Solicitation # N4523A18R0826
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4523A18R0826-0004.pdf | ||
| N4523A18R0826-0003.pdf | ||
| Pre-proposal_Telecon_Attendees_List-13Mar2018.pdf | ||
| N4523A18R0826_Bidders_Question-Responses-14Mar2018.pdf | ||
| N4523A18R0826-0002.pdf | ||
| N4523A18R0826-0001.pdf | ||
| N4523A18R0826__AMEND_1_released.pdf | ||
| J-3-Notional_Price_Breakdown_Form.xls | XLS spreadsheet | |
| J-2-Notional_Statement_of_Work.pdf | ||
| J-1-DD_FORM_254.pdf | ||
| J-4-RFP_Question-Response_Matrix.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 12:00 PM local time 26 Mar 2018
X
A X B X C X D
EX
X
G F 71 - 87
88 - 99 X H 100 - 103 timothy.smart@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A3 1 103
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N4523A 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
808 Burwell St Bremerton WA conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
TIMOTHY S SMART 360-476-4091
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 4
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
5 - 28 29 - 30
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
31 - 32 33 - 35
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 36 - 39 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 40 - 55 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
56 - 69
PART II - CONTRACT CLAUSES
PUGET SOUND NAVAL SHIPYARD CODE 400
1400 FARRAGUT
CONTRACTING CODE 440
BREMERTON WA 98314
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
23 Feb 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N4523A18R0826
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
CLIN
Number
1 Each
Preservation and Repair
FFP
Contractor to provide work in the preservation of critical and non-critical surfaces and installation of new coating systems which may include single and multiple coat systems, ultra-high solids, epoxy, solvent based, and anti-fouling. In addition, provide necessary structural repair requirements to support the preservation process for aircraft carrier(s), submarine(s), caisson(s), and other vessels during maintenance availabilities at Puget Sound Naval Shipyard and Intermediate Maintenance Facility, Bremerton, WA (Controlled Industrial Area) and at other locations in the region as identified in delivery orders in accordance with section C, Statement of Work. Period of performance is four years from date of award.
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
CLIN
Number
UNDEFINED
NSP CDRLS
FFP
All deliverables annoted in CDRLs established at time of delivery order shall be delivered as required and in accordance with the delivery order statement of work.
Period of performance is four years from date of award.
MAX
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
HQ B-2-0009 CDRL NOTE (NAVSEA) (SEP 1990)
NOTE A - Offeror shall complete the "Price Group" and "Estimated Total Price" blocks of each data item on the Contract Data Requirements List(s), attached hereto.
HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)
This entire contract is fixed price.
Section C - Descriptions and Specifications
DESCRIPTIONS AND SPECIFICATION
1. SCOPE
1.1 Background. The Northwest Regional Maintenance Center (NWRMC), Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF), Industry Management Department, Code 400 intends to utilize this contract to procure preservation of critical and non-critical surfaces and installation of new coating systems which may include single and multiple coat systems, ultra-high solids, epoxy, solvent based, and anti-fouling. As well as associated structural repair requirements necessary to support the preservation process for aircraft carrier, submarine and other vessels during maintenance availabilities at Puget Sound Naval Shipyard and Intermediate Maintenance Facility, Bremerton, WA (Controlled Industrial Area) and at other locations in the region as identified in task orders.
Typical preservation services for aircraft carriers and submarines are as follows: Underwater Hull (including domes, sea chests, rudders, anode shields), Freeboard Surfaces (including ventilation intake/exhaust screens and coamings, flight deck overhang, sponsons, and platforms), Catwalks, Voids, Ventilation Plenums, Aircraft Elevators and Recess Areas, Exterior and Interior Surfaces (overheads, bulkheads and decks). Coating systems may include non-aviation area non-skid product installation (sponsons, platforms, catwalk areas).
Typical preservation services for submarines are as follows: Interior and Exterior Tanks (including Main Ballast, Mud, Potable Water, Sanitary, and Auxiliary), Sail (Interior and Exterior), Pressure and Non-Pressure Hull, Superstructure, Exterior Recesses, Free Flood areas, and Interior and Exterior Surfaces. Coating systems may include single and multiple coat systems, ultra-high solids, epoxy, solvent based, and anti-fouling.
