This document is a Pre-Proposal Inquiry (PPI) Response form for a Naval Facilities Engineering Command (NAVFAC) Environmental Restoration Architect-Engineering IDIQ contract (Solicitation N4425525R2001). The document contains government responses to vendor questions about proposal submission requirements, specifically addressing issues related to team subcontractor project evaluations, key personnel resume submissions, and SF330 submission procedures. Key clarifications include: projects performed by first-tier team subcontractors can be included in Section F project evaluations, PIEE module will be used for SF330 submissions, and only completed projects (maximum of 5) should be included on key personnel resumes. The responses are part of Amendment 2 to the solicitation, with questions and responses dated between 4/7/2025 and 4/11/2025, helping potential offerors understand specific submission guidelines for this small business set-aside contract valued at up to $45 million for environmental restoration services primarily in Washington and Alaska.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF330.pdf | ||
| PIEE Vendor Access Instructions.pdf | ||
| Synopsis 25R2001_Amendment 02.pdf | ||
| Synopsis 25R2001_Amendment 01.pdf | ||
| PPI Responses N4425525R2001_4-4-25.pdf | ||
| Attachment A_Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmental Restoration N44255‐25‐R‐2001 11‐Apr‐25
NAVFAC
PPI #
PRE-PROPOSAL INQUIRY GOVERNMENT RESPONSE Date
Received Amendment number
17 When proposing as a Prime (single firm or JV partners) with named Team Subcontractors, will projects performed by a Team Subcontractor be equally weighted as the projects performed by the Prime (or JV partners) in the Government’s evaluation of Criterion 1? Such projects would be submitted to best illustrate the overall team’s experience (both Prime contractor and Team subcontractor), when the subcontractor will provide meaningful involvement and significant value to the Navy
Please see response NAVFAC PPI#11 4/7/2025 2
18 1. Please confirm that projects performed by a proposed first-tier team subcontractor (not a JV member firm) can be included in Section F projects for evaluation. More specifically, these are completed projects performed by a subcontractor with or without the participation of the JV prime contractor or a sole prime contractor responding to this synopsis.
2. Please confirm that Section E resumes can include qualified proposed first-tier team subcontractor staff in the key personnel positions described in the synopsis
1. USG concurs as stated in Criterion 1, submission requirements.
2. USG confirm this statement
4/7/2025 2
19 Is the PIEE module the mode for submitting SF330s USG revises response to PPI#16 of the synopsis, to add PIEE SF330 submision directions instead of email and DoD Safe submiision as states in amendment 02
4/10/2025 2
20 Criterion 2 - Professional Qualifications and Technical Competence: Please confirm ongoing and completed projects are acceptable experience on key personnel resumes.
Per submission requirememt listed in Criterion 2, "each resume shall include a maximum of 5 specific completed projects." Please only provide completed projects per that statement
4/11/2025 2
21 Can we submit resumes for backup key resources as part of our SF330 response?
Evaluation will only be made for the key personnel.