
RFC1_Pictures.zipx ZIPX file
RFC3_Response.doc DOC document
RFC1_Response.doc DOC document
RFC2_Pictures.zipx ZIPX file
RFC2_Response.doc DOC document
RFC3_Picture.zipx ZIPX file
Exhibit_A_-_CDRLs_and_DIDs_Combined_Edgecumbe_Barge.pdf PDF
Attachment_J-1_Statement_of_Work_Edgecumbe_Barge_dated_1MAY2018.docx DOCX document
N4523A18R1065_SolicitationDrawings.zip ZIP file
Attachment_J-3_Request_for_Clarification_Form_Edgecumbe_Barge.doc DOC document
Attachment_J-4_Contract_Performance_Data_Sheet_Edgecumbe_Barge.docx DOCX document
Attachment_J-5_Corporate_Experience_Data_Sheet_Edgecumbe_Barge.docx DOCX document
N4523A18R1065_Edgecumbe_Barge.pdf PDF
Edgecumbe_Barge_Draft_SOW.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR CLARIFICATION

N4523A18R1065 Attachment J-3

DATE OF REQUEST: 7-18-18
QUESTION NO: 006

REQUIREMENT: Edgecumbe Barge

REQUISITION NO.: N4523A18R1065

ITEM NO: 3.2.4 (3.2.4.1.1)

TITLE: Hull Blasting and Preservation

PSNS&IMF CONTRACTS POC & PHONE:

See POCs listed on RFP.

PARA. NO: 3.2.4.1
PAGE NO: ___28___
CONTRACTOR:
PLANNER’S NAME:
ATTACH. NO:
CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)

Will the Government alternately accept the Surface Preparation Specification SSPC-TR-2/NACE 6G198 and Visual Standards SSPC VIS 5/ NACE VIS 9, C-WAB-10M or D-WAB-10M as acceptable, with a surface profile of 2-4 Mils, with no single reading less than One Mil or greater than 5 Mils?

DO NOT WRITE BELOW THIS LINE

SPEC CHG: N
DWG/REF CHG. N
RQMTS CHG: N
MAT'L CHG: N
TECHNICAL REVIEW: Langham
SERIAL NO: 006

Proceed in accordance with the Statement of Work.

ALL RFCs MUST BE RECEIVED NO LATER THAN 2:00 P.M. (PST), 25 July 2018.