N4215825RS002 0005.pdf
PDF 609 KB Posted
- Attached to
- Roving Fire Watch
- Solicitation number
- N42158-25-R-S002
About this file
This document is an Amendment of Solicitation/Modification of Contract for a Roving Fire Watch service contract at Norfolk Naval Shipyard. The amendment extends the solicitation due date from February 17, 2025, to May 19, 2025, and modifies the Performance Work Statement (PWS) and delivery schedules for multiple Contract Line Item Numbers (CLINs). The contract requires providing 24/7 roving fire watch personnel to monitor fire protection systems in the Triplex (Buildings 163, 202, and 234) and Building 510 within the Controlled Industrial Area.
The solicitation requires contractors to provide qualified fire watch personnel with specific equipment and training, including flashlights, identification badges, instruction cards, and radios. Key personnel requirements include a Project Manager with 10 years of experience and Supervisors with 5 years of experience. All contractor personnel must possess a Secret-level security clearance, be U.S. citizens, and comply with strict badging, safety, and security protocols. The contract emphasizes continuous monitoring of fire hazards, maintaining logs, and immediate reporting of any abnormal conditions or potential fire risks.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4215824RCD0009
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
I. Incorporate additional information instructions to the PWS.
II. Extend the solicitation due date and time.
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 18
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-May-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4215825RS002
X 9B. DATED (SEE ITEM 11)
12-Dec-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-May-2025
CODE
NORFOLK NAVAL SHIPYARD
ATTN: JASON FITTRO
SUPPORT SERVICES BRANCH
C412, BLDG 65, 1ST FLOOR, RM 101
PORTSMOUTH VA 23709-1022
N42158 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4215825RS002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-Feb-2025 09:00 AM to 19-May-2025 11:00 AM.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 20-MAR-2025 TO
19-MAR-2026
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
FOB: Destination
N42158
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 09-JUN-2025 TO
08-JUN-2026
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
The following Delivery Schedule item for CLIN 0002 has been changed from:
CAGE
POP 20-MAR-2025 TO
19-MAR-2026
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
CAGE
POP 09-JUN-2025 TO
08-JUN-2026
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
The following Delivery Schedule item for CLIN 1001 has been changed from:
CAGE
POP 20-MAR-2026 TO
19-MAR-2027
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
CAGE
POP 09-JUN-2026 TO
08-JUN-2027
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
The following Delivery Schedule item for CLIN 1002 has been changed from:
CAGE
POP 20-MAR-2026 TO
19-MAR-2027
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
CAGE
POP 09-JUN-2026 TO
08-JUN-2027
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
The following Delivery Schedule item for CLIN 2001 has been changed from:
POP 20-MAR-2027 TO
19-MAR-2028
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
CAGE
POP 09-JUN-2027 TO
08-JUN-2028
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
The following Delivery Schedule item for CLIN 2002 has been changed from:
CAGE
POP 20-MAR-2027 TO
19-MAR-2028
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
CAGE
POP 09-JUN-2027 TO
08-JUN-2028
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
The following Delivery Schedule item for CLIN 3001 has been changed from:
POP 20-MAR-2028 TO
19-SEP-2028
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
CAGE
POP 09-JUN-2028 TO
08-DEC-2028
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
The following Delivery Schedule item for CLIN 3002 has been changed from:
CAGE
POP 20-MAR-2028 TO
19-SEP-2028
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
CAGE
POP 09-JUN-2028 TO
08-DEC-2028
N/A SEE SCHEDULE
PERFORMANCE WORK STATEMENT
AS SPECIFIED
PORTSMOUTH VA 23709
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Pricing Sheet Attachment 3 Exhibit 2 Past
Performance Questionnaire
Attachment 4 Exhibit 1 Past Performance Information Form
Attachment 5 Appendix A - CDRLs Attachment 6 Additional Information
Document (By Request)
Attachment 8 Enclosure 3 OPSEC
PLAN
Attachment 9 Wage Determination Info 2015 4341
27-JAN-2025
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 5 Appendix A - CDRLs Attachment 8 Enclosure 3 OPSEC
PLAN
Attachment 9 Wage Determination Info 2015 4341
27-JAN-2025
The following have been modified:
PERFORMANCE WORK STATEMENT
SECTION A: SCOPE
1. OBJECTIVE:
The purpose of this requirement is to provide constant Roving Fire Watch (RFW) services to support building maintenance and repairs to the fire alarm, fire suppression, and fire sprinkler systems, inside the Triplex (buildings 163, 202 and 234) and building 510; which are located inside the Controlled Industrial Area (CIA) at Norfolk Naval Shipyard (NNSY) Portsmouth, Virginia.
2. BACKGROUND/ INTRODUCTION:
NNSY Triplex (buildings 163, 202, and 234), and building 510 have fire protection systems which require maintenance/ repairs. In order to conduct maintenance/ repairs to fire alarm, fire suppression, and fire sprinkler systems, a 24-hour roving fire watch is required to monitor conditions and mitigate the risk of fire.
SECTION B: APPLICABLE DOCUMENTS+
3. DOCUMENTATION:
N/A
SECTION C: REQUIREMENTS:
4. SCOPE OF WORK:
4.1 Place of Performance: Work will be primarily performed on-site within the Triplex (Buildings 163, 202 and 234), and building 510 located inside the Controlled Industrial Area (CIA) of Norfolk Naval Shipyard in Portsmouth, VA.
5. REQUIREMENTS:
5.1 ROVING FIRE WATCH:
Roving Fire Watch is defined as a temporary measure to ensure continuous and systematic surveillance of a building, or a portion of a building in support of inoperable fire protection systems. The contractor shall provide a roving fire watch consisting of qualified individuals for the purpose of identifying and controlling fire hazards, detecting early signs of fire, and activating an alarm in the event of a fire. Refer to 5.6.13.
5.2 HAZARDOUS MATERIAL:
The Contractor shall ensure contractor personnel are handling/using hazardous materials in accordance with NAVSHIPYDNORINST P5090.2 Volume III Chapter 5, Hazard Communication. Examples of hazardous materials include, but are not limited to, materials that exhibit flammable, combustible, ignitable, reactive, poisonous, corrosive, or toxicity characteristics such as paints, solvents, adhesives, cleaners, pesticides, acids, bases, greases, oils, lubricants, and oxidizers. The Contractor shall ensure that employees are trained on the location and content of applicable Safety Data Sheets (SDS) and are knowledgeable on how to access SDS.
5.3 SAFETY AND HEALTH LAWS AND REGULATIONS:
The Contractor and Subcontractor(s) shall comply with the requirements of applicable safety and health laws and regulations such as Occupational Safety and Health standards which include Maritime Standards Code of Federal Regulations (CFR) (29 CFR 1915), General Industry Standards (29 CFR 1910), and other applicable federal, state and local environmental protection laws, codes, ordinances and regulations, in disturbing or removing paint during data collection for a specific task. All paints on naval vessels are considered to contain heavy metals, i.e., lead, chromium or cadmium unless established otherwise by laboratory analysis.
5.4 MATERIAL AND EQUIPMENT:
5.4.1 Contractor Employees Equipment: The Contractor shall ensure that contractor employees possess their own work apparel and Personal Protective Equipment (PPE), which is mandated by 29 CFR 1915 (e.g.
safety steel toe shoes, ear plugs, hard hats, safety glasses, and/or flash goggles/equivalent eye protection) required to accomplish work tasks.
5.4.2 The Contractor shall provide the following to the RFW Personnel:
5.4.2.1 Flashlight(s).
5.4.2.2 Watch or device to keep and record time (device cannot be a personal electronic device (PED) such as a cell phone).
5.4.2.3 Roving Fire Watch identification badge (3”x 2” card labeled “Roving Fire Watch” worn on person and visible with contractor work badge).
5.4.2.4 Roving Fire Watch instruction card, to include but not limited to: designated RFW route, actions to take if abnormal conditions are observed during RFW patrol, the sequence of events required for fire response and alarms sounding, and emergency personnel contact information.
5.4.3 NNSY shall provide radios for RFW personnel.
5.4.3.1 NNSY will maintain all radios during the duration of this contract.
5.4.3.2 Radios shall not leave NNSY property.
5.4.3.3 Radios shall not be stored in a locked container or any location where NNSY employees do not have access at all times.
5.4.4 NNSY shall provide Checkpoint Signature Sheets at clipboard locations in accordance with the routes and checkpoint locations provided in the additional information document.
5.5 QUALIFICATION/TRAINING REQUIREMENTS:
5.5.1 Training of personnel shall be performed by the Contractor at their own expense with the exception of orientation and NNSY provided training required specifically for performing work at NNSY.
5.5.2 The Contractor shall provide written verification that each contractor employee performing work under this contract has completed the required training and possesses the qualifications specified:
5.5.2.1 NAVSEA Standard Item 009-74 Occupational, Safety and Health Requirements.
5.5.2.2 Fire Watch Training per 29 CFR 1915.508(c) & (e). This training shall comply with the Fire training requirements as specified in 29 CFR 1915 and CFR 1915.508, Subpart P “Fire Protection in Shipyard Employment.” A copy of the Contractor’s lesson plan must be submitted electronically to the NNSY Designated Representative for review and approval no later than ten
(10) calendar days after contract award and yearly thereafter upon exercise of option(s).
5.5.2.3 Shipyard Mandatory Annual Refresher Training (SMART): The SMART material will be provided to the Contractor by NNSY’s Code 920 and/or COR upon contract award. Refer to CDRL A006. A SMART Sign-In Sheet shall be completed for each contractor employee prior to onboarding at NNSY. The Sign-In Sheet shall be received by NNSY’s Code 920, COR and/or TPOC by 1200 on the Thursday prior to the week contractor employee onboard.
5.5.3 Contractor personnel reporting to NNSY shall meet the following criteria:
5.5.3.1 Be trained in accordance with 29 CFR 1915, Subpart I, on confined/enclosed space requirements and contracting options.
5.5.3.2 Be trained to wear required Personal Protective Equipment (PPE) when designated or required and be trained in hearing conservation and eye safety awareness.
5.5.3.3 Possess working knowledge on how to read and understand the information provided in Safety Data Sheet (SDS).
5.5.3.4 Shall be physically able to walk unassisted for periods of up to and exceeding one (1) hour, egress a defined route within a building containing common areas, stairwells, storage areas, and concealed places.
5.6 DETAILED TASKS
5.6.1 During the Period of Performance (POP), the Contractor shall provide, at a minimum, qualified Roving Fire Watch personnel, project managers, and supervisors in accordance with the following:
• The Roving Watch shall be conducted 24 hours a day, 7 days a week regardless of building occupancy.
• The B510 roving watch shall consist of one (1) for the 1st floor, one (1) for the 2nd and 3rd floors, and one (1) for the 4th, 5th, and 6th floors – for a total of three (3) dedicated rovers.
• For the buildings making up the triplex, roving watches shall consist of one for the 1st floor of
B163, one (1) for the 2nd and mold loft floors of B163, one (1) for the B202 East, one (1) for B202 West, one (1) for the 1st floor of B234, one (1) for the Mezzanines of B234 and one (1) for the 2nd and 3rd floors of B234 – for a total of seven (7) dedicated rovers.
• Two (2) supervisors are required to be on-site for the duration of each shift, one (1) in building
510, and one (1) in the building that makes up the triplex.
5.6.2 Project Manager: The Contractor shall identify a Project Manager (PM). The PM shall coordinate all aspects of contract performance with the designated COR, Alternate COR (ACOR), and/or Technical Point of Contact (TPOC). The PM shall keep the government points of contact apprised of schedule, technical, material and financial issues pertaining to contract performance.
5.6.3 Communication: The Contractor shall ensure all communication pertaining to any aspect of this contract is conducted via the NNSY Contracting Officer (KO) and COR. The Contractor shall coordinate further communications with other NNSY TPOCs, Supervisors/Managers within the facility.
5.6.4 The Contractor shall coordinate efforts with the COR and provide a daily attendance sheet to the COR/TPOC by 0900 listing all personnel in attendance. Shifts beginning after 1st shift M-F will be turned in the following day or on Monday for the weekends.
5.6.5 Roving Fire Watch (RFW) Tracker: The Contractor shall provide the COR a completed copy of a RFW Onboarding and Training Tracker prior to arrival of personnel to a Government installation. Refer to CDRL A001. The RFW Onboarding and Training Tracker (Microsoft Excel) worksheet shall be provided.
This “Tracker” worksheet contains a matrix that captures the quantity of contractor’s personnel available, badging status, badge numbers and training status of each contractor employee. The Tracker data will allow NNSY to schedule onboarding dates.
5.6.6 Qualification Records: The Contractor shall maintain detailed personnel qualification records for each contractor employee performing work in accordance with this contract and shall provide a printed copy of these records or supporting documentation for review to the Contracting Officer upon request.
Refer to CDRL A002.
5.6.6.1 Contractor personnel qualification records shall identify personnel qualifications (e.g. Fire Watch qualifications and expiration date of each qualification.
5.6.6.2 The Contractor shall ensure employees understand when and how to wear hearing protection per OSHA Requirements 29 CFR 1910.95 Occupational Noise Exposure.
5.6.7 On-site Supervision: Work assignments will be delivered to the Contractor via the NNSY Manager/Supervisor and/or TPOC. The COR is the liaisons between the Government and the Contractor(s).
The Contractor Project Managers and Supervisors shall maintain total program oversight, as well as supervise and direct the contractor employees. The Contractor Supervisor shall be responsible for disseminating work assignments to contractor personnel and providing direct supervision for the duration of assigned tasks. Contractor personnel shall be present during daily briefings conducted by NNSY Manager/Supervisor when required.
5.6.7.1 The Contractor Supervisor shall manage contractor employee’s assignments to training, shifts of work, discipline, attendance, time-off (i.e., sick, annual leave) and work performance. A Contractor Supervisor must be physically available on-site to supervise the contractor workforce at all times.
5.6.7.2 Ensure daily onboard counts of RFW personnel are reported to the NNSY COR and/or TPOC electronically via e-mail at least once per week.
5.6.7.3 Resolve contractor personnel problems, i.e. conflict resolution and administrative actions affecting the contractor employees.
5.6.7.4 Coordinate with the NNSY Supervisor or TPOC as to the physical placement of RFW personnel to ensure a continuous twenty-four (24) hour RFW patrol is maintained at all locations (4.1).
5.6.7.5 Ensure that all safety equipment for RFW personnel is in place and properly being utilized.
5.6.7.6 Ensure RFW personnel perform daily cleanup of all debris incidental to the performance of tasks.
5.6.8 Performance: The Contractor shall be required to perform in accordance with the standards, guidelines, and procedures, as stated. The Contractor is an independent contractor and not an agent of the Government.
5.6.9 Personnel Change Out: Once contractor personnel are assigned, change out of these personnel shall not occur without prior notification to the NNSY COR and/or TPOC in writing.
The Contractor shall notify the Contracting Officer, COR and/or TPOC in writing within three (3) business days of any contractor personnel replacement action. A replacement action is when any expected contractor employee is reassigned, removed, or exchanged with another unexpected or unassigned person.
The Contractor shall notify NNSY COR and/or TPOC within one (1) day after a contractor employee leaves and two (2) weeks prior to arrival of a replacement contractor employee. The Contractor shall provide the NNSY COR and/or TPOC with an updated RFW Onboarding and Training Tracker Worksheet highlighting the changes made for replaced/replacement employees. Refer to CDRLA001.
5.6.10 Document Format: Required reports and documentation must be compatible with Windows NT Server 2003 and higher as the standard Network Operation System and MS Office Professional, 2010 or later, as the standard Office Software. The use of Web applications will also be required.
5.6.12 CONTRACT EXECUTION: The RFW shall be assigned to make rounds in a facility when the fire alarm system, fire suppression system, or fire sprinkler system is inoperable. Before start of surveillance, the RFW shall scan the surrounding areas for potential hazards and find the locations of fire alarms. The RFW shall have a clear understanding of how to operate fire alarms. The RFW shall continuously monitor the entire facility (4.1) inspecting all spaces to include common areas, stairwells, concealed areas, and unoccupied storage areas. The RFW shall follow a designated route and maintain a log at each check point along the designated route, which must be signed every hour, detailing the date, time, and signature of the person conducting the roving fire watch. The logs will be attached to clip boards located at designated check points along each route. Designated routes and check point locations can be found on the additional information document provided to contractors at the mandatory site visit. The RFW shall carry a two-way communication device (4.7.2.5.) to maintain constant communication and report any fire, abnormal conditions, or other life or property hazard immediately. If a fire is observed, the RFW shall shout to alert building occupants, activate the fire alarm, and notify immediate supervisor.
5.6.13 Note: A "Fire Watch Qualification Course" shall consist of the following information at a minimum:
(a) procedures, instructions, and measures designed to protect personnel, (b) how to respond to an incipient fire, (c) shore facilities, buildings and equipment, and (d) how to activate/transmit an alarm in the triplex by using the shipyard fire alarm systems (pull stations) or communication system. IAW Section 5.5.5 above.
6. SECURITY, BADGING, AND ACCESS REQUIREMENTS:
6.1 All personnel require yellow badging.
6.1.1 Security Clearance: All yellow badge contractor personnel shall have a Final Confidential security clearance. Not Releasable to Foreign Nationals (NOFORN) data due to the nature of the work being performed on Naval Nuclear propulsion systems.
Yellow badge is necessary for the execution of non-nuclear work, inclusive of the propulsion plant and secondary spaces and systems. Inspection and Required Conditions of Propulsion Plant Systems (Non-Nuclear) for Nuclear-Powered Aircraft Carriers
7. TECHNICAL CONFERENCES / STATUS REVIEW MEETINGS:
7.1 The Contractor Project Manager and Supervisor(s) shall be available for informational meetings with the COR and/or TPOC to discuss the direction, progress, results or issues that occur during the performance of the contract. Discussions may occur at either a daily or weekly rate. During the hours or 0720 - 1550, no holidays.
8. DELIVERABLES:
8.1 Training Plan: The Contractor shall provide a training plan for each RFW. Refer to CDRL A001. The training plan shall identify all of the qualifications associated with each RFW and the requalification cycle. The training plan should be delivered electronically in PDF format via e-mail to the COR and/or TPOC. The training plan is an outline that shall specify how the training will be delivered to ensure the competencies will be obtained. The training plan shall address the following items: timeframe for achieving the competencies; training to be undertaken for each labor category; assessment details that validate successful accomplishment of each required training; name of the qualification to be issued, and any other specific requirements to be met in this contract.
8.2 Skills Tracker: The Contractor shall provide NNSY with an updated RFW Onboarding and Training
Tracker weekly after contract award. Refer to CDRL A002. The RFW Onboarding and Training Tracker (an electronic template) will be provided by NNSY upon award. The completed training tracker shall be delivered electronically via e-mail in Microsoft Excel format to the COR and/or TPOC fourteen (14) days prior to the period of performance start date.
8.3 Qualification Records: The Contractor shall provide NNSY with a certification of employee qualifications, both training and medical, stating the employee is either currently qualified or will be qualified prior to the start of the work at NNSY. The Contractor shall submit the Certification of Qualification Records on company letterhead no less than two (2) weeks prior to the employee onboarding at NNSY. Refer to CDRL A002. The certification of Qualification Records shall be delivered electronically via e-mail to the COR and/or TPOC.
8.4 Security Status: The Contractor shall provide security clearance validation for contractor employees to
NNSY no later than one (1) week prior to badging event. Refer to CDRL A002. The security clearance validation information shall be recorded on the RFW Onboarding and Training Tracker Worksheet in the appropriate security column. The RFW Onboarding and Training Tracker containing the updated security column information, shall be delivered electronically via e-mail to the COR and/or TPOC.
8.5 Status Reports with Metrics: The Contractor shall provide Status Reports containing metrics that support the NNSY Quarterly Status meetings. Refer to CDRL A005. The metrics should measure issues pertinent to contract execution and performance. The Contractor and NNSY COR will mutually agree upon measures to be analyzed. The Status Reports shall be delivered electronically via e-mail to the KO, COR and/or TPOC at least one (1) business day prior to the scheduled Monthly and Quarterly Status meetings.
8.6 Key Personnel Resumes: The Contractor shall provide resumes of the employees designated as “Key
Personnel”. Refer to CDRL A007. The Key Personnel resumes shall be included with the Contractor’s proposal.
8.7 Shipyard Mandatory Annual Refresher Training (SMART) Sign-In Sheet: The Contractor shall submit a completed SMART Sign-In Sheet for each contractor employee prior to onboarding. Refer to CDRL A006. The SMART Sign-In Sheet is a record that contains the contractor employee’s signature certifying that the contractor employee has reviewed all NNSY mandatory annual training. This training contains topics on information technology, security and safety. The Sign-In Sheet is valid for one (1) year from signed date. This training must be valid for the entirety of contract period of performance; retrain employees if necessary.
8.8 Fully Trained Employees: The Contractor shall deliver fully trained competent employees to support RFW efforts at NNSY. The Contractor shall deliver the employees in time to support the contract. The contractor employees must have the required security clearance and badge, and complete NNSY training as specified within the contract.
9. LABOR CATEGORIES DEFINITIONS AND MINIMUM REQUIREMENTS:
9.1 General Requirements
9.2 The contract labor categories include the specific combinations of technical education, ability and experience the Government considers necessary for performance of contract.
9.3 Key Personnel: The Project Manager and Project Supervisors are designated as “Key Personnel” and are subject to the requirements of NAVSEA Clause 5252.237-9106 titled “Substitution of Personnel." The Contractor’s proposal shall include resumes of the employees nominated as “Key Personnel.” Refer to
CDRL A007.
9.4 Project Manager and Project Supervisors: (key personnel resume required).
9.4.1 Education: This position requires a minimum of a high school diploma and/or successful completion of a related trade or industrial school.
9.4.2 Experience: This position requires ten (10) years of experience as a project manager and/or supervisor.
9.5 Supervisor: (key personnel resume required).
9.5.1 Education: This position requires a minimum of a high school diploma and/or successful completion of a related trade or industrial school.
9.5.2 Experience: This position requires five (5) years of experience as a supervisor.
10. NAVY INSTALLATIONS SECURITY, BADGING AND ACCESS REQUIREMENTS:
10.1 Clearance Level: At a minimum, all contractor personnel shall be United States citizens and shall possess a Department of Defense Personal Security Clearance at the Secret level for performance on this contract. No award will be made to any offeror that does not possess a facility security clearance issued by the Defense Counterintelligence and Security Agency (DCSA) at the Secret level (minimum). The security classification of this procurement is specified in the Contract Security Classification Specification Form, DD 254, attached hereto. The inability of the Contractor to obtain the required Facility Clearance (FCL) through DCSA will be cause for the contract to be subject to termination for failure to comply with a material requirement of the contract. The inability of a contractor employee to obtain and maintain a personal security clearance at a level required to be issued a NNSY badge as specified in the contract will be cause for refusal of access to NNSY and/or other NAVSEA facilities in which work on this contract is being executed. The inability of a contractor employee to maintain a personal security clearance at a level required to be issued a NNSY badge as specified in the contract will be cause for immediate dismissal from NNSY.
10.2 Contractor work in accordance with latest LWT 042-26-001, “Security Requirements for Work within Norfolk Naval Shipyard” Restricted Data Specific: All contractors requiring a red NAVSEA badge and access to Restricted Data (RD) shall have a final security clearance.
10.3 Red NAVSEA badge personnel may require access to Nuclear Areas, Nuclear Information, Nuclear equipment, Naval Nuclear Propulsion Information (NNPI), RD, and Not Releasable to Foreign Nationals (NOFORN) data due to the nature of the work being performed on Naval Nuclear propulsion systems.
A red NAVSEA badge is necessary for the execution of nuclear and some non-nuclear work;
inclusive of the propulsion plant and secondary spaces as well as those systems which support the propulsion plants which may not be located in the propulsion plant when any of those spaces can’t be sanitized.
Access to RD and the issuance of red NAVSEA badges will be issued in accordance with
NAVSEA M-5510.2.
10.3 Controlled Unclassified Information Access: The DoD will provide information to contractors and will identify all information which is Controlled Unclassified Information (CUI) via the contracting vehicle, in whole or part, and will mark such documents, material, or media in accordance with this issuance.
When CUI is generated by non-DoD entities protective measures and dissemination controls, including those directed by relevant law, regulation, or government-wide policy, will be articulated in the contract, grant, or other legal agreement, as appropriate. DoD contracts must require contractors to monitor CUI for aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information. DoD contracts require contractors to report the potential classification of aggregated or compiled CUI to a DoD representative.
Contractors, pursuant to mandatory DoD contract provisions, will submit unclassified DoD information for review and approval for release in accordance with the standard DoD Component processes and DoDI 5230.09. All CUI records must follow the approved mandatory disposition authorities whenever the DoD provides CUI to, or CUI is generated by, non-DoD entities in accordance with Section 1220-1236 of Title 36, CFR, Section 3301a of Title 44, U.S.C., and this issuance.
10.4 Seated Contrator Specific:All contractors who receive CACs and are granted access to Navy or NNSY information technology systems and are stationed at NNSY as their permanent work location are considered to be “seated” contractors.
All seated contractors will be required to report to BLDG 1502, 2nd floor to the Personnel Security Office (Code 1127) for check-in. Code 1127 will own the seated contractor in the system of record and will be responsible for the maintenance for the contractor’s security profile.
All seated contractors will be required to attend, at a minimum, the security education portion of NNSY New Employee Orientation.
The security education portion will contain, but is not limited to, Antiterrorism Level 1, Combatting Trafficking in Persons, Active Shooter training, Information Security, Personnel Security, and Operations Security Awareness training.
Further, all seated contractors will be required to complete all annual computer based security refresher training, which is tracked and verified by the training coordinator for the code to which the contractor is assigned.
11. DBIDS: Commander, Navy Installations Command (CNIC), has established the Defense Biometric Identification System (DBIDS), to improve management and force protection at Navy installations. DBIDS is standardized process for granting unescorted access privileges to vendors, contractors, suppliers, and service providers not otherwise entitled to the issuance of a Common Access Card (CAC) who seek access to and can provide justification to enter Navy installations and facilities. Individuals currently using a Navy Commercial Access Control System (NCACS) credential for installation access are required to switch to a DBIDS credential.
There are no fees incurred by the contractor, vendor, or supplier to obtain a DBIDS credential. Visiting vendors may obtain DBIDS for Navy Installations by submitting identification credentials for verification and undergoing a criminal screening/background check. The vendor shall obtain long-term credentials through enrollment, registration, background vetting, screening, issuance of credentials, and electronic validation of credentials.
Credentials will be issued every three years and access privileges will be reviewed / renewed on an annual basis.
Further information regarding DBIDS can be found under “Popular Links” at http://cnic.navy.mil/OM/dbids.html.
The contract specialist/KO or COR, acting as liaison between the contractor/subcontractor and C-1122 Industrial Security will submit a DD Form 254 “Contract Security Classification Specification” to NNSY Security Department Code 1122 for access requirement verification prior to arrival to NNSY for Red and Yellow NAVSEA badges only.
11.1 Defense Biometric Identification System and NAVSEA Badging (REQUIRED FOR ALL
CONTRACTS)
All contractors, with the exception of permanent party (or “seated” contractors with Common Access Cards (CACs), will be required to obtain a DBIDS card to gain access to NNSY.
Procedure for receiving a DBIDS card:
a. Contractor will complete the SECNAV 5512 form(s) and forward them to their NNSY Sponsor/Contracting Officer’s Representative (COR).
b. The sponsor will complete the CVS spreadsheet utilizing the information on the completed SECNAV5512 forms and forward all documents to Commander Navy region Mid-Atlantic (CNRMA) for vetting.
c. CNRMA will add the contractor to the “179-Day List” which is utilized by the Pass and ID office to create the DBIDS card.
d. Once on the 179-Day List, the contractor may go to Pass and ID to have their DBIDS card generated.
e. Green NAVSEA access badges can be generated at this point with contractors providing proof of U.S.
Citizenship (Birth Certificate/ US Passport).
12. SECNAV 5512 and CVS: SECNAV 5512 and CVS. Contractors/subcontractors shall be supplied with a SECNAV 5512 by the COR/Sponsor. The SECNAV 5512 will be filled out completely by the individual contractor personnel requesting access to NNSY and returned to the COR/Sponsor. The COR/Sponsor shall complete the CVS spreadsheet and forward the CVS and the completed SECNAV 5512 forms to Commander Naval Region Mid Atlantic (CNRMA) for vetting utilizing the email address located at the top of the CVS spreadsheet. The NNSY CVS spreadsheet may be obtained at https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system.html under the link titled “NNSY Visitor and Contractor CAC Form.” The Contractor must complete all cells in the Visit, Visitor and Sponsor Information columns for each employee. The sheet should be saved and submitted electronically via encrypted e-mail to cnic_cnrma_cvs@navy.mil (NNSY SMO Code: 001816) and Cc: NNSY TL DESIGNATED REPRESENTATIVE up to ninety (90) days but no later than ten (10) business days prior to entering the installation.
13. Visit Request: Visit Request: The Contractor shall provide visit requests and clearances for contractor personnel performing work on this contract. The Contractor must check the Contractor Verification System within three (3) days prior to start of job for contractor employee’s clearance verification. Cleared contractor employees may report to NNSY Security / Pass Office Building 1502 to pick up appropriate color NAVSEA badge within 90 days of clearance but within five (5) days prior to arrival. The Contractor shall comply with all current badging and security procedures required to gain access to any Government site listed in this PWS.
13.1 DISS. Defense Information Security System (DISS): The Contractor shall visit https://www.dcsa.mil/is/diss/ to initiate the DISS visit request process for Controlled Industrial Area (CIA) access. DISS is the primary tool for the submission of official visit requests as well as clearance and access verifications and is used in conjunction with the CVS if a security badge is required for the work area; clearance will be verified through DISS. Only Secret security badge is required for the work area, the Contractor shall verify the employee has the proper clearance level listed in DISS prior to submission to avoid badge issuance delays. Further, the contractor Facility Security Officer is responsible to ensure each contractor employee has been granted the proper US Accesses in DISS (for example: Secret Clearance Level and/or Restricted Data).
13.2 Badging: Contractor employees shall require an individual NAVSEA identification badge, and may require additional badges i.e., CAC, to gain access to job sites. One day shipyard access badges do not meet proper badging requirements. In no case shall a One Day badge be considered sufficient to meet the badging requirement under this contract.
13.2.1 Lack of proper identification badge(s) shall result in denial of access to the Naval
Installation e.g. NNSY, and/or the ship, resulting in a delay at the Contractor's expense.
13.2.2 Contractor personnel are authorized to retain temporary badges until the badge expiration date or termination of employment. Upon badge expiration date, termination of employment, or completion of contract, the Contractor shall immediately notify the KO, Designated Representative and/or COR and return all badges to the Security Dept. or Designated Representative.
13.2.3 Badges must be displayed on the outermost garment above the waist at all times. The only exception would be while the contractor personnel is engaged in work which could cause a safety hazard if the badge were worn while performing the work.
13.2.4 Lost or misplaced badges shall be reported immediately to the Contractor’s Security
Officer, or to the NNSY Security & Pass Office.
13.2.5 All additional badging or access requirements will be identified on a case-by-case basis.
13.2.6 Contractor employees are required to obtain an NNSY NAVSEA CIA Badge for unescorted access. It is a security violation for contractor employees to enter Nuclear Work Areas without a Red NAVSEA badge.
13.3 Parking: Contractor personnel shall not drive or park personal vehicles on NNSY. However, contracted personnel may park in satellite parking lots located outside the NNSY perimeter fence.
13.4 Cell phones: Cell phones equipped with cameras are PROHIBITED in areas marked as Nuclear Work Areas (NWA), Controlled Nuclear Information Areas (CNIA), and Security Islands (SI) and in any meeting, discussion or forum where NAVSEA business of a sensitive nature is conducted. Contractor personnel shall not possess cell phones equipped with cameras in any of these areas. Violators will be disciplined under NNSY Camera Cell Phone Policy which could include arrest by security personnel, downgrade of clearance for a minimum of six (6) months and/or confiscation of cellphone with camera or any recording device.
13.5 Portable Electronic Devices (PEDs): A PED is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to recording, storing, and/or transmitting data, voice, video, or photo images (e.g., cell phones, laptops, tablets and wearable devices such as fitness bands and smart watches).
13.5.1. NAVSEA 04 Ser 04/281 IMPLEMENTATION PLAN FOR ALLOWING CAMERA-
PORTABLE ELECTRONIC DEVICES WITHIN THE CONTROLLED INDSUTRIAL AREA
13.5.2 NAVSEAINST 2200.1A PORTABLE ELECTRONIC DEVICES POLICY
13.5.3 SECPROMAN Vol 1 5510.36 Rev E
In accordance with ref (a), personally owned camera enabled PEDs will be authorized inside of the Controlled Industrial Area (CIA) and all Security Islands. Camera enabled PEDs will remain unauthorized within Controlled Nuclear Information Areas (CNIAs), Nuclear Work Areas (NWAs) and Open Storage Areas. All PEDs, camera enabled or not, are still prohibited within NWAs and Open Storage Areas.
The allowance of camera enabled PEDs inside of the CIA and Security Islands does not negate existing photography policies. Unofficial photography, filming of video, or live streaming from the camera-enabled PED remains prohibited within the CIA or any NAVSEA controlled space outside of the CIA.
Further, audio recordings (both digitally or magnetically) in NAVSEA spaces is prohibited without the approval of the Code 1120 Security Director. Submarine SPECIFIC PEDs Instructions: In accordance with COMSUBLANT/ COMSUBPACINST 2075.1C, the use of PEDs while in or on Department of Navy Submarines are prohibited.
14. Injury Reporting:
14.1 The Contractor shall inform OSHA, the NNSY Government Contracting Officer (KO), NNSY COR, NNSY ACOR, NNSY Contract Specialist and the on-site NNSY Supervisor of any injuries to Contractor personnel as soon as Contractor Management/Supervision becomes aware of the occurrence. The Contractor shall cooperate with any NNSY Safety Investigations.
14.2 The Contractor shall provide a written report of all injuries and accidents resulting in medical treatment to the NNSY COR, NNSY ACOR and the NNSY Code 106 Project Safety Manager within twenty-four (24) hours of the incident. The report shall contain the name of each injured person, date and time of incident/fire, extent of each personal injury or property damage, Contractor/Sub-Contractor name, Job Order/Work Item Number, type of incident/fire, location of event (ship name and hull number, space, compartment), a brief description of the event including occurrences leading up to the incident/fire, equipment involved, Contract Number, witness(es) and individual(s) involved, short term and long term corrective action, and root cause analysis.
15. APPLICABLE NNSY TERMS AND DEFINITIONS
ACOR - Alternate Contracting Office Representative ATMS - Automated Training Maintenance System CAC - Common Access Card CDRL - Contract Data Requirements List CFR - Code of Federal Regulations CIA - Controlled Industrial Area COR - Contracting Office Representative CTDL - Continuous Training and Development Leaders CVS - Contractor Verification System DBIDS - Defense Biometric Identification System DSS - Defense Security Service DWR - Detailed Weekly Requirement FW - Fire Watch IAW - In Accordance With IGE - Independent Government Estimate JON - Job Order Number JPAS - Joint Personnel Adjudication System KO - Contracting Officer MARMC - Mid-Atlantic Regional Maintenance Center NAVSEA - Naval Sea Systems Command NCIS - Naval Criminal Investigative Service NFPA - National Fire Protection Association NNSY - Norfolk Naval Shipyard NSWC - Naval Surface Warfare Center NCP - Navy Component Person - certified person who designates a confined space to be gas free.
OQE - Objective Quality Evidence OSHA - Occupational Safety and Health Administration OT - Overtime PFAS - Personal Fall Arrest System PM - Project Manager POC - Point of Contact POP - Period of Performance PPE - Personal Protective Equipment PRM - Project Resource Manager PWFA - Project Work Force Availability RAP - Resource Allocation Process SAEM - Supplemental Administration Employee Management SDS - Safety Data Sheets SUPDESK - Supervisor's Desk SMART - Shipyard Mandatory Annual Refresher Training SOP - Standard Operating Procedure SOW - Statement of Work SRM - Shop Resource Manager TL - Touch Labor TPOC - Technical Point of Contact TWD - Technical Work Document WARR - Workload and Resource Report Web PROS - Website Project Resources Operations and Support Program
SECTION D: CONTACT INFORMATION
17. Points of Contact: All communication pertaining to this contract shall be conducted via the designated Government Contracting Officer’s Representative (COR), Alternate COR (ACOR), Technical Point of Contact (TPOC), or other Designated Representative, as assigned by the Contracting Officer in the COR’s absence. The Contractor shall coordinate contract efforts with the COR, ACOR, TPOC or the Designated Representative daily.
Please see Clause G-242-H001 for additional point of contact information.
18.1 NNSY COR:
TBD
18.2 NNSY ACOR:
TBD
18.3 NNSY CONTRACTING OFFICER:
TBD
(End of Summary of Changes)
File details come from the government source that posted it. Updated .