This is a specifications document for repairs to Building 3918 at a Naval Facilities Engineering Command location to accommodate the relocation of a USMC Post Office. The procurement is restricted to General MACC contractors only, with eligible contractors identified on the RFP cover letter. The scope of work encompasses building modifications and renovations necessary to prepare the facility for post office operations, with detailed specifications and applicable construction drawings provided in the solicitation package.

The solicitation (N442487413945) is issued by the Department of the Navy Naval Facilities Engineering Command and requires qualified General MACC contractors to submit proposals based on the specifications, drawings, and scope of work outlined in the RFP. Contractors must reference the cover letter for the complete list of eligible General MACC contractors authorized to bid on this restricted competition. The project involves structural and operational modifications to Building 3918 to support the relocation and operation of USMC Post Office functions.

View the file

Other files

File Type Posted
7413945 Amendment 0004.pdf PDF
7413945 Amendment 0004.pdf PDF
7413945 Amendment 0003.pdf PDF
7413945 Amendment 0002.pdf PDF
JandA ML 25 03 Class FRCS Cherry Point Redacted.pdf PDF
7413945 Amendment 0001.pdf PDF
7413945 UPDATED PRICE PROPOSAL FORM.pdf PDF
7413945 RFP.pdf PDF
7413945 DrawingsAsOne.pdf PDF
7413945 Master PPI Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15 April 2025

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, MID-ATLANTIC

MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA

RENOVATE B3918 RELOCATE POST OFFICE

AT THE

MARINE CORPS AIR STATION

CHERRY POINT, NORTH CAROLINA

STATION PROJECT NO: 7413945

DESIGNED BY:

MBF ARCHITECTS, PA

317-C POLLOCK STREET

NEW BERN, NORTH CAROLINA 28560

SPECIFICATION PREPARED BY:

DARDEN J. EURE, III, MBF ARCHITECTS

15 APRIL 2025

SPECIFICATION APPROVED BY:

Design Director: _____________________________________________

PATRICK FAULKNER, PE

Date: ___________________

This page is intentionally left blank.

