This is Amendment 0001 to a solicitation for repairs and renovations to Building 3918 at MCAS Cherry Point, North Carolina, to relocate the USMC Post Office. The amendment is issued by CG MCAS Cherry Point Facilities, ROICC, with an effective date of July 7, 2026.
The amendment extends the proposal due date from July 7, 2026, at 12:00 PM to July 15, 2026, at 12:00 PM local time. It addresses Pre-Award Inquiries (PPIs) that have been submitted, acknowledging that outstanding PPIs will be answered in a forthcoming amendment. The amendment updates the price proposal form and includes a Class Justification and Approval (J&A) document (ML-25-03) authorizing the use of JCI Metasys branded facilities-related control systems equipment. The solicitation includes two Contract Line Items: CLIN 0001 for Building 3918 renovation and Building 153 demolition work, and CLIN 0002 for Furniture, Fixtures, and Equipment (FF&E) procurement with a Government FF&E estimate of $125,568.00 and a not-to-exceed Handling and Administrative Requirements (HAR) markup of 5 percent. The project scope encompasses comprehensive building renovation including mechanical, electrical, plumbing, fire suppression, communications, and interior finishes work, along with specialized equipment relocation such as walk-in coolers and postal lockers. The amendment also indicates that the project duration may be extended by 90 days, bringing the total timeline to approximately 530 calendar days after award. Offerors must acknowledge receipt of this amendment with their proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7413945 Amendment 0004.pdf | ||
| 7413945 Amendment 0004.pdf | ||
| 7413945 Amendment 0003.pdf | ||
| 7413945 Amendment 0002.pdf | ||
| JandA ML 25 03 Class FRCS Cherry Point Redacted.pdf | ||
| 7413945 UPDATED PRICE PROPOSAL FORM.pdf | ||
| 7413945 RFP.pdf | ||
| 7413945 SpecsAsOne.pdf | ||
| 7413945 DrawingsAsOne.pdf | ||
| 7413945 Master PPI Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 07/07/2026 7413945
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION Repairs to Building 3918 to Relocate USMC
Post Office
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7413945 Repairs to Building 3918 to Relocate USMC Post Office, Cherry Point, NC
Amendment 0001 is being issued to answer PPIs, update the price proposal form, and provide a J&A.
The deadline to submit PPIs HAS EXPIRED.
The proposal due date of 07 July 2026 at 12:00 PM local time HAS BEEN EXTENDED to 15 July 2026 at 12:00 PM.
The Government acknowledges outstanding PPIs. These will be answered on a forthcoming amendment.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
PREAWARD INQUIRY FORM
PAGE SECTION PARAGRAPH
1 6/16/2026 Will the amendments from the previous RFP for this project be incorporated?
Yes - Please see list on PPI Master Form that addresses all nine original amendments / all prior RFIs.
2 6/24/2025 Is the FF&E Package to be an option and will there be a price form for that? What are we to provide in terms of the FF&E items?
Yes - Current RFP has proper bid form reflecting FF&E package.
3 6/20/2025 Wall detail sheet A501 note 2 states drywall to be type x, moisture resistant, absue resistant. There is a big difference in durability and price for each three of these types of sheetrocks.
The intent is to provide a single product with all three of these qualities.
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
4 6/20/2025 Wall detail sheet A501 note 4 states drywall to be type x, glass matt covered. There is a bigger difference for these two types of sheetrock.
Note 4 is referencing gypsum sheathing, which does not apply to this project. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments
(MBFA)
5 6/20/2025 Can the temp walls be framed with metal studs in lieu of wood?
We take no exception to metal stud in lieu of wood. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments
(MBFA).
6 6/20/2025 Assuming moisture resistant would go on bathroom or wet location ceilings, can the actual gypsum product needed for the walls and remaining ceiling be provided?
Per keynote 2, all gypsum board is to be type x, moisture resistant, and abuse resistant in all locations unless otherwise noted. Specific products cannot be provided. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
7 6/20/2025 The finish schedule calls for the ceiling grid to be interlude 9/16" with a fine fissured square lay in tile. Square lay in tiles require a 15/16" grid. Please confirm the grid or tile on the finish schedule.
We have updated the finish legend and spec to specify an acoustical ceiling tile to fit with a 9/16" grid profile.
8 6/24/2025 Please provide the model number of the existing RTU to determine the cost of the adapter curb?
See NAVFAC Drawing No. 12913151. 0001
9 6/26/2025 Please provide as builts for the existing post office to be demolished.
Record Drawings provided. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
POSTED ON
AMENDMENT #PPI # REFERENCE QUESTION GOVERNMENT RESPONSEDATE
SUBMITTED
July 2011
AMENDMENT #PPI # QUESTION GOVERNMENT RESPONSE
10 6/26/2025 ECS Hazardous Materials report dated 12/18/2023 for building 3918. Figure 2 - Asbestos and Lead Sample Location Map: The project work area was not tested for asbestos or lead. The report says "No Access" for the area to receive renovations. Will another inspection take place in this area?
The report shows that 2 samples were taken in the project area but both tested negative for asbestos. No lead samples were taken within the project area, but one taken directly outside the project area (L-11) showed no lead detected.
There is a small room that was unable to be tested within the project area. I have attached a picture of the room they are referencing. Nothing stands out to me as a concern in that room.
We included the Lead/Asbestos spec just to be safe because lead was found in the adjacent mechanical room and across the hall from the project area. A second HAZMAT inspcection/report will not be provided. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
11 6/30/2025 In the Specs, Section 10 14 00.20 Page 2 Item 1.3. They ask for three (3) extra sign frames and blank plates for each sign type. That will add 21 more signs to a job that only has 30 signs total. How many of each sign type (frames and blank plates) do they actually want and for which sign types?
See paragraph 1.3 in spec section 10 14
00.20 Interior Signage. NAVFAC ID
has confirmed that extra end caps would be suitable based on the many variables for this project. (WID)
12 6/30/2025 Is a triple hat suitable for this project, or would it be prefered for a 2 or 3 man staff?
See paragraph 1.6.1.1 in spec section 01 45 00 Quality Control. The QC Manager may also serve as the SSHO.
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (FEAD).
13 6/30/2025 Will the demoed doors, frames, and hardware in Building 3918 be saved for property maintenance or recycled?
See paragraph 3.1.6 in spec section 02 41 01 Building Deconstruction. Shop-fabricated doors and frames are to be recylced. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments
(MBFA).
14 6/30/2025 Can a detail be provided on the concrete cut in for the underground plumbing?
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (CCE).
15 6/30/2025 Will the cut in need to be done after normal business hours? See 01 14 00 Work Restrictions for work hours. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (FEAD).
16 6/30/2025 Will the new location of the cooler require being recessed into the floor? If so, can a detail please be provided?
No recess into the floor is required.
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
17 6/30/2025 Is the existing cooler location recessed into the floor? If so, please provide detail to cut and patch.
The existing cooler is not recessed into the floor. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments
(MBFA).
18 6/30/2025 What is the excepted warranty of reinstallation of the existing cooler systems?
Reinstallation of existing cooler systems falls under the 1-year general contractors warranty. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
19 6/30/2025 Will the access control for the renovated space be tied into the existing building system, or will the post office need to be independent?
Access control ties into existing access control system. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments
(MBFA).
20 6/30/2025 Are as-built drawings of the fire sprinkler system available? As-built drawings of the fire sprinkler system are not available. Available information provided. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (JH).
21 6/30/2025 The area labeled "not in contract" does not appear to be seperated from the remainder of the space by a firewall, and is therefore part of the same building. Given this, is there any evidence to confirm that the fire alarm and mass notification system components that are being demolished are connected to a fire alarm control unit in the area outside of the contract?
Or that any devices in the "not in contract" area are connected to the panels to be demolished?
Extent of existing system to be demolished is based upon visual survey of existing notification appliance types, previous Commisary fire alarm system replacement project, and interface of the two existing systems. No additional confirmation is available. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (JH).
22 6/30/2025 Specification section 28 31 76 states that the existing building fire alarm system is by Notifier, but it does not specify that the new system must be by Notifier. Please confirm that the new fire alarm control panel can be by any manufacturer.
The new system must be compatible with and be capable of fully networking with the existing control panel serving the commisary. The existing to remain panel is by Notifier.
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
23 6/30/2025 Drawing C-103: Existing sewer, electric, and communications are all shown being removed outside of the limits of disturbance. Would you like us to demo lines to the limits of disturbance?
See NAVFAC Drawing No. 12913057.
NOTE: The limits of disturbance have been expanded to include all demolition work items.
24 7/1/2025 During the preBid Site Visit it was observed by a Sub- Contractor that the existing supervisory controller (NAE) at Building 3918 is past end of life for servicing and is no longer able to receive security patches. Please confirm replacement of NAE with new SNE-2200, and please include J&A ML-25- 03 with response.
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
25 7/1/2025 Specification indicates a HDPE plastic lockers required but it calls for pass through capability. This makes me think that they are talking about PO box type lockers. I do not know any mfg. that would make an HDPE PO box locker. PO box lockers are normally steel body with aluminum doors. Can they clarify if this is the case?
The PO Box lockers and Parcel lockers are metal finish MTL-1 as indicated on Interior Elevation drawing sheets I-202 & I-203 (NAVFAC Drawing No.
12913102). The Pharmacy Lockers in the Mall Corridor 175 are metal finish MTL-2 as indicated on Interiors elevation A1/I-203 (NAVFAC Drawing No. 12913103). See spec section 10 51 13.
