SOLICITATION N4215821Q0018 Amendment 0001.pdf

PDF 667 KB Posted

Attached to
Demineralized Feedwater Trailers/Rigs Federal contract opportunity
Solicitation number
N4215821Q0018
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Demineralized Feedwater Trailers/Rigs, newest first.
File Type Posted
Amendment 0002 - N4215821Q0018.pdf PDF
Technical Capability Certs Form_ATTACHMENT IV (REV 1).docx DOCX document
Technical Capability Certs Form_ATTACHMENT IV.docx DOCX document
SOLICITATION N4215821Q0018 3.4.21.pdf PDF
Past_Performance_Questionnaire_ATTACHMENT_II.docx DOCX document
Contract_Administration_Plan_ATTACHMENT_III.doc DOC document
QASP for Demineralized Water - 1.19.21 ATTACHMENT_V.docx DOCX document
Past_Performance_Info_Form___ATTACHMENT_I.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N4215821RC10551

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is for the follow ing:

1. Extend the solicitation response date from April 4, 2021 at 11:00AM to April 5, 2021 at 11:00AM.

2. Provide Question(s) and Answ er(s) received by interested offerors. The follow ing Question(s) and Answ er(s) shall be considered w hen submitting quotations for solicitation N42158-21-Q-0018.

3. Add provisions/clauses, 52.219-4, L-215-H001, and L-237-W001.

4. Update FAR 52.212-1 Addendum.

5. Update Technical Capabilities Statement.

6. Update the Performance Work Statement (PWS)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Mar-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4215821Q0018

X 9B. DATED (SEE ITEM 11)

04-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Mar-2021

CODE

NORFOLK NAVAL SHIPYARD

ATTN: TINA JAUREQUI

CVN SUPPORT BRANCH

C432, BLDG 65, 2ND FLOOR

PORTSMOUTH VA 23709-1022

N42158 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4215821Q0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by reference:

52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns

MAR 2020

The following have been added by full text:

AMENDMENT 0001 Q & A

1. Can the Navy conduct a site visit for the bidders? Can a site visit be arranged within the next two weeks?

Yes, the following clauses were inadvertently not included in the solicitation and are added and included via this amendment. Please refer to the following clauses for date and time of the site visit.

- L-215-H001PREBID/PREPROPOSAL CONFERENCE--BASIC (NAVSEA)

- L-237-W001 PREBID/PREPROPOSAL SITE VISIT (NAVSEA)

2. Would it be possible to receive a by-weekly or monthly breakdown of production? Can we get this for the last five years? This would help us with developing a use-and- production analysis over a time period.

This information is not available. Historically, NNSY has required the contractor to swap out facilities trailers usually twice in a year. The water trailer for the ships will usually last 8-12 months before a swap out is required.

3. What determines the quantities of deionized (DI) water required?

Estimates based on previous availabilities.

4. Is there any prediction of future requirements of DI water?

This is based on the workload of ships coming into NNSY.

Based on the waterfront up to 7-8 units could be required at a time in 2021-2022, with the possibility for 9 units in 2023. 7-8 units in 2024. This assumes some delays in projects. This does not account for emergent projects.

5. Are DI requirements tied to Navy Shipyard production? What is the outlook for the shipyard production?

The requirements are tied to how many ships are in at any given time at NNSY. There are three water trailers that are used at Building 163, Building 171 and Building 202 that have not been removed. For the building locations, the trailers are tied to boilers and in shop testing of valves/equipment on the ships.

6. How would you predict future DI water requirements -- decreasing, steady-state, or increasing?

Increasing. Existing contract N00189-16-D-0001 requested a total of six (6) trailers. This follow-on requirement is requesting a total of ten (10) trailers.

7. Can we provide our own yard truck to move the trailers? Is there room to store our yard truck in the Naval Yard?

Currently it is the responsibility of the contractor to provide their own truck to deliver/swap out/pick up their water trailers. At this time, NNSY does not have storage area to store trucks on site. Please see section

8.2 of the PWS for additional guidance.

8. Is there room in the yard to store a back-up DI trailer for quick swap out?

Currently there is not any storage area to store a back up trailer on site.

9. Given this is an open solicitation, is there credit for HUB Zone or SDVOSM in the award consideration?

The following clause were inadvertently not included in the solicitation and are added and included via this amendment: Class Deviation 2020-O0008.

HUBZone: Certification from SBA applies and the offeror’s SAM record must indicate if their business is a HUB Zone or SDVOSB.

HUBZone Price Evaluation Preference (PEP) applies for acquisitions using Full and Open competition in accordance with class deviation 2020-O0008. The contracting officer shall give offers from a HUBZone small business a “price evaluation preference” by adding a factor of 10% to all offers (large businesses)

EXCEPT—

- Offers from HUBZone SBs that have not waived the evaluation preference.