Typical preservation services for other vessels and craft are as follows: Underwater Hull, Freeboard Surfaces, Interior and Exterior Spaces (overhead, bulkhead and deck) and Tanks.
2. APPLICABLE DOCUMENTS
2.1 Specifications and Standards. If, during the performance of this contract, the Contractor believes that the contract contains outdated or different versions of any specifications or standards, the Contractor may request that this contract be updated to include the current version of the applicable specification or standards. Updating shall not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government.
The Contractor shall submit update requests to the Contracting Officer with copies to the Contracting Officer Representative (COR). The Contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract. The following specifications, standards and handbooks form a part of this document to the extent specified herein.
2.1.1 Naval Sea Systems (NAVSEA) Standard Items, Category I and II, Current Fiscal Year/Change Version
2.1.2 Systems and Specifications, SSPC Painting Manual, Volume 2, Current Version
2.1.3 NACE Book of Standards, Current Version
2.1.4 NorthWest Regional Maintenance Center (NWRMC) Local Standard Items:
2.1.5 DOD INST 5220.22M, Department of Defense Industrial Security Manual
2.1.6 MIL-HDBK-881, Work Breakdown Structures for Defense Material Items
2.1.7 NAVSEA S-0300-API-1-00-0, NAVSEA Standard Components List for Hull, Mechanical and Electrical
Equipment
2.1.8 NAVSEA S9AA0-AB-GOS-010/GSO, Current Version, General Overhaul Specifications for Overhaul of
Surface Ships
2.1.9 Other references will be identified in individual Task Orders issued.
3. REQUIREMENTS
3.1 General Requirements. The Contractor shall provide all management, labor, staging, containment, material, support services, and equipment necessary to perform preservation and associated structural repair services necessary to support the preservation process detailed in work specifications of task orders issued. The preservation and maintenance services shall be performed on shipboard interior and exterior surfaces in accordance with Navy and industrial specifications and standards, as well as all local, regional, state, and federal laws, rules, regulations, policies, and procedures regarding safety, security, health, and environmental protection. The production schedule requirements are of utmost importance to the Navy and shall be adhered to unless deviation is authorized by the Contracting Office.
3.1.1 Contractor Designated Principal. The Contractor shall assign one lead employee, authorized to obligate the Contractor, to coordinate all aspects of the contract with the designated Government representative and vice versa.
The following additional responsibilities will be required upon award of a delivery order under this contract:
a. Coordinate with the Contracting Officer’s Representative to keep the contracting officer apprised of schedule, technical, material, and financial issues pertaining to the contract.
b. Coordinate work integration and sequencing with Naval Supervisory Activity (NSA) project team and Code 400 Contracting Officer and/or Contracting Officer’s Representative.
c. Participate and coordinate in weekly overall schedule progress reviews with Government representative assigned. Attend project daily (workday) team meetings to ensure a coordinated effort in accomplishment of work.
d. The Contractor shall maintain QP-1 certification in compliance with the requirements of the Systems and Specifications, SSPC Painting Manual, Volume 2, Current Version.
3.1.2 Contractor Safety and Health Manager. The contractor shall assign a Safety and Health Manager for orders issued under this contract. The Safety & Health Manager shall have at least 5 years of experience in marine preservation efforts in a U.S. Navy shipyard environment with two (2) or more years of direct experience with standards and specifications for application of coating systems and shall be able to ensure the requirements of federal, state, local laws, codes, ordinances, and regulations are met. Experience, certifications and education should document the ability to implement and manage robust programs as required by OSHA 29 CFR 1910 and 1915 including competent persons, respirator programs, heavy metal programs, air monitoring and sampling plans including chain of custody to ensure the safety of personnel.
3.1.3 Communications. All communication with other Government organizations / entities shall be via the Contracting Officer or designated Government representative unless otherwise authorized.
3.2 Navy Maintenance Database (NMD). Contractor shall obtain access to NMD to provide electronic communication of work requirements associated to this contract. Access to NMD shall be coordinated through the Contracting Officer’s Representative upon contract award.
Included in the Contractor NMD communications work requirements are Conditions Found Reports (CFR’s) whereby the Contractor will identify needed repairs and recommend corrective action during contract performance for those deficiencies discovered which are not covered by the original work item specifications. The CFR shall be submitted via the NMD system within three working days of identification of the requirement.
