REQUEST FOR SPECIFICATION CLARIFICATION
DATE OF REQUEST: 6/11/2018 QUESTION NO:
REQUIREMENT: 5-way breakdown REQUISITION NO.: N4523A18R1058
ITEM NO: 3.6.3
TITLE: UT Inspection
ISSUING OFFICE POC (CODE 440.22):
Brittany Chartier: (360) 476-5708 Brittany.chartier@navy.mil
PARA. NO: PAGE NO: CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: J-2 CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
Can you clarify what the TOTAL column for Item 3.6.3 (UT Inspection) is based on?
If I enter the same number of man hours and materials into both Items 3.6.3 (UT Inspection) and 3.5.3 (UT Inspection) I end up with a different amount in the TOTAL column.
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
Please see updated Attachment J-2 5-Way breakout 13JUNE2018.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.