N4523A18R1058_RFC_006.pdf

PDF 40 KB Posted

Attached to
Maintenance, Preservation, and Repair of YT-800
Solicitation number
N4523A18R1058
Issued by

About this file

N4523A18R1058 YT-800 RFC 006

View the file

Other files

File Type Posted
N4523A18R1058_Attachment_J-1__SOW_Errata_2_YT_800_Posted_28JUN2018.pdf PDF
N4523A18R1058_YT-800__Amendment_0003.pdf PDF
N4523A18R1058_YT-800__Amendment_0002.pdf PDF
N4523A18R1058_RFC_009.pdf PDF
N4523A18R1058_RFC_008.pdf PDF
N4523A18R1058__RFC_005.pdf PDF
N4523A18R1058_RFC_002.pdf PDF
N4523A18R1058_YT-800_SOW_Errata_One_12JUNE2018.pdf PDF
N4523A18R1058__RFC_004.pdf PDF
N4523A18R1058_YT-800_SOW_reference_drawing_Errata_One.zip ZIP file
N4523A18R1058_YT-800__Amendment_0001.pdf PDF
N4523A18R1058__RFC_003.pdf PDF
N4523A18R1058_RFC_001.pdf PDF
N4523A18R1058_Updated_5-way_break_out_13JUNE2018.xlsx XLSX spreadsheet
N4523A18R1058_RFC_007.pdf PDF
N4523A18R1058_YT-800_Solicitation.pdf PDF
N4523A18R1058_Attachment_J-1_SOW_YT_800.pdf PDF
N4523A18R1058_Attachment_J-7_GFP.pdf PDF
N4523A18R1058_Attachment_J-5_Corporate_Experience_Data_Sheet.docx DOCX document
N4523A18R1058_Attachment_J-4_Contract_Performance_Data_Sheet.docx DOCX document
N4523A18R1058_Attachment_J-2_YT-800_5-way_break_out.xls.xlsx XLSX spreadsheet
N4523A18R1058_Attachment_J-8_BAVR_Instructions.pdf PDF
N4523A18R1058_Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx DOCX document
N4523A18R1058_YT_800_SOW_Draft.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST: 6/11/2018 QUESTION NO:

REQUIREMENT: 5-way breakdown REQUISITION NO.: N4523A18R1058

ITEM NO: 3.6.3

TITLE: UT Inspection

ISSUING OFFICE POC (CODE 440.22):

Brittany Chartier: (360) 476-5708 Brittany.chartier@navy.mil

PARA. NO: PAGE NO: CONTRACTOR:

PLANNER’S NAME: ATTACH. NO: J-2 CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION:

Can you clarify what the TOTAL column for Item 3.6.3 (UT Inspection) is based on?

If I enter the same number of man hours and materials into both Items 3.6.3 (UT Inspection) and 3.5.3 (UT Inspection) I end up with a different amount in the TOTAL column.

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: SERIAL NO:

Please see updated Attachment J-2 5-Way breakout 13JUNE2018.