At a minimum, the CFR will include the following:
Identify contract number, ship and hull number Serialized by CFR number Identification of the applicable Work Item Specification number Date requirement was discovered Description of the work requirement Specific location of the work Recommendation for corrective action Recommendation for the appropriate/best time to accomplish the work (i.e. during current availability with or without schedule change).
Provide supporting rational for the recommendation, such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.
Identification of related changes, if any, to production milestones/key events and contract completion date.
If none, so state.
A Rough Order of Magnitude (ROM) cost estimate (+/- 10%) shall be included as part of the CFR submission in NMD. The Government Maintenance Team will review the CFR deficiency identified, the Contractor’s recommendation for corrective action, estimate for correctness, and further determine if the work is required and potentially affordable.
If the CFR is inadequate or incomplete, it will be rejected back to the Contractor in NMD. To mitigate this, in many cases, the Government and Contractor will meet, discuss the recommendation for corrective action, make ship checks etc. to determine the full scope of work and evaluate costs prior to submittal of the CFR. If the identified CFR is determined to be necessary, a Request for Contract Change (RCC) will be generated.
3.3 Authorized Government Representatives. The contractor shall perform work in accordance with this contract. Should the contractor be instructed by an individual other than the Contracting Officer to perform work that it considers a change to this contract, the contractor shall not perform such work and shall immediately notify the Contracting Officer and/or Contracting Officer’s Representative (COR) in accordance with the notification of changes clause, FAR 52.243-7.
3.4 Specific Requirements. The work specification package, issued for each task order, includes details of work requirements not listed in this contract section.
3.5 Pre-Commencement Conference. Within three (3) working days of receipt of the signed task order, the Government shall advise the contractor of the date for a pre-commencement conference. This conference shall be held at least five (5) working days before the contractor’s preservation team services are scheduled to begin. The primary purpose of this conference is interaction/integration between the contractor’s team and NSA Project Team.
The contractor shall be prepared to discuss the following (not necessarily in order of importance):
1. Space (lay-down area), onboard vessel and/or pier side, needed by the contractor for staging, etc.
2. Noise, dust and grit containment / minimization
3. Abrasive media and paint receipt inspection, storage, staging, handling
4. Employee Safety
5. Accessibility of spaces to ship and shipyard personnel while those spaces are undergoing preservation effort
6. Contractor’s work schedule by space
7. Quality Assurance (QA)
8. Contractor Industrial Hygiene Program; to include worker showers / change-rooms
SECURITY REQUIREMENTS
NAVAL BASE KITSAP (NBK) and/or PSNS & IMF CONTROLLED INDUSTRIAL AREA (CIA) ACCESS:
1.1. Contractor personnel shall comply with all current badging and security procedure requirements for gaining access to Department of Defense (DoD) Installations/Government Sites. Access to Navy Installations or Sites may only be gained by obtaining a badge (either permanent or temporary) from the Visitor Control Center (VCC) in building 981 (Pass & ID). It is the contractor’s responsibility to check for, and obtain changes and updated information from the VCC on a continual basis.
1.2. The following Identification Cards (ID) are authorized by Naval Base Kitsap and Naval Station Everett to be used by visitors 12 years old or greater, while being escorted by a Civil Servant or Military member holding a current CAC Card, effective 2 February 2016:
• Drivers licenses from states other than Washington, Illinois, Minnesota, Missouri and New
Mexico (unless WA, IL, MN, MI and NM licenses are the “Enhanced” version)
• U.S. passport
• U.S. passport card
• DHS trusted traveler cards ( Global Entry, NEXUS, SENTRI, FAST)
• Permanent resident card
• Border crossing card
• DHS-designated enhanced driver’s license
• Federally recognized, tribal-issued photo ID
• HSPD-12 PIV card
• Foreign government-issued passport
• Canadian provincial driver’s license or Indian and Northern Affairs-Canada card
• Transportation Worker Identification Credential (TWIC)
1.2.1. Contractor employees are required to have an individual identification badge as well as one (1) of the four (4) credentials listed below in their possession to gain access to job sites:
1.2.1.1. Common Access Card (CAC):
1.2.1.1.1. Contractors who have a need to access a government computer system may be eligible for a contractor CAC; most contractors are not eligible for a CAC. Contact the Contracting Officer’s Representative (COR) or Contracting Officer’s Security Officer for assistance as needed.
1.2.1.2. Single Day Pass:
1.2.1.2.1. Visiting vendors/contractors requiring infrequent access may obtain daily passes directly from the individual Navy Installation by submitting identification credentials for verification and undergoing a criminal screening/background check. A new pass is required to gain access each day. Passes are issued by Naval Base Kitsap (NBK). The Federal Bureau of Investigation’s (FBI) National Crime Information Center (NCIC) criminal database and FBI Terrorist Watch List will be checked daily prior to entry. In addition, NBK must check the Navy’s Consolidated Law Enforcement Operations Center (CLEOC) database to ensure an unescorted visitor has no objectionable criminal record, is not on the Terrorist Watch List and has not been previously debarred from entry onto any Navy Installation.
1.2.1.3. Defense Biometric Identification System (DBIDS) Program: Commander, Navy Installations Command (CNIC) has established the Defense Biometric Identification System (DBIDS) for access control to CNIC Installations via Entry Control Points (ECP). DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.
1.2.1.3.1. The Government performs background screening and credentialing.
Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
1.2.1.3.2. Access to Installation. All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS). The Contractor shall provide the Contracting Officer with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS.
Contact the Contracting Officer’s Representative (COR) or Contracting Officer’s Security Officer for assistance as needed. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.
1.2.1.3.3. DBIDS Credentials. Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at:
https://www.cnic.navy.mil/om/dbids.html.
1.2.1.3.4. The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.
1.2.1.3.5. The Contractor shall immediately collect employee DBIDS credentials and notify the Contracting Officer in writing:
1.2.1.3.5.1. That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.
1.2.1.3.5.2. That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.
1.2.1.3.6. DBIDS Paper Passes. In the event that a visitor, vendor, or Contractor employee elects not to participate in DBIDS, the individual will be issued DBIDS paper pass from the Base Pass and Identification Office in order to access to the installation. The time standard for the validity of a pass to access an installation will be not more than thirty (30) days and may be further restricted based on local policy or by Federal, DOD, Navy, and CNIC guidance. The Government will not be responsible for any cost or lost time associated with obtaining paper passes or added vetting or inspections incurred by non-participants in the DBIDS credentialing process.
1.2.1.4. Transportation Workers Identification Credential (TWIC):
1.2.1.4.1. Trucking and Longshoremen industry, to include Military Sealift
Command (MSC) personnel are authorized to use this credential for unescorted access so long as the holder also has in his/her possession an original Bill Of Lading indicating that the delivery of goods is within the perimeter of the host installation, or in the case of MSC personnel, the holder has in his/her possession, a current Merchant Mariner identification card.
1.3. For contractor individuals that require higher level access requirements such as Nuclear Work Areas (NWA), Controlled Nuclear Information Areas (CNIA) areas or access to the Main Machinery Rooms of nuclear propelled ships or submarines, the Contractor’s Facility Security Officer ( FSO) shall; (1) submit each individual’s information into the Joint Personnel Adjudication System (JPAS) Visit Request program with Security Management Office (SMO) number 002515, and (2) Submit a completed DD254 (ensuring that block 10b is checked), and that the Naval Nuclear Propulsion Information (NNPI) security clause is listed in either the Security Section of the Statement of Work (SOW) or in the list of effective clauses for review by the Industrial Security Office. Additionally, a separate Visit Request List Form (PSNS&IMF Form 5512) must be submitted to the Contracting Officer’s Security Officer.