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/24

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

NAVFAC DWG

NO NO SHEET TITLE

G GENERAL

12913050 G-001 TITLE SHEET

12913051 G-002 INDEX OF DRAWINGS

GI LIFE SAFETY

12913052 GI001 LIFE SAFETY NOTES AND LEGEND

12913053 GI101 LIFE SAFETY FIRST FLOOR PLAN

C CIVIL

12913054 C-100 OVERALL SITE PLAN

12913055 C-101 ENLARGED SITE PLAN - EXISTING CONDITIONS AND DEMOLITION

12913056 C-102 ENLARGED SITE PLAN - NEW WORK

12913057 C-103 ENLARGED SITE PLAN - EXISTING CONDITIONS AND DEMOLITION

12913058 C-104 ENLARGED SITE GRADING PLAN

12913059 C-501 DETAILS

12913060 C-502 DETAILS

A ARCHITECTURAL

12913061 A-001 SYMBOLS AND ABBREVIATIONS

12913062 AD101 FLOOR PLAN - EXISTING/DEMOLITION - OVERALL

12913063 AD102 FLOOR PLAN - EXISTING/DEMOLITION - AREA B

12913064 AD103 FLOOR PLAN - EXISTING/DEMOLITION - AREAS G&H

12913065 AD104 REFLECTED CEILING PLAN - EXISTING/DEMOLITION - OVERALL

12913066 AD105 REFLECTED CEILING PLAN - EXISTING/DEMOLITION - AREAS G&H

12913067 AD106 REFLECTED CEILING PLAN - EXISTING/DEMOLITION - AREA H

12913068 AD201 EXTERIOR ELEVATIONS - EXTERIOR/DEMOLITION

12913069 A-101 FLOOR PLAN - CONSTRUCTION - OVERALL

12913070 A-102 FLOOR PLAN - CONSTRUCTION - AREA A

12913071 A-103 FLOOR PLAN - CONSTRUCTION - AREA B

12913072 A-104 FLOOR PLAN - CONSTRUCTION - AREAS G&H

12913073 A-105 REFLECTED CEILING PLAN - CONSTRUCTION - OVERALL

12913074 A-106 REFLECTED CEILING PLAN - CONSTRUCTION - AREA A

12913075 A-107 REFLECTED CEILING PLAN - CONSTRUCTION - AREAS G&H

12913076 A-108 REFLECTED CEILING PLAN - CONSTRUCTION - AREA H

12913077 A-109 ROOF PLAN - CONSTRUCTION - AREAS G&H

12913078 A-201 EXTERIOR ELEVATIONS - CONSTRUCTION

12913079 A-401 ENLARGED TOILET PLANS AND ELEVATIONS

12913080 A-402 ENLARGED TOILET ELEVATIONS AND DETAILS

12913081 A-403 INTERIOR ELEVATIONS

Renovate B3918 Relocate Post Office MCAS Cherry Point

Station Project No. 7413945

REVISED 1 JUL 2025

NAVFAC DWG

NO NO SHEET

12913082 A-404 INTERIOR ELEVATIONS

12913083 A-405 EQUIPMENT ACCESS PLATFORM PLANS AND SECTIONS

12913084 A-501 WALL TYPES

12913085 A-502 WALL DETAILS

12913086 A-503 INTERIOR DETAILS

12913087 A-504 EXTERIOR DETAILS

12913088 A-505 MISCELLANIOUS DETAILS

12913089 A-601 DOOR SCHEDULE AND DETAILS

12913090 A-602 DOOR DETAILS

12913091 A-603 DOOR DETAILS

12913092 A-604 DOOR DETAILS

12913093 A-901 RATED WALL TYPICAL CONDITIONS

QF EQUIPMENT

12913094 QF101 EQUIPMENT PLAN

I INTERIOR DESIGN

12913095 I-101 FURNITURE PLAN - AREA A

12913096 I-102 FURNITURE PLAN - AREA G&H

12913097 I-111 FINISH PLAN - AREA A

12913098 I-112 FINISH PLAN - AREA G&H

12913099 I-121 SIGNAGE PLAN - AREA A

12913100 I-122 SIGNAGE PLAN - AREA G&H

12913101 I-201 INTERIOR ELEVATIONS

12913102 I-202 INTERIOR ELEVATIONS

12913103 I-203 INTERIOR ELEVATIONS

12913104 I-301 CASEWORK SECTIONS

12913105 I-302 CASEWORK SECTIONS

12913106 I-401 ENLARGED PLAN VIEWS

12913107 I-501 SIGNAGE DETAILS

12913108 I-502 INTERIOR DETAILS

12913109 I-601 SCHEDULES & LEGENDS

F FIRE PROTECTION

12913110 FD001 FIRE PROTECTION DEMOLITION NOTES AND LEGEND

12913111 FD101 FIRE PROTECTION DEMOLITION PLAN - AREA A

12913112 FD102 FIRE PROTECTION DEMOLITION PLAN - AREA B

12913113 FD103 FIRE PROTECTION DEMOLITION PLAN - AREA C

