REQUEST FOR SPECIFICATION CLARIFICATION
DATE OF REQUEST: 5/23/18 QUESTION NO: 008
REQUIREMENT: 5-way breakdown REQUISITION NO.: N4523A18R1054 ITEM NO: 5-way breakdown
TITLE:
ISSUING OFFICE POC (CODE 440.22):
Brittany Chartier: (360) 476-5708 Brittany.chartier@navy.mil
PARA. NO: PAGE NO: CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: J-2 CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
Can you explain how the G&A and Profit columns are calculated on the updated 5-way breakdown issued on 5/23/18? They do not appear to be the same formulas issued on the original file.
For example, on the revised 5-way breakdown, when inputting 4 hours @ $75 and $100 materials, the G&A column set at 10% is reflecting $40 and the profit set at 20% is reflecting $8.00. The original file reflected G&A at $30 and Profit $20, which should be the correct calculation for 10% and 20%, respectively.
DO NOT WRITE BELOW THIS LINE
SPEC CHG: N DWG/REF CHG. N RQMTS CHG: N MAT'L CHG: N
TECHNICAL REVIEW: K.Stubblefield SERIAL NO:
Please see Amendment 0004 of the Solicitation posted on FBO.gov. The updated Attachment J-2 has been posted and is labeled “N4523A18R1054 SWOB-8 Updated Attachment J-2 break out 24 MAY 2018”
The formula for the G&A= Man Hours *Labor Rate * G&A Rate
The formula for the profit= (Prime Material Costs + Subcontractor Labor Cost + Subcontractor Material Cost) * Profit Rate
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.