This is a Questions and Answers document clarifying requirements for the Rental of 2 60-ton Chill Water System solicitation (N4215827QC002) issued by the Naval Sea Systems Command. The document addresses six key inquiries regarding contract terms, specifications, and billing procedures.

The quotes are due November 17, 2026 at 9:00 AM EST, with a period of performance beginning January 7, 2027. Each system requires one 60-ton minimum chiller unit as a single piece of equipment; two smaller chillers combined in one system are not acceptable due to space constraints. Equipment may be supplied and serviced by subcontractors, including rental companies providing 4-hour on-site response support. Billing will be monthly and only in arrears through WAWF after work completion; advance billing is not permitted. Certification requirements previously referenced in "Attachment A" have been incorporated into the Requirements for Lifting of Equipment section of the Statement of Work. The document also confirms that FAR 52.219-14 is not applicable to this solicitation.

View the file

Other files

File Type Posted
Attachment 2 - Questions and Answers Amendment 2.docx DOCX document
Attachment 1 - Combined Synopsis.docx DOCX document
Combined Synopsis.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for Chiller

1. The combined synopsis lists the quote closing date with the year 2027 in one place. Please confirm quotes are due November 17, 2026 at 9:00 AM EST.

Answer: The quotes are due on November 17, 2026 at 9:00 AM EST. The changes have been made in the combined synopsis.

2. The cover table shows a January 1, 2027 start, while SOW sections 1.5 and 4.1 show January 7, 2027. Please confirm the base period start date.

Answer: The period of performance does start on January 7, 2027. The SOW is correct and I have made the changes in the combined synopsis.

3. The technical section asks for a signed statement of compliance with certifications "outlined within Attachments," and the rigging and weight-marking requirements cite "Attachment A." Only the combined synopsis is posted. Please post Attachment A and confirm whether any other certifications are required.

Answer: The requirements of “Attachement A” have been incorporated into section Requirements for Lifting of Equipment. When they rewrote the specification, they forgot to take out “Attachment A”.

4. Each system calls for one 60-ton (minimum) chiller. Would two smaller chillers (e.g., 2 x 30-ton) combined in one system be acceptable, or must each system be a single unit?

Answer: Due to space constraints, one 60-ton unit is required

5. FAR 52.219-14 is not listed. Please confirm the equipment may be supplied and serviced (including the 4-hour on-site response) by an equipment rental company acting as our subcontractor.

Answer: Yes, the equipment can be supplied and serviced by subcontractors.

6. Will the Government accept monthly invoices in advance, or only monthly in arrears through WAWF?

Answer: It will be billed only monthly and not before the work has been completed.