This modification amends a solicitation for a multiple award construction contract to incorporate an attachment answering pre-proposal inquiry questions. The solicitation is identified as N44255-18-R-5003 issued by the Naval Facilities Engineering Command for a small business set-aside multiple award construction contract to provide services at the agency. The modification adds Attachment A-1 containing a log with answers to questions 1 through 10 from offerors. The proposal due date is unchanged by this modification.

NAVFAC Northwest SDVOSB/HUBZone MACC N44255-18-R-5003 Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to SDVOSB/HUBZone Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Attachment_A.1-_N44255-18-R-5003_PPI_Log.pdf PDF
N44255-18-R-5003_Amendment_0003.pdf PDF
Attachment__A-1_N44255-18-R-5003_PPI_Log.pdf PDF
N44255-18-R-5003_Amendment_0002.pdf PDF
N44255-18-R-5003__Conformed_through_Amend._0002.pdf PDF
N4425518R5003_Conformed_through_0001.pdf PDF
Attachment_D_-Bid_Bond_Review_Checklist_Amendment_00001.docx DOCX document
Attachment_A.1-_N44255-18-R-5003_PPI_Log.pdf PDF
Attachment_C.1_PPQ_Construction_Experience.docx DOCX document
Solicitation_N44255-18-R-5003.pdf PDF
Attachment_B_Construction_and_Design_Experience_Data_Sheet.docx DOCX document
Attachment_C.2_PPQ_Design_Experience.docx DOCX document
Attachment_D_-Bid_Bond_Review_Checklist.docx DOCX document
Attachment_A_PPI_Form.doc DOC document
Attachment_E_-_Performance_Rating_Method_Compliance_Report_form.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5338766

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment to the SDVOSB/HUBZone MACC is to incorporate Attachment A-1 N44255-18-R-5003 PPI Log to section 00806. The PPI Log w ill answ er PPI questions 1-10. The proposal due date is NOT extended.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4425518R5003

X 9B. DATED (SEE ITEM 11)

28-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Apr-2019

CODE

NAVFAC NORTHWEST

1101 TAUTOG CIRCLE

SILVERDALE WA 98315-1101

N44255 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4425518R5003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SF-30 CONTINUATION PAGE

Summary of Changes Section 00806

ATTACHMENTS

ATTACHMENTS FOR SUBMISSION ARE PROVIDED IN SEPARATE DOCUMENTS LOCATED ON

THE ELECTRONIC SOLICITATION WEBSITE

List of Attachments:

Attachment A – Pre Proposal Inquiry (PPI) Form

Attachment A.1 - N44255-18-R-5003 PPI Log

Attachment B – Construction and Design Experience Data Sheet

Attachment C.1 Past Performance Questionnaire – Construction Experience

Attachment C.2 Past Performance Questionnaire – Design Experience

Attachment D- Bid Bond Review Checklist

Attachment E- Performance Rating Method Compliance Report Form

(End of Summary of Changes)