26 7/1/2025 There is a group of 10 lockers in Work Room 205 that I would think would be what is specified. Can they clarify that is the case?
This is correct - Work Room 205 lockers are to be HDP-1 finish as indicated on Interiors drawing B3/I-203 (NAVFAC Drawing No. 12913103).
27 7/9/2025 The Recessed Mail Lockers and Parcel Lockers shown on drawings I-201, I-202, and I-203 are not addressed by either the Equipment Floor Plan on drawing QF101 nor the specifications. Are these items Contractor Furnished / Contractor Installed? Are they Government Furnished, Contractor Installed? Are they Government Furnished / Government Installed?
All lockers are to be Contractor Furnished / Contractor Installed.
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (WID).
28 7/9/2025 If they are to be either Contractor Furnished or Contractor Installed, it is requested specification guidance be provided.
Please see 10 51 13 Spec (WID). 0001
29 7/9/2025 During the preBid Site Visit it was observed that the walk-in coolers to be relocated per Construction Keynotes 5 and 6 on Drawing A-104 have been in service for an extended period.
They were provided by the Jeffreys Cabinet Company using equipment mfr. by the W.A. Brown & Son Company. Jeffreys has been out of business for some time. The W. A. Brown & Son Company was purchased on April 30, 2012 by Imperial Manufacturing. It is now doing business as Imperial-Brown. I was advised by Ms. Stacie Sewell that Imperial-Brown did not retain any files from the W.A. Brown & Son Company, nor does it provide any service to this old equipment. Ms. Sewell can be contacted 503-830-3274. Specification Section 110540-
1.3 required compliance with manufacturer's instructions, 110540-3.1.2.2 requires conformance to Manufacturer's standards, 110540-3.2 requires manufacturer's representative to provide advice and service, 110540-3.6.1 requires following manufacturer's procedures during start-up and testing, and to record manufacturer's recommending readings hourly. It is also noted that a warranty for the work to relocate the coolers cannot be provided. In the abscemce of any technical support from the original manufacturer, can specification guidance be provided for the unavailable items noted above?
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
30 7/9/2025 The cooler equipment is at least 13 plus years old based on the change of ownership. It is recommended that the MCX consider requiring new Walk-In Coolers which would come with a warranty. Phasing of the work could allow construction to be completed for the New Package Store area prior to taking the existing MCX Package Store out of operation. Can the requirement for new Walk-In Coolers be added to the
RFP?
This contract does not permit the purchase of new items for the use of selling merchandise. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
31 7/9/2025 During the preBid Site Visit it was observed there are no wire mesh partitions to connect to at the location of new Alcohol Storage Room 201. Will the new Wire Mesh Partition be required to be extended approximately 15'-8" to the masonry wall?
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments (MBFA).
32 7/9/2025 During the preBid Site Visit it was observed there are Pharmacy Lockers in service on both sides of Mall 175. The demolition of this are on drawing AD103 does not show or address either of the Pharmacy Lockers. With the Pharmacy Lockers be relocated out of the work area by others prior to the contractor beginning work?
Pharmacy lockers will be removed as a part of a separate project prior to the start of this project. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
33 6/16/2026 IAW MCAS CP FRCS Standardization for JCI Metasys branded products, please include "J&A ML-25-03 Class FRCS Cherry Point" within the next amendment. (attached)
J&A ML-25-03 Class FRCS Cherry Point is now included as a part of the specifications of this project.
34 6/16/2026 11 Price Proposal Form CLIN 0002 Can a revised Bid Form be provided with the Government's FF&E Estimate to allow for an accurate HAR calculation?
Please see updated Price Proposal sheet attached.
35 6/17/2026 M-602 Note 10 on the Rooftup Unit Heat Pump Schedule calls that the unit must not exceed 10% of the existing rooftop unit weight. Can the existing make and model number be provided?
Government to provide existing unit make and model #. Nameplate was worn and not legible. (CCE)
36 6/17/2026 M-602 Can you confirm the scheduled RTU weight of 1,156.4 lbs?
That weight appears low for the specified applied-style rooftop uni with double-wall construction and associated features, and is more indicative of a light commercial unit.
DOR confirms weight of BOD is approximately 1150lb. BOD unit is
WSK102A4. (CCE)
37 6/17/2026 M-602 RTU-1 basis of design is a catalog style unit. Schedule notes such as 2" double wall foamed construction, digital scroll compressor, SCR heat, and two filter typles are options found on semi-custom units. In order to meet the weight requirements of schedule note 10, the RTU would need to be a catalog style RTU. Are the RTU manufacturers supposed to meet the weight requirement with a catalog unit OR meet the specified options in the scheduled notes with a semi-custom unit? They cannot meet both.
BOD unit is confirmed as a catalog style unit, WSK102A4 (Trane).
Typical cabinet unit construction is acceptable. Staged electric heat is acceptable. Multiple staged scroll compressors are acceptable. Provide unit with 2" MERV 13 filtration.
(CCE)
38 6/12/2026 3 SPECS We do not see a table of contents in the specifications-only a "list of drawings" in the SPECS. Could you please provide a table of contents for B3918 Relocate USMC Post Office?
Table of Contents provided [MBFA] 0001
39 6/26/2026 I-202 The Parcel Locker Sections likely require 2-key Parcel Locker Locks for package retention instead of standard keyed locks used for tenant mail. Can it be confirmed by Amendment whether or not the Government needs 2-Key Parcel Locker Locks in the Parcel Locker Sections (I-202 B1, B3, C1 C3)? If so, providing different series of mailboxes that will accommodate Parcel Locker Locks will change the layout for those spaces and would also have a slightly different look than indicated on the RFP Drawings. Will a change in the box layout also be acceptable if 2-Key Parcel Locker Locks will be required for required Parcel Lockers?
Yes, if the Govt. requires 2 key locks, an updated layout is acceptable as long as is doesn’t greatly reduce the number of lockers. (WID)
40 6/26/2026 1 of 11 RFP The project RFP states that all work shall be completed within 440 calendar days after award. Can 90 Days be added to the Project Duration by Amendment to allow for scheduling and completion of the required work?
Yes. 90 days may be added to project duration.
Renovate B3918 Relocate Post Office Station Project No. 7413945 MCAS Cherry Point 15 April 2025
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/24 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS
01 20 00 11/20, CHG 4: 08/24 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 08/23 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM (eCMS)
01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS
SCHEDULES
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 30.00 22 02/16 GIS DATA DELIVERABLES
01 80 00 04/15 REPORTS
01 91 00.15 05/23, CHG 2: 11/23 BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 41 01 08/22 BUILDING DECONSTRUCTION
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 6: 11/23 CAST-IN-PLACE CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
PROJECT TABLE OF CONTENTS Page 1
HAZARDOUS MATERIALS SURVEY - BLDG 3918
HAZARDOUS MATERIALS SURVEY - BLDG 153
SUBMITTAL REGISTER
(CIVIL WORK)
SCHEDULE OF FIRE PROTECTION SYSTEM
INSPECTIONS BY FPQC SPECIALIST
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 84 00.00 22 09/23 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 33 23 08/20, CHG 1: 02/22 STEEL OVERHEAD COILING DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 67 23.13 27SEP2018 STANDARD RESINOUS FLOORING
09 72 00 08/17, CHG 1: 08/18 DIGITALLY PRINTED WALL GRAPHICS
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 08/24 LOCKERS
DIVISION 11 - EQUIPMENT
11 05 40 08/17, CHG 1: 02/18 COMMON WORK RESULTS FOR RELOCATING
FOODSERVICE EQUIPMENT
11 13 30 02/25 TOP OF GROUND DOCK LIFT
DIVISION 12 - FURNISHINGS
12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGE
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
PROJECT TABLE OF CONTENTS Page 2
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
22 00 00 05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93.00 22 09/19 TESTING, ADJUSTING, AND BALANCING FOR
MECHANICAL SYSTEMS
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13.00 22 08/20, CHG 1: 03/22 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 17 23.16 11/24 ROAD AND PARKING LOT PAVEMENT MARKINGS
32 92 23 04/06, CHG 1: 08/21 SODDING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
DIVISION 22 - PLUMBING
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 4
PRICE PROPOSAL FORM
DOCUMENT 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following for Project N442487413945 Repairs to Building 3918 to Relocate USMC Post Office
CLIN 0001.
CLIN DESCRIPTION PRICE FOR CLIN
0001AA Price for the entire work associated with Building 3918 Renovation, in accordance with drawings, specifications, and RFP documents, but excluding work described in all other specified Contract Line Items (CLIN).
0001AB Price for the entire work associated with Building 153 Demolition, in accordance with drawings, specifications, and RFP documents, but excluding work described in all other specified CLINs.
Total Price for CLIN 0001:
CLIN 0002 – PLANNED MODIFICATION. Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the RFP and in accordance with the following schedule:
CLIN ITEM GOVT FF&E
ESTIMATE
HAR (NTE
5%)
HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR %)
TOTAL FF&E
ESTIMATED
AMOUNT
FOR CLIN
(GOVT FF&E
ESTIMATE +
HAR
AMOUNT)
0002 FF&E $125,568.00 ___ % $___________ $___________
By submission of this proposal, I confirm that it includes the JCI system specified in the redacted Justification and Approval included with the specifications. __________ (initial here)
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items (CLINs) 0001-0002.
b. The Government may reject an offer as nonresponsive if it is materially unbalanced. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
c. See Division 12 – Furnishings for additional information regarding CLIN 0002.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.