12913114 FD104 FIRE PROTECTION DEMOLITION PLAN - AREA D

12913115 FD105 FIRE PROTECTION DEMOLITION PLAN - AREA E

12913116 FD106 FIRE PROTECTION DEMOLITION PLAN - AREA F

12913117 FD107 FIRE PROTECTION DEMOLITION PLAN - AREA G

12913118 FD108 FIRE PROTECTION DEMOLITION PLAN - AREA H

12913119 FA001 FIRE ALARM NOTES AND LEGEND

12913120 FA101 FIRE ALARM FLOOR PLAN - AREA A

12913121 FA102 FIRE ALARM FLOOR PLAN - AREA B

12913122 FA103 FIRE ALARM FLOOR PLAN - AREA C

12913123 FA104 FIRE ALARM FLOOR PLAN - AREA D

12913124 FA105 FIRE ALARM FLOOR PLAN - AREA E

12913125 FA106 FIRE ALARM FLOOR PLAN - AREA F

12913126 FA107 FIRE ALARM FLOOR PLAN - AREA G

12913127 FA108 FIRE ALARM FLOOR PLAN - AREA H

12913128 FA501 FIRE ALARM DETAILS

12913129 FX001 FIRE SPRINKLER NOTES AND LEGEND

12913130 FX002 FIRE SPRINKLER FLOOR PLAN - OVERALL

12913131 FX101 FIRE SPRINKLER FLOOR PLAN - AREA G

Renovate B3918 Relocate Post Office MCAS Cherry Point

Station Project No. 7413945

12913132 FX102 FIRE SPRINKLER FLOOR PLAN - AREA H

P PLUMBING

12913133 P-001 PLUMBING COVER SHEET

12913134 PD101 FIRST FLOOR PLAN - DEMOLITION - PLUMBING

12913135 P-101 FIRST FLOOR PLAN - WASTE AND VENT

12913136 P-102 FIRST FLOOR PLAN - WATER

12913137 P-201 ENLARGED PLANS - PLUMBING

12913138 P-501 PLUMBING DETAILS

12913139 P-601 PLUMBING SCHEDULES

12913140 P-701 RISER DIAGRAMS - PLUMBING

M MECHANICAL

12913141 M-001 MECHANICAL COVER SHEET

12913142 MD101 FIRST FLOOR - DEMOLITION - DUCTWORK

12913143 MD102 ROOF - DEMOLITION - EQUIPMENT

12913144 MD301 MECHANICAL SECTION VIEWS - DEMOLITION

12913145 M-101 FIRST FLOOR - CONSTRUCTION - MECHANICAL

12913146 M-102 ROOF - NEW WORK

12913147 M-501 MECHANICAL DETAILS

12913148 M-502 MECHANICAL DETAILS

12913149 M-503 MECHANICAL DETAILS

12913150 M-504 MECHANICAL DETAILS

12913151 M-505 MECHANICAL DETAILS

12913152 M-601 MECHANICAL SCHEDULES

12913153 M-602 MECHANICAL SCHEDULES

12913154 M-701 MECHANICAL CONTROLS

12913155 M-702 MECHANICAL CONTROLS

12913156 M-703 MECHANICAL CONTROLS

E ELECTRICAL

12913157 E-001 ELECTRICAL NOTES AND LEGENDS

12913158 ED101 FLOOR PLAN - POWER DEMOLITION

12913159 ED102 FLOOR PLAN - EQUIPMENT CONNECTIONS DEMOLITION

12913160 ED103 FLOOR PLAN - LIGHTING DEMOLITION

12913161 E-101 FLOOR PLAN - POWER

12913162 E-102 FLOOR PLAN - EQUIPMENT CONNECTIONS

12913163 E-103 FLOOR PLAN - LIGHTING

12913164 E-401 ENLARGED FLOOR PLAN - POWER

12913165 E-501 ELECTRICAL DETAILS

12913166 E-502 ELECTRICAL DETAILS

12913167 E-503 ELECTRICAL DETAILS

12913168 E-601 ELECTRICAL SCHEDULES

12913169 E-602 ELECTRICAL SCHEDULES

12913170 E-603 ELECTRICAL SCHEDULES

12913171 E-604 ELECTRICAL SCHEDULES

12913172 E-701 ELECTRICAL RISER DIAGRAM

T TELECOMMUNICATIONS

12913173 T-001 TELECOMMUNICATIONS NOTES AND LEGENDS

12913174 TD101 FLOOR PLAN - TELECOMMUNICATIONS DEMOLITION

12913175 T-101 FLOOR PLAN - TELECOMMUNICATIONS

12913176 T-102 FLOOR PLAN - SECURITY INFRASTRUCTURE

12913177 T-401 ENLARGED FLOOR PLAN - TELECOMMUNICATIONS

12913178 T-501 TELECOMMUNICATIONS DETAILS

12913179 T-502 TELECOMMUNICATIONS DETAILS

Renovate B3918 Relocate Post Office MCAS Cherry Point

Station Project No. 7413945

12913180 T-503 TELECOMMUNICATIONS DETAILS

1.2.1 Reference Drawing[s]

The following reference drawings are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract.

