N4523A18R1054_Attachment_J-2_SWOB-8_5-way_Breakdown.xls
XLS spreadsheet 71 KB Posted
- Attached to
- Maintenance, Preservation, and Repair SWOB-8
- Solicitation number
- N4523A18R1054
About this file
N4523A18R1054 Attachment J-2 SWOB-8 Price Proposal Worksheet (5-way Breakdown)
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
vessel name
| INSERT CONTRACTOR/COMPANY NAME HERE | ||||||||||
| Project = | SWOB-8 | DATE: = | ||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | |||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.7.1 | Transport Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.7.2 | Provide Office Space | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.11 | CFR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.16.1 | Maintain Preservation OQE Records | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.17 | Enviromental/Hazwaste management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.21 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.22.1 | Develop & Maintain Test Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.23 | Compartment Arrival & Closeout Inspections | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.1.5 | Setting & Aligning Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.1.6 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.1.7 | Dock the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.1.8 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.1.9 | Undock the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.1.11 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.1 | Distinguishing Figures & Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.4 | Hull Blasting & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.6 | Hull and Freeboar UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.7 | Skegs Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.9 | Steel Half Pipe Ladder | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.1 | Identify Distinguishing Figures & Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.2 | Deckhouse Blasting & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.3 | Deck House Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.4 | Deck House Non-Skid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.5 | Deck House Exterior Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.6 | Deck House Door Gasket | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.1 | Open, Pump, Clean, Close, Gas Free Tanks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.2 | Identify Color Schemes & Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.3 | Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.4 | Cargo Tank UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.5 | Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.6 | Sight Glass Replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.7 | Cargo Tank Touch Up Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.8 | Void Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.9 | Tank, Void & Hatch Cover Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.10 | Hatch Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.11 | Tank & Void Covers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.12 | Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.4.13 | Tank Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.5.1 | Main Deck Nonskid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.5.2 | Visual Inspection for Structural Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.5.3 | Ultrasonic Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.5.4 | Cofferdam Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.6.1 | TLI Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.7.1 | Cargo & Overflow Piping Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.7.2 | Cargo Piping UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.7.3 | Piping Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.7.4 | Valve Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.7.5 | Cargo Piping Simplex Strainer Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | $0.00 | ||||||
| Total Bid: |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
File details come from the government source that posted it.