vessel name
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||
| Project = | YT-800 | DATE: = | |||
| PRIME | SUBCONTRACTOR | PRIME | |||
| Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A | PRIME |
Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | |
| Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price | Labor Cost | Material Cost | TOTAL |
Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F) Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.14 | Hot Work/ Welding | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Environmentals | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.19 | Weight Control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.21 | Integrated Logistics Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.22 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.23 | General Requirements for Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.24 | Compartment Arrival & Closeout | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.1 | Personnel & Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.4 | Crib & Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.5 | Setting & alignment of docking blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | Stability Calculations | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.7 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.10 | Shifting the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.11 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.13 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.1 | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.3 | Steel Half Pipe Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.4 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.5 | Hull Blasting & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.6 | Hull Structural opening Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.7 | Hull & Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.8 | Hull & Freeboard UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.1 | Engine Room Bilge Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.2 | Install Removable Ladder to ER Bilge | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.3 | Repair Ships Whistle | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.4 | Trim Freeing Ports | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.5 | Repair Bilge Pump Foundation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.6 | Install Life Raft Foundation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.1 | Marine Sanitation Device PCP | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.2 | Open,pump,clean, ventilate, and gas frees tanks/voids. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.3 | Tank/Void visual inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.4 | Tank/void preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.5 | Aft steering compartment preservation. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.6 | Preliminary air test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.7 | Tank/void cover exterior identification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.8 | Clean,flush. And disenfection of fresh water system. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.9 | Certification of fresh water piping and tank. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.10 | Start up procedure for MSD syatem | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.11 | Final air test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.12 | Tank/void closeout inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.13 | Tank/void manhole covers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.14 | On-load Fuel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.1 | Main deck non skid repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.2 | Visual inspection for structural defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.3 | Ultrasonic test (UT) inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1 | Boat deck and Pilot house Top non skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.2 | Visual inspection for structural defects. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.3 | Ultrasonic Test (UT) Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.4 | Pilot house window repairs. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.1 | Schottle Z-Drive repairs. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.2 | Accomplish top end overhaul of main engines. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.3 | Install high capacity fuel filters on main engines. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.4 | Install duplex fuel filters to both SSDG's. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.1 | Replace air compressors. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.2 | Hydrostatic test air receiver tanks. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.3 | Fuel oil transfer pump | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.1 | Overhaul ships service diesel generators | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.2 | Replace winch and capstan controllers. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.3 | Install electric/hydraulic mast lift. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.4 | Repair air conditioning system. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.5 | Remove space heaters from crews berthing. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.1 | Sea Valves. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.2 | Install diesel generator keel cooler drain valve. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.3 | Install fire pump keel cooler drain valve. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.4 | Start Air System Piping Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.5 | Install Fuel Filter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.12.1 | Repair winch hydraulic hoses. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.13 | Dock and sea trials. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Scope (SOW/PWS) | Labor Rate/MH: | Profit Rate: | $0.00 | |
| Total Work Package |
PARAGRAPH No. TITLE M/H MATERIAL PRICE TOTAL Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Labor Cost Material Cost TOTAL Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)
Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)
| 3.2.9 | Hull Repairs Repairs Reservation Tasking | 292 | $1,997.67 | $1,997.67 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,997.67 |
| 3.5.4 | Main Deck Repairs (Reservation Tasking) | 106 | $1,312.00 | $1,312.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,312.00 |
| 3.11.6 | Piping Repairs Reservation Tasking | 220 | $16,307.17 | $16,307.17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $16,307.17 |
| Column Totals | 618 | $19,616.84 | $19,616.84 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $19,616.84 |
Total Reservation Tasking (RT): $19,616.84
Total Proposed Price: $19,616.84
********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract to include Reservation Tasking.