1174C

4866 SKETCH OF PROPOSED CONCRETE SIDEWALK AND CRUSHED STONE PARKING AREA

NEAR POST OFFICE

1029 PLANTING PLAN

1093 POST OFFICE NEW PARTITIONS, COUNTER, ETC

3877 AIR CONDITION OF POSTAL OFFICERS OFFICE

6885 BUILDING 153 FLOOR PLAN

2193 PROPOSED POST OFFICE PARKING AREA

2243 PROPOSED POST OFFICE PARKING AREA

3689 AIR CONDITION OF STATION POST OFFICE

219696 PLANS & ELEVATIONS

219697 DETAILS

219698 TYPICAL DETAILS

219699 TYPICAL DETAILS

219702 PLANS & ELEVATIONS ELEC. HEAT. PLUMBING

300862 WATER AND SANITARY SEWER

301104 SITE PLAN POST OFFICE

301120 REVISION SHEET

344872 PLANS & SECTION

344873 ELEVATIONS & STRUCTURAL DETAILS

344874 EXTERIOR & INTERIOR DETAILS

344875 PLUMBING HEATING AND ELECTRIC

428058 HEATING

62617 PLANS AND DETAILS

3823 LOCATION PLAN

4959 EXTERIOR PAINTING OF VARIOUS BUILDINGS

4023699 VICINITY, LOCATION MAP, INDEX, AND LEGEND

4023700 STATION MAP, INDEX TO BUILDINGS, LOCATION OF WORK

4023718 INSTALL HEATING SYSTEM CONTROLS

4027233 LOCATION MAP

4027241 REPLACEMENT OF CONDENSATE PIPING

4027253 REPLACEMENT OF CONDENSATE PIPING

4038285 SECTIONS & DETAILS

4043443 PLANS & DETAILS

4046850 INDEX, LEGENDS, GEN NOTES & VICINITY MAP

4046879 ENERGY MONITORING & CONTROL SYSTEM

4087821 PLANS & SCHEDULE

4087822 PLAN & ELEVATIONS

4087823 DETAILS

4087830 INDEX TO DRAWINGS

4087833 DEMOLITION

4087894 DEMOLITION

4087836 NEW WORK

4087839 DETAILS & SCHEDULES

4087869 FLOOR PLAN

4094433 COVER SHEET

Renovate B3918 Relocate Post Office MCAS Cherry Point

Station Project No. 7413945

4094434 LOCATION MAP

4094435 EXISTING WINDOW TYPES

4094436 SOLAR SCREEN TYPES - DETAIL

4094437 WINDOWS AND SOLAR SCREENS SCHEDULE

4094438 WINDOWS AND SOLAR SCREENS SCHEDULE

4115573 COVER & TITLE SHEET

4115575 STRUCTURAL & MECHANICAL MODIFICATIONS TO B153

4115580 ELECTRICAL MODIFICATIONS B153

4131438 FLOOR PLAN & DETAILS

4134097 FIRE ALARM SYSTEM

4232079 REMOTE CYCLING OF WINDOW A/C UNITS

4292821 TITLE SHEET

4292822 ROOF PLAN

4292823 BUILDING ELEVATIONS

4292824 DETAILS

004316660 TITLE SHEET

004316661 MECHANICAL

004316662 DEMOLITION - MECHANICAL

004316663 RENOVATION - MECHANICAL

004316664 RENOVATION DETAILS

004316665 LEGEND AND SITE PLAN

004316666 ELECTRICAL DEMOLITION PLAN

004316667 ELECTRICAL RENOVATION PLAN, RISERS, AND SCHEDULES

4343469 SITE PLANS AND ASPHALT PAVEMENT QUANTITIES

4343474 COVER SHEET

4343475 FLOOR PLAN - DEMOLITION

4343476 ELEVATIONS - EXISTING

4343477 ELEVATIONS - DEMOLITION

4343478 ELEVATIONS - CONSTRUCTION

4343479 WINDOW SCHEDULE AND ELEVATION

4343480 DETAILS

4367248 RADIO CONTROLLED RECEIVER SWITCHING SCHEDULES

4524899 NEW WORK DRAWING NOTES

12830002 MECHANICAL DEMOLITION PLAN

12830003 MECHANICAL NEW WORK PLAN

-- End of Document --

Renovate B3918 Relocate Post Office MCAS Cherry Point

Station Project No. 7413945

Renovate B3918 Relocate Post Office Station Project No. 7413945 MCAS Cherry Point 15 April 2025