1.4. The contractor shall prepare a Visit Request List Form with Cover Letter on Company Letterhead for all prime contractor and subcontractor personnel required to access Navy Vessels in the CIA. The visit request will be submitted via email to the Contracting Officer’s Security Officer at psnsimf.400scrty.fct@navy.mil. The cover letter will be a formal request for badging and access during the contract or delivery period of performance. The letter shall include (1) the purpose of access,
(2) dates of validity (period of performance), (3) contract number, and (4) name of subcontractors to be employed. The cover letter shall be signed by the Prime Contractors Facility Security Officer (FSO), and shall be received by the Contacting Officer’s Security Officer NO LESS THAN FIVE (5) FULL WORKING DAYS PRIOR TO THE REQUESTED START DATE (8-10 calendar days prior is recommended). If red badges are required (for contractor personnel to access Restricted Data/Naval Nuclear Propulsion Information-NNPI) there are additional screening and higher level approval requirements, which could take considerably longer. Therefore, personnel identified in the Visit Request List must have a valid requirement to gain access to Restricted Data/NNPI. The prime contractor shall bear full responsibility for the accuracy of the Cover Letter and Visit Request List. Note: Submitting a cover letter and/or list with incomplete information, errors or a blanket list of all company personnel (especially for all red badges) can significantly delay processing requests and result in not being authorized access in time to begin the period of performance. With good cause, as determined by the Contracting Officer or appropriate Security Personnel, access requests may be refused or amended at any time. Updates to the Visit Request List shall be made on an as needed basis. The C400 security office may be contacted at (360) 476-0418 for questions regarding visit request processing.
1.5. The Visit Request List will be organized ALPHABETICALLY BY LAST NAME and contain the following information in column form (a spreadsheet template can be obtained by contacting the Contracting Officer’s Security Officer or COR).
• NAME ( LAST, FIRST, MI)
• DOB (Date of Birth)
• POB (City & State)
• SSN (Social Security Number)
• CITIZENSHIP (Country)
• PROFESSION/TRADE
1.6. Contractor employees must be U.S. citizens to access PSNS & IMF owned or controlled spaces unescorted, to include ship's engineering spaces. Foreign Nationals will be issued "Escort Required" white badges only. Additionally, an approved special security plan indicating the proposed visit locations and route to and from the location must be utilized. This requirement adds 3 working days to the visit request process. U.S. citizens working for Foreign Owned or Controlled Companies requiring access, unless they fall under a Defense Security Service (DSS) security clearance, will be issued Green badges only suitable for general CIA access. Access by U.S. citizens working for Foreign Owned or Controlled Companies into more stringently controlled areas such as Nuclear Work Areas (NWA) require a security plan and escorts. Ensure personnel employed by Foreign Owned or Controlled Companies are clearly identified in Visit Request documents and in communications with the Contracting Officer's Security Officer. Security Clearance information, including confirmation of required red badges, shall be submitted to the Contracting Officer's Security Officer.
1.7. Badges will be picked up at the Naval Base Kitsap Visitor Control Center (VCC) in building 981. Each Contractor employee is REQUIRED to present proof of citizenship for on-site verification (not retention) at the VCC prior to obtaining a badge. This is a requirement for access into the CIA at PSNS&IMF, Bremerton, WA. All contractor employees requesting access shall be U.S. citizens. Acceptable proof of citizenship includes Original Birth Certificate (not a copy) or Current U.S. Passport.
1.8. Lack of a proper ID badge will result in denial of access to the Naval Installation, facility and/or the ship, resulting in a delay at the Contractor’s expense. If Contractor employees are providing a document with no photo, they shall also be required to present a current authorized official issue photo ID listed in paragraph 1.2 above.
1.9. Badges must be displayed on the outermost garment above the waist at all times. The only exception would be while the contractor personnel are engaged in work which could cause a safety hazard if the badge were worn while performing the work.
1.10. Contractor personnel are authorized to retain temporary badges until the badge expiration date or termination of employment. Upon badge expiration date, termination of employment, or completion of contract, the Contractor is required to immediately notify the Contracting Officer’s Security Officer and return all badges.
1.11. Lost or misplaced badges shall be reported immediately to the Contracting Officer’s Security Officer and
COR. If after hours report lost or misplaced badges immediately to the Navy Emergency Services Command (NESCOM) at 360-476-3393.
1.12. Immediately notify the Contracting Officer’s Security Officer and the COR of any access problems or security concerns.
1.13. To grant Contractor Vehicle Access to the PSNS & IMF CIA, a list of vehicles, a copy of each vehicle registration and a justification for access shall be submitted for processing via PSNS & IMF Form 5530/25. Contractors are required to stop at PSNS & IMF Pass & ID Office with proof of valid, current Driver’s License, vehicle registration and proof of insurance, prior to receiving access.
