Lifting Plan- Updated.pdf

PDF 398 KB Posted

Attached to
Removal of (4) Temporary production facilities
Solicitation number
N4215826Q0001
Issued by

About this file

The document is a detailed procedure and technical specification for mobile home services by W.O. Grubb Crane Rental. The procedure outlines rigging equipment rental and mobilization for setting office trailers, specifying a comprehensive list of required equipment including:

  • (4) 10' Brown endless 60 degree slings (45,989# each)
  • (4) 35T shackles
  • (4) 10' grey endless 60 degree slings (26,846# each)
  • (2) 5T chain falls
  • (6) 17T shackles
  • Spreader box bar (supplied by other)
  • (6) Blue endless 21,200# vertical slings
  • (6) 17T shackles for trailer connection

The procedure includes key responsibilities such as mobilizing rigging equipment, performing lift plans by others, breaking down and cleaning equipment after use, and holding the contractor responsible for keeping rigging dry and undamaged. Accompanying technical drawings provide detailed schematics for spreader bar configuration and crane rigging illustration for lifting a "Perimeter Frame" unit, including specific attachment points and lifting methodology.

View the file

Other files

File Type Posted
lifting diagram.jpg JPG image
Berth 22.pdf PDF
Q and A for Dbl Wde Trl Removal.docx DOCX document
P3 4DW Excessing SOW(Contractor).docx DOCX document
Combined Synopsis N4215826Q0001 Dbl Wde Tlr Removal.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .