RFC1_Response.doc
DOC document 35 KB Posted
- Solicitation number
- N4523A18R1065
About this file
Request for Clarification #1 Response
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFC6_Response.doc | DOC document | |
| RFC4_Response.doc | DOC document | |
| RFC5_Response.doc | DOC document | |
| RFC1_Pictures.zipx | ZIPX file | |
| RFC3_Response.doc | DOC document | |
| RFC2_Pictures.zipx | ZIPX file | |
| RFC2_Response.doc | DOC document | |
| RFC3_Picture.zipx | ZIPX file | |
| Exhibit_A_-_CDRLs_and_DIDs_Combined_Edgecumbe_Barge.pdf | ||
| Attachment_J-1_Statement_of_Work_Edgecumbe_Barge_dated_1MAY2018.docx | DOCX document | |
| N4523A18R1065_SolicitationDrawings.zip | ZIP file | |
| Attachment_J-3_Request_for_Clarification_Form_Edgecumbe_Barge.doc | DOC document | |
| Attachment_J-4_Contract_Performance_Data_Sheet_Edgecumbe_Barge.docx | DOCX document | |
| Attachment_J-5_Corporate_Experience_Data_Sheet_Edgecumbe_Barge.docx | DOCX document | |
| N4523A18R1065_Edgecumbe_Barge.pdf | ||
| Edgecumbe_Barge_Draft_SOW.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR CLARIFICATION
N4523A18R1065 Attachment J-3
| DATE OF REQUEST: 7/11/18 |
| QUESTION NO: 001 |
REQUIREMENT: Edgecumbe Barge
REQUISITION NO.: N4523A18R1065
ITEM NO: 3.3.4
TITLE: Blast and Preserve (Tanks/Voids)
PSNS&IMF CONTRACTS POC & PHONE:
See POCs listed on RFP.
| PARA. NO: 3.3.4 |
| PAGE NO: 29 |
| CONTRACTOR: |
| PLANNER’S NAME: |
| ATTACH. NO: |
| CONTRACTOR POC & PHONE: |
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
Specification calls out for Contractor to remove existing and install new coating systems to the entire interior surfaces, including sounding tubes, tank vents, overflows, piping, structural members and access covers in accordance with drawing 100-7281566. Drawing 100-7281566 provides what coating systems are to be installed but does not provide Contractor with piping schematics (vents, overflows, sounding, or other) nor structural members (longitudinal, transverse, bulkhead, baffle, or other).
Contractor requests drawings to support tank and void preservation.
DO NOT WRITE BELOW THIS LINE
| SPEC CHG: N |
| DWG/REF CHG. N |
| RQMTS CHG: N |
| MAT'L CHG: N |
| TECHNICAL REVIEW: Baxter |
| SERIAL NO: 001 |
See the attached pictures for reference.
ALL RFCs MUST BE RECEIVED NO LATER THAN 2:00 P.M. (PST), 25 July 2018.