1.14. Contractor owned computers must be inspected by Code 109 prior to bringing them into the CIA and shall have a PSNS&IMF AIS Security Survey for Visitor Computer Equipment Form PSNS&IMF 5239/49 (Rev. 8-07), approved by Code 109, on site at all times.
1.15. Contractor Employees shall adhere to PSNS&IMF NOTICE 5239.6 PORTABLE ELECTRONIC
DEVICE (PED) GUIDANCE.
1.15.1. Lap-top Computers and/or cell phones equipped with cameras are STRICTLY PROHIBITED inside all PSNS & IMF owned or controlled spaces or property (the CIA, DMF & YOKO Enclaves, etc.) and subject to seizure by Installation Police and Shipyard Security Personnel.
1.15.2. ALL portable electronic devices are STRICTLY PROHIBITED onboard submarines (e.g.
phones, mp3 devices, computing devices, recording equipment, removable storage media, etc.).
2. NAVAL BASE KITSAP, BANGOR OPERATIONAL AREA (OA) / INDIAN ISLAND &
WATERFRONT RESTRICTED AREAS ACCESS:
2.1. PSNS & IMF CIA “Green” badges shall not provide access to the NBK Bangor Operational Area (OA).
PSNS & IMF CIA higher level badges (i.e. Red badges) shall provide access to the OA, but will not provide access to the Bangor Waterfront Restricted Areas.
2.2. Contractor employees that require access to the OA & Waterfront Restricted Area are required to obtain a CAC, DBIDS pass and card or a single day pass per paragraph 1.2.1.1 through 1.2.1.4.1 above.
2.3. The contractor shall prepare and submit a Visit Request via the Badge Authorization and Visit Request
(BAVR) at https://bavr.cnic.navy.mil for each contractor employee. A Common Access Card (CAC) is required to access the BAVR website. If you are not eligible for, or have not yet been issued a CAC, your command/government sponsor can fill out the request for you (with the pertinent personal information available), or you can contact the VCC for guidance and assistance. The Visit Request application must be received a minimum of five (5) full working days prior to the job start date (8-10 calendar days prior is recommended). Ensure that you completed all sections including PSNS & IMF sponsor (Contracting Officer’s Security Officer) and contract number into BAVR.
2.4. The contractor shall prepare and submit a Visit Request Form for each contractor employee to Commander, Navy Region Northwest (CNRNW) Pass & ID Office Bangor to receive a CNRNW badge.
2.5. For Vehicle Access, contractors shall provide a valid, current Driver's License, vehicle registration, and proof of insurance to the Pass & ID Office of the Naval Installation.
2.6. Cell phones equipped with cameras are PROHIBITED in the Waterfront Restricted Areas.
3. NAVAL BASE KITSAP, KEYPORT (NAVAL UNDERSEA WARFARE CENTER DIVISION,
KEYPORT) ACCESS:
3.1. If contractor employees are required access to NUWC Keyport, they will be required to obtain a CAC, DBIDS pass and card or a single day pass per paragraph 1.2.1.1 through 1.2.1.4.1 above.
3.2. All other visit requests requiring access to buildings the Contractor’s Facility Security Officer (FSO) shall;
(1) submit each individual’s information into the Joint Personnel Adjudication System (JPAS) Visit Request program with Security Management Office (SMO) number 002536, and (2) Submit a completed DD254 (ensuring that block 10b is checked), and that the Naval Nuclear Propulsion Information (NNPI) security clause is listed in either the Security Section of the Statement of Work (SOW) or in the list of effective clauses for review by the Industrial Security Office. Additionally, a separate Visit Request List Form (PSNS&IMF Form 5512) must be submitted to the Contracting Officer’s Security Officer.
3.3. For specific security requirements see NUWC Keyport’s OPSEC Guide for Defense Contractors at http://www.navsea.navy.mil/Portals/103/Documents/NUWC_Keyport/OPSEC%20%20Guide% 20for%20Defense%20Contractors_2016.pdf. A copy of the guide can also be obtained by contacting the Contracting Officer’s Security Officer or COR.
4. NAVAL STATION EVERETT ACCESS:
4.1. If contractor employees are required access to Naval Station Everett, they will be required to obtain a CAC, DBIDS pass and card or a single day pass per paragraph 1.2.1.1 through 1.2.1.4.1 above.
