Attachment 2 - Questions and Answers Amendment 2.docx

DOCX document 16 KB Posted

Attached to
Rental of 2 60-ton Chill Water System
Solicitation number
N4215827QC002
Issued by

About this file

This is a Questions and Answers document for a federal solicitation (N4215827QC002) issued by the Department of the Navy Naval Sea Systems Command for the rental of two 60-ton chilled water systems at Norfolk Naval Shipyard. The document clarifies nine key points regarding the solicitation requirements and contract terms. Quotes are due November 17, 2026 at 9:00 AM EST, with the base period of performance commencing January 7, 2027. Each system requires one single 60-ton unit minimum; two smaller chillers combined into one system are not acceptable. Equipment may be supplied and serviced by subcontractors, including equipment rental companies providing 4-hour on-site response service. Monthly billing occurs in arrears only after work completion through WAWF, with no advance invoicing permitted.

The document addresses operational and logistical requirements, including that equipment cannot be delivered or set up before the contract start date but should be ready for use within one week of on-site arrival, with contractors expected to have equipment operational at the beginning of the performance period. Subcontractor personnel requiring access to Norfolk Naval Shipyard must obtain DBIDS/NCACS badging, which typically requires 2-3 weeks but may be expedited to one week; contractors must submit SECNAV Form 5512s for each employee at time of award. The replacement-unit service clock requirement specifies that the 48-hour period for returning a unit to service without charge begins when the contractor is notified via email sent to the contractor, project team, Contracting Officer, and Contract Specialist. The contractor must dispatch a repair representative within four hours and provide a replacement unit within 24 hours of notification.

View the file

Other files

File Type Posted
Attachment 2 - Questions and Answers.docx DOCX document
Attachment 1 - Combined Synopsis.docx DOCX document
Combined Synopsis.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for Chiller

1. The combined synopsis lists the quote closing date with the year 2027 in one place. Please confirm quotes are due November 17, 2026 at 9:00 AM EST.

Answer: The quotes are due on November 17, 2026 at 9:00 AM EST. The changes have been made in the combined synopsis.

2. The cover table shows a January 1, 2027 start, while SOW sections 1.5 and 4.1 show January 7, 2027. Please confirm the base period start date.

Answer: The period of performance does start on January 7, 2027. The SOW is correct and I have made the changes in the combined synopsis.

3. The technical section asks for a signed statement of compliance with certifications "outlined within Attachments," and the rigging and weight-marking requirements cite "Attachment A." Only the combined synopsis is posted. Please post Attachment A and confirm whether any other certifications are required.

Answer: The requirements of “Attachement A” have been incorporated into section Requirements for Lifting of Equipment. When they rewrote the specification, they forgot to take out “Attachment A”.

4. Each system calls for one 60-ton (minimum) chiller. Would two smaller chillers (e.g., 2 x 30-ton) combined in one system be acceptable, or must each system be a single unit?

Answer: Due to space constraints, one 60-ton unit is required

5. FAR 52.219-14 is not listed. Please confirm the equipment may be supplied and serviced (including the 4-hour on-site response) by an equipment rental company acting as our subcontractor.

Answer: Yes, the equipment can be supplied and serviced by subcontractors.

6. Will the Government accept monthly invoices in advance, or only monthly in arrears through WAWF?

Answer: It will be billed only monthly and not before the work has been completed.

7.Delivery and setup window. How many days before the base period start date may the units be delivered, set up, and tested on site, and is there a required ready-for-use date?

Answer: There is no time before the contract starts that any equipment can be delivered. To get the equipment ready for use is usually within a week once the equipment is on site. Contractor should be able to have the equipment on site at the beginning of the period of performance.

8.Base access for the rental partner's crew. Our rental partner's delivery, setup, and service crews will need DBIDS/NCACS access to Norfolk Naval Shipyard. What is the lead time and process for obtaining that access, and who sponsors the subcontractor's personnel?

Answer: Badging usually takes 2-3 weeks to get the badging process completed. We can expedite this process, if need be, to maybe a week. Contractor should email the COR the SECNAV Form 5512’s for each employee at the time of award if any badging is required.

9.Replacement-unit clock. The solicitation requires a repair representative dispatched within 4 hours, a replacement unit within 24 hours, and no charge if a unit is not back in service within 48 hours. Please confirm the 48-hour period runs from the initial trouble call.

Answer: The clock starts ticking when the contractor is notified. Email notification is sent to the contractor, the project team, the Contracting Officer and the Contract Specialist.