Attachment_E_-_Performance_Rating_Method_Compliance_Report_form.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
SDVOSB/HUBZone Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
N44255-18-R-5003
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains a Performance Rating Method Compliance Report template for comparing the proposed building design against the baseline design for an energy modeling project. It collects key inputs for the building envelope, electrical systems, lighting design, process loads, and mechanical systems. The template includes four pages gathering details on wall and roof construction, window specifications, lighting power density, occupancy sensors, HVAC descriptions, and a performance table comparing end uses and energy consumption between the proposed and baseline models.

The related federal contract opportunity is solicitation number N44255-18-R-5003 for a SDVOSB/HUBZone Multiple Award Construction Contract from the Department of the Navy Naval Facilities Engineering Command. No further details are provided on the required products or services for this construction MACC.

Attachment E

View the file

Other files for this federal contract opportunity

Other files attached to SDVOSB/HUBZone Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Attachment_A.1-_N44255-18-R-5003_PPI_Log.pdf PDF
N44255-18-R-5003_Amendment_0003.pdf PDF
Attachment__A-1_N44255-18-R-5003_PPI_Log.pdf PDF
N44255-18-R-5003_Amendment_0002.pdf PDF
N44255-18-R-5003__Conformed_through_Amend._0002.pdf PDF
Attachment_D_-Bid_Bond_Review_Checklist_Amendment_00001.docx DOCX document
Attachment_A.1-_N44255-18-R-5003_PPI_Log.pdf PDF
N4425518R5003-0001.pdf PDF
N4425518R5003_Conformed_through_0001.pdf PDF
Attachment_D_-Bid_Bond_Review_Checklist.docx DOCX document
Attachment_A_PPI_Form.doc DOC document
Attachment_C.1_PPQ_Construction_Experience.docx DOCX document
Solicitation_N44255-18-R-5003.pdf PDF
Attachment_B_Construction_and_Design_Experience_Data_Sheet.docx DOCX document
Attachment_C.2_PPQ_Design_Experience.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE RATING METHOD COMPLIANCE REPORT
Project Information
Project Name:
City:
Weather Data:
Climate Zone:
Date:
Energy Simulation Program Used:
Space Summary (all in square feet)
Area Classification:Conditioned Area:Unconditioned:Total:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Total000
Advisory Messages
Proposed BuildingBaseline BuildingDifference
Number of hours heating loads not met
Number of hours cooling loads not met
Number of errors
Description of differences between the budget building and proposed design not documented on other forms:

N/A Attached

PERFORMANCE RATING METHOD COMPLIANCE REPORT

Comparison of Proposed Design versus Baseline Design Energy Model Inputs:
Building ElementProposed Design InputBaseline Design Input
Envelope
Above-Grade Wall construction(s)
Below grade Wall construction
Roof construction
Exterior floor construction
Slab-on-grade construction
Window-to-gross wall ratio
Fenestration type(s)
- Assembly U-Factor
- Assembly SHGC
- Visual light transmittance
Shading devices (fixed or movable)
Other
Electrical Systems & Process Loads
Lighting design description
Lighting power density (W/sf)
Process Lighting
Occpancy sensor controls
Daylighting controls
Exterior lighting power (tradable)
Exterior lighting power (non-tradable)
Receptacle Loads (w/sf)
Elevators or escalators
Refrigeration equipment
Other process loads

PERFORMANCE RATING METHOD COMPLIANCE REPORT

Comparison of Proposed Design versus Baseline Design Energy Model Inputs:
Building ElementProposed Design InputBaseline Design Input
Mechanical & Plumbing Systems
HVAC System Description: Include a general description of the HVAC system and system type.
Air-Side Description: Include relevant information such as SA temperature controls, fan control and economizer usage.

Heating System Description: Include relevant information such as the number of boilers and their efficiency, HW supply temperature and temperature reset, pump control, etc.

Cooling System Description: Include relevant information such as type of system, quantity of equipment, CHW/CW loop supply temperature and temperature reset, etc.

Service Water System Description: Include relevant information such as system type, supply temperature, capacity, thermal efficiency, etc.

Attachment F
PERFORMANCE RATING METHOD COMPLIANCE REPORT
Performance and Rating Table - Energy Summary by End Use
Proposed DesignBaseline Model
End UseEnergy TypeEnergy (kBtu/hr)Energy (kBtu/hr)
Interior lightingElectricity
Exterior lightingElectricity
Space heatingElectricity
Natural Gas
Space coolingElectricity
PumpsElectricity
Heat rejectionElectricity
FansElectricity
Service water heating (DHW)Electricity
Natural Gas
Receptacle equipmentElectricity
RefrigerationElectricity
Elevators & escalatorsElectricity
Other Process loadsElectricity
Total Building Consumption

Proposed Design Baseline Model EPAct Energy Reduction %

TypeEnergy Use
(kBtu)Energy Use

(kBtu)

Nonrenewable
Electricity
Natural Gas
Steam or Hot water
Chilled Water
Other
Total Nonrenewable
Proposed DesignBaseline ModelEPAct Energy

Reduction %

Exceptional Calculation Method Savings (savings indicated as negative numbers)Energy Use
(kBtu)Energy Use

(kBtu)

Site-generated renewables (REC)
Total including exceptional calculations
EPAct Energy Reduction* =

[(Baseline w/o Process) - (Proposed w/o Process)] / (Baseline w/o Process)

* Note: Calculation is different from LEED EA credit for percent improvement calculation.

File details come from the government source that posted it. Updated .