4.2. For Pier Access to vessels, the contractor shall prepare and submit a Visit Request via the BAVR as identified in paragraph 2.3 above.
LOCAL CLAUSE
Item(s) 0002 - The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.
HQ C-2-0002 ACCESS TO PROPRIETARY DATA OR COMPUTER SOFTWARE (NAVSEA) (JUN 1994)
(a) Performance under this contract may require that the Contractor have access to technical data, computer software, or other sensitive data of another party who asserts that such data or software is proprietary. If access to such data or software is required or to be provided, the Contractor shall enter into a written agreement with such party prior to gaining access to such data or software. The agreement shall address, at a minimum, (1) access to, and use of, the proprietary data or software exclusively for the purposes of performance of the work required by this contract, and (2) safeguards to protect such data or software from unauthorized use or disclosure for so long as the data or software remains proprietary. In addition, the agreement shall not impose any limitation upon the Government or its employees with respect to such data or software. A copy of the executed agreement shall be provided to the Contracting Officer. The Government may unilaterally modify the contract to list those third parties with which the Contractor has agreement(s).
(b) The Contractor agrees to: (1) indoctrinate its personnel who will have access to the data or software as to the restrictions under which access is granted; (2) not disclose the data or software to another party or other Contractor personnel except as authorized by the Contracting Officer; (3) not engage in any other action, venture, or employment wherein this information will be used, other than under this contract, in any manner inconsistent with the spirit and intent of this requirement; (4) not disclose the data or software to any other party, including, but not limited to, joint venturer, affiliate, successor, or assign of the Contractor; and (5) reproduce the restrictive stamp, marking, or legend on each use of the data or software whether in whole or in part.
(c) The restrictions on use and disclosure of the data and software described above also apply to such information received from the Government through any means to which the Contractor has access in the performance of this contract that contains proprietary or other restrictive markings.
(d) The Contractor agrees that it will promptly notify the Contracting Officer of any attempt by an individual, company, or Government representative not directly involved in the effort to be performed under this contract to gain access to such proprietary information. Such notification shall include the name and organization of the individual, company, or Government representative seeking access to such information.
(e) The Contractor shall include this requirement in subcontracts of any tier which involve access to information covered by paragraph (a), substituting "subcontractor" for "Contractor" where appropriate.
(f) Compliance with this requirement is a material requirement of this contract.
HQ C-2-0003 ACCESS TO THE NAVY SUPPLY SYSTEM (NAVSEA) (MAR 2011)
(a) In compliance with the comparability requirement of 10 U.S.C. 7314, Public and Private Shipyards will be provided equal access to the Naval Supply System. Use by private yards is permissive, not mandatory.
(b) Pursuant to the clause of this contract entitled "GOVERNMENT SUPPLY SOURCES" (FAR 52.251-1) the Contracting Officer hereby authorizes the Contractor to place orders with the Navy Supply System for materials and equipment or other supplies necessary to perform the required work. The Naval Supply System shall process such orders in the same manner as it would for any other Navy supply user, and the Contractor shall make payment on account of materials and equipment and other supplies ordered and/or received in accordance with the normal requirements of the Naval Supply Systems Command, but in no event shall payment in full be any later than 30 days after receipt by the Contractor of each order. The Contractor shall pay the Naval Supply System any costs for materials, equipments, or other supplies obtained including any surcharges normally charged to any other Naval Supply System user.
(c) This job order has been priced on the basis that, except as specifically provided elsewhere in this contract with regards to Government furnished property, the Contractor shall provide all necessary materials, equipments and supplies for performance of this contract. If the Contractor uses the Naval Supply System, it has elected to use the system for its own convenience to meet its contractual obligations to perform the work under this contract. The Naval Supply System is considered to be an alternate source or vendor of contractor furnished material; therefore materials, equipments, or other supplies ordered and/or obtained from the Naval Supply System are specifically not considered to be Government furnished material, but are considered to be contractor furnished material. The Government makes no representation as to the availability of materials, equipments, or other supplies for the performance of the work required under this contract, nor shall unavailability, late delivery, delivery of non-conforming supplies, higher costs of the Naval Supply System (if any), or any failure of the Naval Supply System to meet the expectations or requirements of the Contractor constitute excusable delay or grounds for equitable or any other adjustment to the contract or relief from the requirement to perform in accordance with the terms of the contract.