- Otherwise successful offers from small business concerns (apparent low offer).

SDVOSB: Credit for a SDVOSB does not apply to this acquisition since the requirement was not Set Aside for SDVOSB.

10. Is there any aspect regarding this task that the Navy and Shipyard want improved such as performance, service, and equipment? In other words what can we do to provide better service and performance?

The current contractor has an employee on site Monday through Friday and is engaged with the requirements owners for each Building and each ship. Engagement with requirements owner will help facilitate any issues and resolve problems in a timely manner.

11. What is the billing cycle for this contract in WAWF? How long are the task orders or task order period? Does the contractor bill for task orders monthly or by DI H2O quantity supplied, or by unit days per month?

Invoices are usually submitted for each month from the beginning of the month to the end of the month and are submitted per task order. The billing is based on the rental of the equipment per month and the contractor on-site technicians daily rate times the number of days per month. In addition, deliver/swap outs of trailers are billed accordingly. The Training CLINs are usually a one time charge and the on-site technician will train NNSY project team on how to take samples on the weekends. The contractor on-site technician takes samples Monday-Friday and NNSY project team take samples Saturday and Sunday.

Training is usually done 1-2 days after the water trailer has been delivered.

Please review DFARS clause 252.232-7006 and NAVSEA clause G-232-H005 for additional guidance and information.

Historically, task orders may be issued for up to a 12 month period of performance.

The invoice The WAWF document type for this anticipated contract is Invoice 2in1. The Invoice 2in1 WAWF type are used for Firm Fixed Price Services contracts/CLINs with no supply deliverables. This invoice type requires acceptance from the COR.

12. What, if any, are reporting requirements?

On site technician will stay engaged with the projects/requirements owner and report to the COR regarding any safety issues, scheduled swap outs or other correspondence with the requirements owner.

13. What header connection types are required?

Water will need a 1 ½ swivel fresh water connection. Please refer to paragraph 6.2 of the PWS for additional guidance.

Electrical- 2 connections 110v. Please refer to paragraph 2.3 of the PWS for additional guidance.

14. What is the targeted implementation date?

The current contract ends June 02, 2021. The equipment needs to be on site and operational June 03, 2021.

Contractor employees need to have all on site employees badging request to the COR 21 days (minimum) before arriving to NNSY. There is a 21 days approval time once request are made and then employees must go to NNSY Pass and ID badge to be able to enter the NNSY CIA.

15. Have icing issues have been a problem in the past?

No, there have not been any issues. Please refer to paragraphs 2.0, 8.5, 9.4, and 9.5 of PWS for additional guidance on the contractor’s and Government responsibilities for freeze protection.

16. In case of a hurricane or major storm targeting Hampton Roads, will the trailers have to be evacuated? Does an equipment evacuation plan have to be built-in or considered?

No, hurricane prep will be done by NNSY.

These trailers will be in an industrial area which is subject to minor damage/accidents to equipment.

In addition, during an hazardous weather event, the contractor would have to engage with the COR to secure their equipment. If the shipyard senses the equipment could endanger personnel or vessels during an event, project or facility personnel would engage with the COR to have the equipment moved.

17. Next to war, are there any identified significant risks to the NNSY such as fire, terrorism, natural disasters (storms)? We understand that there are plans in place but would like to consider potential impacts, insurance ramifications, and costs.

NNSY is an industrial environment and military installation where the Navy’s nuclear fleet is modernized and refurbished. The shipyard takes all practical mitigating actions however, NNSY is located in a low lying coastal community, and could be a potential target during time of war or terrorism.

18. Would the selection committee, KO and Yard SME be interested in visiting regeneration facilities?

NNSY does not have any interest to visit any contractor facilities prior to award.

L-215-H001 PREBID/PREPROPOSAL CONFERENCE--BASIC (NAVSEA) (OCT 2018)

(a) A preproposal conference will be held at the Norfolk Naval Shipyard, on March 24, 2021 at 0900. All prospective offerors are urged to attend this conference. In order to make the conference as productive as possible, offerors are requested to submit any questions they may have in writing to Stanay.Harrell@navy.mil and Tina.M.Jaurequi@navy.mil, by March 23, 2021 at 1100am. The offeror shall also provide written notification of the names of those company officials who will attend the conference at least 1 day before the date of the conference.

(b) Prospective offerors are advised that the preproposal conference will be held solely for the purpose of explaining the specifications and terms and conditions of this solicitation. Any changes to the solicitation will only be provided by written amendments. If an amendment is issued, normal procedures relating to the acknowledgement and receipt of any such amendment shall be applicable. In no event will failure to attend the prebid/preproposal conference constitute grounds for a claim after award of the contract.

(c) Each company is restricted to 4 attendees.