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 4

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/24

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

NAVFAC DWG

NO NO SHEET TITLE

G GENERAL

12913050 G-001 TITLE SHEET

12913051 G-002 INDEX OF DRAWINGS

GI LIFE SAFETY

12913052 GI001 LIFE SAFETY NOTES AND LEGEND

12913053 GI101 LIFE SAFETY FIRST FLOOR PLAN

C CIVIL

12913054 C-100 OVERALL SITE PLAN

12913055 C-101 ENLARGED SITE PLAN - EXISTING CONDITIONS AND DEMOLITION

12913056 C-102 ENLARGED SITE PLAN - NEW WORK

12913057 C-103 ENLARGED SITE PLAN - EXISTING CONDITIONS AND DEMOLITION

12913058 C-104 ENLARGED SITE GRADING PLAN

12913059 C-501 DETAILS

12913060 C-502 DETAILS

A ARCHITECTURAL

12913061 A-001 SYMBOLS AND ABBREVIATIONS

12913062 AD101 FLOOR PLAN - EXISTING/DEMOLITION - OVERALL

12913063 AD102 FLOOR PLAN - EXISTING/DEMOLITION - AREA B

12913064 AD103 FLOOR PLAN - EXISTING/DEMOLITION - AREAS G&H

12913065 AD104 REFLECTED CEILING PLAN - EXISTING/DEMOLITION - OVERALL

12913066 AD105 REFLECTED CEILING PLAN - EXISTING/DEMOLITION - AREAS G&H

12913067 AD106 REFLECTED CEILING PLAN - EXISTING/DEMOLITION - AREA H

12913068 AD201 EXTERIOR ELEVATIONS - EXTERIOR/DEMOLITION

12913069 A-101 FLOOR PLAN - CONSTRUCTION - OVERALL

12913070 A-102 FLOOR PLAN - CONSTRUCTION - AREA A

12913071 A-103 FLOOR PLAN - CONSTRUCTION - AREA B

12913072 A-104 FLOOR PLAN - CONSTRUCTION - AREAS G&H

12913073 A-105 REFLECTED CEILING PLAN - CONSTRUCTION - OVERALL

12913074 A-106 REFLECTED CEILING PLAN - CONSTRUCTION - AREA A

12913075 A-107 REFLECTED CEILING PLAN - CONSTRUCTION - AREAS G&H

12913076 A-108 REFLECTED CEILING PLAN - CONSTRUCTION - AREA H

12913077 A-109 ROOF PLAN - CONSTRUCTION - AREAS G&H

12913078 A-201 EXTERIOR ELEVATIONS - CONSTRUCTION

12913079 A-401 ENLARGED TOILET PLANS AND ELEVATIONS

12913080 A-402 ENLARGED TOILET ELEVATIONS AND DETAILS

12913081 A-403 INTERIOR ELEVATIONS

12913082 A-404 INTERIOR ELEVATIONS

DOCUMENT 00 01 15 Page 1

NAVFAC DWG

NO NO SHEET TITLE

12913083 A-405 EQUIPMENT ACCESS PLATFORM PLANS AND SECTIONS

12913084 A-501 WALL TYPES

12913085 A-502 WALL DETAILS

12913086 A-503 INTERIOR DETAILS

12913087 A-504 EXTERIOR DETAILS

12913088 A-505 MISCELLANIOUS DETAILS

12913089 A-601 DOOR SCHEDULE AND DETAILS

12913090 A-602 DOOR DETAILS

12913091 A-603 DOOR DETAILS

12913092 A-604 DOOR DETAILS

12913093 A-901 RATED WALL TYPICAL CONDITIONS

QF EQUIPMENT

12913094 QF101 EQUIPMENT PLAN

I INTERIOR DESIGN

12913095 I-101 FURNITURE PLAN - AREA A

12913096 I-102 FURNITURE PLAN - AREA G&H

12913097 I-111 FINISH PLAN - AREA A

12913098 I-112 FINISH PLAN - AREA G&H

12913099 I-121 SIGNAGE PLAN - AREA A

12913100 I-122 SIGNAGE PLAN - AREA G&H

12913101 I-201 INTERIOR ELEVATIONS

12913102 I-202 INTERIOR ELEVATIONS

12913103 I-203 INTERIOR ELEVATIONS

12913104 I-301 CASEWORK SECTIONS

12913105 I-302 CASEWORK SECTIONS

12913106 I-401 ENLARGED PLAN VIEWS

12913107 I-501 SIGNAGE DETAILS

12913108 I-502 INTERIOR DETAILS

12913109 I-601 SCHEDULES & LEGENDS

F FIRE PROTECTION

12913110 FD001 FIRE PROTECTION DEMOLITION NOTES AND LEGEND

12913111 FD101 FIRE PROTECTION DEMOLITION PLAN - AREA A

12913112 FD102 FIRE PROTECTION DEMOLITION PLAN - AREA B

12913113 FD103 FIRE PROTECTION DEMOLITION PLAN - AREA C

12913114 FD104 FIRE PROTECTION DEMOLITION PLAN - AREA D

12913115 FD105 FIRE PROTECTION DEMOLITION PLAN - AREA E

12913116 FD106 FIRE PROTECTION DEMOLITION PLAN - AREA F

12913117 FD107 FIRE PROTECTION DEMOLITION PLAN - AREA G

12913118 FD108 FIRE PROTECTION DEMOLITION PLAN - AREA H

12913119 FA001 FIRE ALARM NOTES AND LEGEND

12913120 FA101 FIRE ALARM FLOOR PLAN - AREA A

12913121 FA102 FIRE ALARM FLOOR PLAN - AREA B

12913122 FA103 FIRE ALARM FLOOR PLAN - AREA C

12913123 FA104 FIRE ALARM FLOOR PLAN - AREA D

12913124 FA105 FIRE ALARM FLOOR PLAN - AREA E

12913125 FA106 FIRE ALARM FLOOR PLAN - AREA F

12913126 FA107 FIRE ALARM FLOOR PLAN - AREA G

12913127 FA108 FIRE ALARM FLOOR PLAN - AREA H

12913128 FA501 FIRE ALARM DETAILS

12913129 FX001 FIRE SPRINKLER NOTES AND LEGEND

12913130 FX002 FIRE SPRINKLER FLOOR PLAN - OVERALL

12913131 FX101 FIRE SPRINKLER FLOOR PLAN - AREA G

12913132 FX102 FIRE SPRINKLER FLOOR PLAN - AREA H

DOCUMENT 00 01 15 Page 2

NAVFAC DWG

NO NO SHEET TITLE

P PLUMBING

12913133 P-001 PLUMBING COVER SHEET

12913134 PD101 FIRST FLOOR PLAN - DEMOLITION - PLUMBING

12913135 P-101 FIRST FLOOR PLAN - WASTE AND VENT

12913136 P-102 FIRST FLOOR PLAN - WATER

12913137 P-201 ENLARGED PLANS - PLUMBING

12913138 P-501 PLUMBING DETAILS

12913139 P-601 PLUMBING SCHEDULES

12913140 P-701 RISER DIAGRAMS - PLUMBING

M MECHANICAL

12913141 M-001 MECHANICAL COVER SHEET

12913142 MD101 FIRST FLOOR - DEMOLITION - DUCTWORK

12913143 MD102 ROOF - DEMOLITION - EQUIPMENT

