lifting diagram.jpg

JPG image 1 MB Posted

Attached to
Removal of (4) Temporary production facilities
Solicitation number
N4215826Q0001
Issued by

About this file

This image is a technical diagram from Whiting Co., Inc., located in South Whitley, IN, providing lifting and rigging instructions for a modular unit. The diagram specifies critical handling requirements, including a gross lifting weight of 21761 lbs and mandatory safety protocols. Key instructions include: modules must be ballasted, temporary shipping walls are required on open sides, do not lift modules without temporary walls in place, and use a minimum standard anchor shackle size of 1 1/2" with a quantity of 1 per module. The schematic shows multiple decals (#2 and #3), typical lifting eyes, a siding starter, and detailed positioning of windows and doors on what appears to be a modular building or container unit. The diagram emphasizes safety considerations and proper lifting techniques to prevent potential damage during transportation and installation.

View the file

Other files

File Type Posted
Lifting Plan- Updated.pdf PDF
Berth 22.pdf PDF
Q and A for Dbl Wde Trl Removal.docx DOCX document
P3 4DW Excessing SOW(Contractor).docx DOCX document
Combined Synopsis N4215826Q0001 Dbl Wde Tlr Removal.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .