Technical Capability Certs Form_ATTACHMENT IV (REV 1).docx
DOCX document 22 KB Posted
- Attached to
- Demineralized Feedwater Trailers/Rigs Federal contract opportunity
- Solicitation number
- N4215821Q0018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - N4215821Q0018.pdf | ||
| SOLICITATION N4215821Q0018 Amendment 0001.pdf | ||
| SOLICITATION N4215821Q0018 3.4.21.pdf | ||
| Past_Performance_Questionnaire_ATTACHMENT_II.docx | DOCX document | |
| Contract_Administration_Plan_ATTACHMENT_III.doc | DOC document | |
| QASP for Demineralized Water - 1.19.21 ATTACHMENT_V.docx | DOCX document | |
| Past_Performance_Info_Form___ATTACHMENT_I.doc | DOC document | |
| Technical Capability Certs Form_ATTACHMENT IV.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N42158-21-Q-0018 ATTACHMENT IV (REV 1)
TECHNICAL CAPABILITY CERTIFICATIONS
Vendor shall self-certify that the equipment and services proposed either meets or does not meet the Government’s minimum requirements specified in the associated Statement of Work (SOW) reference by initialing in the “YES” or “NO” area of the chart below.
Any deviation to the Government specifications shall be identified as such – A detailed explanation shall be provided for each negative response.
Note: In order to be considered for award, the table must be completed in its entirety and submitted with your quotation in accordance with FAR 52.212-1 Instructions of Offeror’s ADDENDUM.
Technical Capabilities Statement
Item #1 Grade “A” Feed Water Trailer.
| Shall be provided with the following capabilities, features, and specifications: |
| YES |
| NO |
The feedwater generating rigs shall be capable of processing not less than 80,000 gallons of water without regeneration when the average Total Dissolved Solids (TDS) does not exceed 300 Mg/L.
The maximum number of water treatment trailer systems in simultaneous use by the Government at any given time is ten (10). The actual quantity will vary depending on the number of ships being serviced and the criticality of these services.
Estimated total gallons to be processed yearly are 1,920,000. This number may vary depending upon operation demands.
The rig shall be designed to operate with a fresh water inlet pressure of 25 PSIG to 100 PSIG with a maximum outlet flow rate of 200 GPM.
Can provide freeze protection 365 days per year
Electrical requirements for the unit must meet the following:
· 115 VAC 60 Hz Single Phase.
· 460 VAC 60 Hz Single Phase.
· 460 VAC 60 Hz Three Phase.
Prior to delivery of the first unit, the contractor shall provide, a chart, graph, or scales giving the limits in gallons of feedwater to be expected when the city’s water TDS exceeds the contract specifications.
The contractor shall provide water within the following specifications:
| Chlorides | less than 0.1 PPM | ||
| Conductivity | less than 1.5 MHOS/CM | ||
| PH Range | 6.0 – 8.0 | ||
| Silica | less than 0.1 PPM | ||
| Visual clarity | no turbidity, oil or sediment |
The sample valve shall be situated prior to the flowmeter.
· The contractor shall provide to the Norfolk Naval Shipyard test facility routine water samples prior to the start of the regular work shift (07:20 AM to 3:50 PM) Monday through Friday. In addition to routine sampling, it may be necessary for the contractor to perform critical sampling outside of the normal working hours (Saturday, Sunday, holiday, etc.) when required by authorized NNSY personnel.
· The rig shall have a conductivity monitoring device in the outlet line which will activate audible and visual alarms when the conductivity reaches 1.5 UMHOS/CM. The monitoring device shall be calibrated by the contractor or other certified firms per the manufacturers' suggested schedule, not less than annually.
The rig shall be configured such that all pumping shall stop automatically when the conductivity goes out of specification.
It is recommended that rigs be provided with a device, such as a reverse phase relay, to correct any phase rotation incompatibility.
The units shall be equipped with an automatic internal recycling mode. When out of specification water is detected and regular pumping stops, the water should still continue to flush, either manually or automatically, internally, until the water returns to within specifications, or 500 gallons is recycled, whichever comes first. When the water comes back into specifications, a sample shall be taken and certified by the Norfolk Naval Shipyard test facility before pumping to the vessel can be resumed. If the water does not return to the desired specifications with the 500 gallon limit the rig shall be changed out.
Each rig shall have a sample valve located downstream from all water processing, which shall be prominently marked “SAMPLE VALVE”. Inlet and outlet connections shall be outside each rig. The inlet shall be a 2-1/2 NH connection. The outlet shall be a male 1-1/2 NPSH. The flush point shall be male 1-1/2 NPSH. NNSY and NOB Norfolk shall provide the required hoses and fittings to connect to the rigs.
The units shall have an external trouble indicator light, 5 – 15” in Diameter, Visible 360 Degrees, that is activated along with the audible alarm indicating that the units need attention.
All automatic shut-off devices shall be fail safe; that is; if power is lost they shall automatically switch to a closed position allowing no water to go to the vessel and will not operate until power is restored.
All gages, flowmeters, switches, and indicator lights shall be readily accessible for ease of on-site monitoring.
All gages, meters, and totalizers shall be calibrated by the contractor with a dated certification sticker attached to each item per the manufacturer’s suggested schedule or not less than annually.
The totalizer shall be accurate at various flow rates (eg: 30 GPM TO 200 GPM) even if more than one flowmeter has to be used.
The vendor shall provide training in safety and operation of units. The training will take place at the Norfolk Naval Shipyard between the hours of 7:20 A.M. AND 3:50 P.M. Four (4) mechanic level employees will be trained. The training to take place on the day of delivery of the demineralizer units.
There shall be a weather protected, schematic drawing showing the fluid flow, major components, cut off valves or breakers, etc., visibly affixed to the rig, for use in case of an emergency.
Each rig shall be roadworthy and easily moveable within NNSY and NOB Norfolk by the Contractor (wheeled trailers are preferred). Each rig shall have a unique identification marking, either numeric or alphanumeric. Each rig shall be no greater than 12 feet wide x 60 feet long in overall external dimensions. Rig shall be self-contained. The Contractor shall provide overall external dimensions of each rig and a description of the mounting configuration as part of the proposal.
In order to be considered technically acceptable, this form must be completed in its entirety.
Vendor shall certify that his product meets or does not meet each specification listed above by initialing in the applicable YES or NO box beside each specification.
Print Name Signature
Vendor’s Certification is as of __________________.
Date
Company Name