12913144 MD301 MECHANICAL SECTION VIEWS - DEMOLITION

12913145 M-101 FIRST FLOOR - CONSTRUCTION - MECHANICAL

12913146 M-102 ROOF - NEW WORK

12913147 M-501 MECHANICAL DETAILS

12913148 M-502 MECHANICAL DETAILS

12913149 M-503 MECHANICAL DETAILS

12913150 M-504 MECHANICAL DETAILS

12913151 M-505 MECHANICAL DETAILS

12913152 M-601 MECHANICAL SCHEDULES

12913153 M-602 MECHANICAL SCHEDULES

12913154 M-701 MECHANICAL CONTROLS

12913155 M-702 MECHANICAL CONTROLS

12913156 M-703 MECHANICAL CONTROLS

E ELECTRICAL

12913157 E-001 ELECTRICAL NOTES AND LEGENDS

12913158 ED101 FLOOR PLAN - POWER DEMOLITION

12913159 ED102 FLOOR PLAN - EQUIPMENT CONNECTIONS DEMOLITION

12913160 ED103 FLOOR PLAN - LIGHTING DEMOLITION

12913161 E-101 FLOOR PLAN - POWER

12913162 E-102 FLOOR PLAN - EQUIPMENT CONNECTIONS

12913163 E-103 FLOOR PLAN - LIGHTING

12913164 E-401 ENLARGED FLOOR PLAN - POWER

12913165 E-501 ELECTRICAL DETAILS

12913166 E-502 ELECTRICAL DETAILS

12913167 E-503 ELECTRICAL DETAILS

12913168 E-601 ELECTRICAL SCHEDULES

12913169 E-602 ELECTRICAL SCHEDULES

12913170 E-603 ELECTRICAL SCHEDULES

12913171 E-604 ELECTRICAL SCHEDULES

12913172 E-701 ELECTRICAL RISER DIAGRAM

T TELECOMMUNICATIONS

12913173 T-001 TELECOMMUNICATIONS NOTES AND LEGENDS

12913174 TD101 FLOOR PLAN - TELECOMMUNICATIONS DEMOLITION

12913175 T-101 FLOOR PLAN - TELECOMMUNICATIONS

12913176 T-102 FLOOR PLAN - SECURITY INFRASTRUCTURE

12913177 T-401 ENLARGED FLOOR PLAN - TELECOMMUNICATIONS

12913178 T-501 TELECOMMUNICATIONS DETAILS

12913179 T-502 TELECOMMUNICATIONS DETAILS

12913180 T-503 TELECOMMUNICATIONS DETAILS

-- End of Document --

DOCUMENT 00 01 15 Page 3

DOCUMENT 00 01 15 Page 4

SECTION 01 11 00

SUMMARY OF WORK

02/24

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes renovating B3918 to accommodate the MCAS Cherry Point Post Office and demolishing Building 153 and incidental related work.

1.1.2 Location

The work is located at MCAS Cherry Point, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.2 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.3 EXISTING WORK

Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.4 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole

SECTION 01 11 00 Page 1 or other structure at which an adjustment in grade can be made.

1.4.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.5 NAVY AND MARINE CORPS INTRANET (NMCI) COORDINATION REQUIREMENTS

1.5.1 NMCI Contractor Access

Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.

Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS

11/22, CHG 3: 08/24

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for all submittals . Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. Building 3918 must be ready for operation as approved by Contracting Officer before work is started on the demolition of Building 153 which would interfere with normal operation.

b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

c. Building 3918 will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

d. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

f. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.

The following conditions apply:

(1) Construction activities in Alcohol Storage 101 and Beer Cave 102 must be complete and accepted by the Contracting Officer before construction activities commence in other parts of Building 3918.

(2) Limit noisy construction activities including but not limited to jackhammers and power saws to before 10:00 am so that they do not disturb normal operations.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic, and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, SECTION 01 14 00 Page 1 including delivery vehicles, is clearly identified with their company name.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors, including addresses and telephone numbers, for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.3.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction, and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.3.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure

SECTION 01 14 00 Page 2 results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.3.1.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.3.1.2.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.3.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.2 Working Hours

Regular working hours will consist of an 8 1/2 hour period , between 7:00 a.m. and 3:30 p.m., Monday through Friday , , excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number, and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.4 Occupied Building

The Contractor shall be working in an existing building which is occupied.

SECTION 01 14 00 Page 3

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the building during the construction period.

