Responses to Questions August 22, 2018

Q; Will the new drawings need to be stamped by a PE?

A; Yes (Only question 1 pertains to us, PE Stamp)

Paragraph 3.2 and the Statement of Work requires this.

3.2. Wireless system design (via Magnetek) schematics and wireless drawings showing full compatibility with the currently installed Magnatek electrical system. The modified drawings shall be stamped by a Professional Engineer (PE).

Q; We did not see a pricing page?

A; None was provided.

Q; Can you please confirm the bid due date and time.

A; Quotations must be submitted via email by 1:00pm Pacific Standard Time on August 25, 2018

Q; We are assuming an e-mail bid is acceptable.

A; Yes.