HQ C-2-0004 ACCESS TO THE VESSEL(S) (NAVSEA) (SEP 2016)
Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.
HQ C-2-0005 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (SEP 2016)
(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by COMNAVSEA or his designated representative that such access should be permitted in the best interest of the United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST
5510.3 (series) in effect on the date of this contract or agreement.
(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control Plan (ACP) which shall contain as a minimum, the following information:
(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.
(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.
(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.
(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.
(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.
(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.
(3) Data reflecting the number, nationality, and positions held by non-U.S. citizen employees, including procedures to update data as non-U.S. citizen employee data changes, and pass to cognizant CAO.
(4) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.
(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.
(c) To request approval for non-U.S. citizens of hostile and/or communist-controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22-M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for the above group. Approval of ACP's for access of non-U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non- U.S. citizens of hostile and/or communist-controlled countries.
(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated or default in accordance with the clause entitled "DEFAULT (FIXED-PRICE SUPPLY AND SERVICE)" (FAR 52.249-8), "DEFAULT (FIXED-PRICE RESEARCH AND DEVELOPMENT)" (FAR 52.249-9) or "TERMINATION (COST REIMBURSEMENT)" (FAR 52.249-6), as applicable.
(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.
(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.
(g) The same restriction as in paragraph (f) above applies to other non-U.S. citizens who have access to the Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.) except that, with respect to access to the vessel and worksite, the restrictions shall not apply to uniformed U.S.
Navy personnel who are non-U.S. citizens and who are either assigned to the ship or require access to the ship to perform their duties.
HQ C-2-0006 ADDITIONAL PROVISIONS RELATING TO GOVERNMENT PROPERTY (NAVSEA)
(SEP 2009)
(a) For purposes of paragraph (h) of the clause entitled "GOVERNMENT PROPERTY" (FAR 52.245-1) in addition to those items of property defined in that clause as Government Property, the following shall also be included within the definition of Government Property:
(1) the vessel;
(2) the equipment on the vessel;
(3) movable stores;
(4) cargo; and
(5) other material on the vessel
(b) For purposes of paragraph (b) of the clause entitled "GOVERNMENT PROPERTY", notwithstanding any other requirement of this contract, the following shall not be considered Government Property:
(1) the vessel;
(2) the equipment on the vessel;
(3) movable stores; and
(4) other material on the vessel
HQ C-2-0007 APPROVAL BY THE GOVERNMENT (AT) (NAVSEA) (JAN 1983)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
HQ C-2-0008 ASSIGNMENT AND USE OF NATIONAL STOCK NUMBERS (NAVSEA) (MAY 1993)
To the extent that National Stock Numbers (NSNs) or preliminary NSNs are assigned by the Government for the identification of parts, pieces, items, subassemblies or assemblies to be furnished under this contract, the Contractor shall use such NSNs or preliminary NSNs in the preparation of provisioning lists, package labels, packing lists, shipping containers and shipping documents as required by applicable specifications, standards or Data item Descriptions of the contract or as required by orders for spare and repair parts. The cognizant Government Contract Administration Office shall be responsible for providing the Contractor such NSNs or preliminary NSNs which may be assigned and which are not already in possession of the Contractor.
HQ C-2-0009 ASSIGNMENT OF SERIAL NUMBER(S) (NAVSEA) (SEP 1990)
The Contractor shall request serial number assignment, in writing, from the Cognizant Technical Program Office, with a copy to the cognizant Contract Administration Office. The request for serial number assignment shall contain the following minimum information:
(a) Contract number;
(b) Assigned line item number and description;
(c) Assigned type designation;
(d) Assigned model number;
(e) Top drawing number and ID (List of Drawings) number;
(f) Exact quantity for which serial numbers are being requested, including preproduction samples required by the contract; and
(g) National Stock Number
HQ C-2-0011 COMPUTER SOFTWARE AND/OR COMPUTER DATABASE(S) DELIVERED TO AND/OR
RECEIVED FROM THE GOVERNMENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.