Relocate movable furniture as required to perform the work, protect the furniture, and replace the furniture in its original location upon completion of the work. Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.

The Government will remove other Government property in the areas of the building scheduled to receive work.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and fire protection are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. Obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection .

1.4 SECURITY REQUIREMENTS

Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:

1.4.1 MCAS Cherry Point Regulations

No employee or representative of the contractor will be admitted to the work site without an Identification Badge or is specifically authorized admittance to the work site by the FEAD, Facilities Engineering & Acquisition Division.

IMPORTANT NOTE: FEAD personnel (Construction Managers, SECTION 01 14 00 Page 4

Engineers/Architects, Engineering Technicians, Contract Specialists, or Contract Surveillance Representatives) will not receive, process, re-transmit, or otherwise handle IN ANY WAY Personally Identifiable Information (PII) related to the badging process. Do NOT forward any of this information to the FEAD.

1.4.2 Contractor Access to MCAS Cherry Point and Outlying Areas

1. Documentation requirements for granting access to MCAS Cherry Point for commercial and contract employers and employees. This document is an aid in meeting ASO 5560.6B requirements and is not a substitute for the order.

2. The Pass & Identification Office at Building 251 will issue credentials to authorized contractors. Sub-Contractors and suppliers must coordinate through the Prime-Contractor.

3. Criminal Activity. In accordance with ASO 5560.6B, the below list of criminal activities within an applicant's record are considered not in the best interest of the Marine Corps and will be grounds for automatic denial of access aboard the Installation:

a. Conviction for espionage, sabotage, sedition, treason, terrorism, armed robbery, or murder.

b. Felony conviction for a firearms or explosives violation, regardless of the date of conviction.

c. Conviction of crimes encompassing sexual assault or rape.

d. Conviction of crimes encompassing child molestation, or the possession or production of child pornography.

e. Conviction of trafficking in persons.

f. Conviction of drug possession with intent to sell or distribute.

g. Convicted of three or more misdemeanor violations, or attempted violations, within the previous 10 years of the following offenses:

(1) Sex crime

(2) Assault

(3) Larceny

(4) Drugs

(5) Weapons

4. Persons requesting access to MCAS Cherry Point will be denied access based on the following:

a. The individual is a registered sex offender.

b. The individual has an active arrest warrant from Federal, State, local, or other civil law enforecement authorities, regardless of offense or violation.

c. The individual has a felony conviction within the last 10 years, regardless of the offense or violation.

d. The individual's name appears on any Federal or State agency watch

SECTION 01 14 00 Page 5 list for criminal behavior or terrorist activity.

e. The individual is debarred entry or access to a Marine Corps site, other DoD installations or facilities, or other Federal site or facility.

f. The individual engaged in acts or activities designed to overthrow the U.S. Government by force.

g. The individual is known to be or reasonably suspected of being a terrorist or belongs to an organization with known terrorism links/support.

h. The individual is identified in the National Crime Information Center (NCIC) known suspected terrorist (KST) file, or the Terrorist Screening Database (TSDB) report as known to be, or suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity. If an individual is identified on the NCIC KST files or TSDB, the Provost Marshal's Office (PMO) will immediately call the NCIS Multiple Threat Alert Center (MTAC) for further coordination. The MTAC will coordinate with the Department of Justice or Federal Bureau of Investigation (FBI) and provide handling instructions to MCAS Cherry Point Police, Criminal Investigations Division (CID), or NCIS.

i. The individual is illegally present in the U.S.

j. The individual has knowingly submitted an employment questionnaire with false or fraudulent information.

k. The individual is a prisoner on a work-release program or currently on felony probation or parole.

l. The individual is pending any felony charge.

m. The individual has criminal arrest information that the site commander determines the person presents a threat to good order, discipline, or health and safety on the Marine Corps site.

n. Any reason the Installation Commander deems reasonable for good order and discipline.

1.4.3 Staging Area

As indicated on the plans, the Contractor staging area will be (Construction Manager to coordinate). Amount of material on site shall be kept to a minimum and shall only be material that is pertinent to the work currently being performed. All stockpiling of equipment and materials shall be closely coordinated with the Government and shall not disrupt activities at the site.

SECTION 01 14 00 Page 6

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

SECTION 01 14 00 Page 7

SECTION 01 14 00 Page 8

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

11/20, CHG 4: 08/24

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

1.2 SUBMITTALS

Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Schedule of Prices

1.3 SCHEDULE OF PRICES

1.3.1 Data Required

Schedule of Prices must have cost summarized and totals provided for each construction category. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Indirect activities (e.g., meetings, presentations, submittals, surveys, haul road or storage yard maintenance, dust control, security) will not be cost loaded. Evenly distribute the costs across the associated construction activities. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.

1.3.2 Payment Schedule Instructions

Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer.

Additionally, the Schedule of Prices must be separated as follows:

a. Primary Facilities Cost Breakdown:

Defined as work on the primary facilities out to the 5 foot line.

Work out to the 5 foot line includes construction encompassed within a theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.

SECTION 01 20 00 Page 1

b. Supporting Facilities Cost Breakdown:

Defined as site work, including incidental work, outside the 5 foot line.

1.3.3 Schedule Requirements for HVAC TAB

The field work requirements in Section 23 05 93.00 22 TESTING, ADJUSTING, AND BALANCING FOR HVAC must be broken down in the Schedule of Prices and in the Construction Progress Documentation by separate line items which reflect measurable deliverables. The value for each pay item listed below will be established on a case by case basis for each Contract. The line items are as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. Submit the resulting findings to the Government to allow correction of the design. The progress payment will not be issued until the report is reviewed and approved.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report must contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results, and a quality control checklist of work items that must be completed before TABS field work commences.

c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data must be collected for one seasonal condition (either summer or winter depending on project timing).

d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.

e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.

f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. Compile this data into a report and submit to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.

SECTION 01 20 00 Page 2

1.4 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the

EP 1110-1-8 .

1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.5.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. Include the documents listed below in the requests for payment.

a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.

b. The Estimate for Voucher/Contract Performance Statement on NAVFAC Form 4330/54 furnished by the Government. Use NAVFAC Form 4330, unless otherwise directed by the Contracting Officer, on NAVFAC Contracts when a Monthly Estimate for Voucher is required.

c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.

d. Monthly Work-hour report.

e. Updated Construction Progress Schedule and tabular reports required by the contract.

f. Contractor Safety Self Evaluation Checklist.

g. Updated submittal register.

h. Solid Waste Disposal Report.

i. Certified payrolls.

j. Updated testing logs.

k. Other supporting documents as requested.

1.5.2 Submission of Invoices

If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF

SECTION 01 20 00 Page 3 attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.

Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.

1.5.3 Final Invoice

a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.

b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.

c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.

1.6 PAYMENTS TO THE CONTRACTOR

Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.

1.6.1 Obligation of Government Payments

The obligation of the Government to make payments required under the provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR

32.103 Progress Payments Under Construction Contracts:

a. Reasonable deductions due to defects in material or workmanship;

b. Claims which the Government may have against the Contractor under or in connection with this Contract;

c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and

d. Failure to maintain accurate "as-built" or record drawings in accordance with FAR 52.236.21.

SECTION 01 20 00 Page 4

1.6.2 Payment for Onsite and Offsite Materials

Progress payments may be made to the Contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:

a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.

b. Materials delivered on the site, but not installed, and off-site materials to be considered for progress payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.

c. Provide the Contracting Officer with documentation (e.g., Purchase Orders or Material Contracts) to justify payment for materials in advance of installation. When appropriate, include the Defense Priorities and Allocations System (DFAS) ratings (e.g., DX or DO) on purchase orders or material contracts to ensure timely delivery.

d. Materials to be considered for progress payment prior to installation must be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Prices requirement of this Contract.

Requests for progress payment consideration for such items must be supported by documents establishing their value (e.g., paid invoices) and that the title requirements of the clause at FAR 52.232-5 Payments Under Fixed-Price Construction Contracts have been met.

e. Ensure materials are adequately insured and protected from theft and exposure. Provide insurance documentation (e.g., Builder's Risk Insurance) which covers the overall value of the materials to be paid in advance of installation.

f. Provide a written consent from the surety company with each payment request for offsite materials.

g. Materials to be considered for progress payments prior to installation must be stored either in Hawaii, Guam, Puerto Rico, or the Continental United States. Other locations are subject to written approval by the Contracting Officer.

h. Materials in transit to the job site or storage site are not acceptable for payment.

SECTION 01 20 00 Page 5

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

SECTION 01 20 00 Page 6

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

11/20, CHG 4: 08/24

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements

1.2 SUBMITTALS

Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

View Location Map Progress and Completion Pictures

1.3 VIEW LOCATION MAP

Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.

1.4 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten different viewpoints selected by the Contractor unless otherwise directed by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures.

Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file.

Include a date designator in file names. Photographs provided are for unrestricted use by the Government.

1.5 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by North Carolina law.

SECTION 01 30 00 Page 1

1.6 SUPERVISION

1.6.1 Superintendent Qualifications

Provide project superintendent with a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.

For projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section01 45 00 QUALITY CONTROL, the superintendent must have qualifications in accordance with that section.

1.6.2 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of Contract work. In addition, if a QC representative is required on the Contract, then that individual must also have fluent English communication skills.

1.6.3 Duties

The project superintendent is primarily responsible for managing…