(d) This conference is unclassified. The offeror shall submit visit requests to Security Visitor Control, at least 1 day before the date of this conference for those company officials who will attend. Persons not possessing a current security clearance will be escorted.

(End of provision)

L-237-W001 PREBID/PREPROPOSAL SITE VISIT (NAVSEA) (DEC 2018)

(a) The Contracting Officer will conduct a site visit at Norfolk Naval Shipyard. All prospective offerors are urged to attend this site visit. Offerors attending the site visit will meet at the following time and location to be escorted to the site:

[Negotiators fill-in the following information]

Date: March 24, 2021 Time: 0900 Location: Norfolk Naval Shipyard Pass/ID office

(b) Offerors who plan to attend shall submit a visit request at least 1 day prior to the visit. Offerors shall comply with the base access requirements specified elsewhere specified in the solicitation to gain access to the site.

(c) A copy of the visit request shall be forwarded to the Contract Negotiator via e-mail at: Stanay.Harrell@navy.mil and Tina.M.Jaurequi@navy.mil.

(d) Offerors shall not ask questions relative to the solicitation during the site visit. All questions shall be submitted as specified elsewhere in this solicitation.

(e) Attendees shall abide by the following rules:

(1) No cameras, tape recorders, or other reproduction devices are allowed. Cell phones with camera capability are permitted in unclassified areas only. The WiFi and Bluetooth must be disabled. No photography is permitted at any time. No hard copies of any Government documents (maps, hand-outs, etc.) shall be provided to offerors. Offerors are restricted to note-taking.

(2) No explanation, remarks, or replies made by Government representatives in response to any inquiries during the Site Visit shall be construed as changing the terms or conditions of the solicitation. The definitive treatment of any such problems or questions shall be by formal solicitation amendment. Only the Contracting Officer can change the solicitation requirements.

(3) Each visitor shall be required to sign in and sign out on the visit, and must stay with the site visit group at all times. No other meetings or discussions with Government personnel shall be permitted.

(4) The Government reserves the right to inspect all material, briefcases, etc., entering or leaving Government facilities.

(5) Only advance substitutions of offeror personnel are permitted.

OFFERORS NOT COMPLYING WITH THESE RULES AND PROCEDURES MAY BE PRECLUDED FROM

FURTHER SITE VISIT PARTICIPATION.

(End of provision)

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 04-Apr-2021 11:00 AM to 05-Apr-2021 11:00 AM.

The following have been modified:

52.212-1 ADDENDUM

This requirement will be prepared in accordance with the information in FAR Subpart 12.6 and FAR Part 13.5, as supplemented with additional information included in this notice. Accordingly, a Simplified Streamlined acquisition process will be used in the evaluation and award of the contract.

Quotes are due on or before April 5, 2021 at 11:00AM Eastern. Interested offerors shall submit their quotations as a single Adobe Acrobat (.pdf) email attachment via email to Contract Specialists, Tina Jaurequi at Tina.M.Jaurequi@navy.mil, Stanay Harrell at Stanay.Harrell@navy.mil and to USFF_NNSY_C432@navy.mil.

Questions for clarification must be submitted by March 18, 2021 at 11:00AM Eastern. The Government reserves the right not to respond to any questions received concerning this solicitation after the questions receipt date.

Acknowledgement of timely receipt of offers will be made by Ms. Jaurequi or Ms. Harrell as soon as practicable upon receipt.

Late offers will be acknowledged as such and may not be considered by the Government.

The offer shall consist of one signed copy of:

1. Completed and signed standard form SF1449 with unit prices for each line item in accordance with the Contract Line Item Number (CLIN).

2. Executed copies of any amendments (if applicable);

3. All Required attachments I, II, III, IV and V completed;

4. Completed FAR 52.212-3 Representations and Certifications unless otherwise completed in SAM;

5. Technical capability information;

6. Dimensions of each rig and description of mounting configuration (pictures,pdf, etc…)

7. Past performance information;

8. Small Business Participation Plan

9. Small Business Subcontracting Plan (if not a small business concern)

10. Price

On a separate sheet of paper titled “EXCEPTIONS”, the Offeror shall identify any “exceptions” to the solicitation Contract Line Item Numbers (CLIN)s, specifications in the performance work statement (PWS), or solicitation terms and conditions. State precisely how the offered supplies/services differ from the applicable CLIN, specification paragraph(s) in the statement of work or solicitation terms and conditions. Any exception which is not expressly approved by the contracting officer in writing is hereby rejected and void. Failure to comply with the submittal requirements of this paragraph may result in rejection of the offer. If no exceptions, state NONE and include an affirmative statement that the Offeror will meet the specifications in the PWS and the solicitation terms and conditions.

Award may or may not be made without any type of discussions or negotiations. This is based on the Contracting Officer’s determination after an evaluation has been completed on all quotations.

The technical capability information, past performance information, small business participation plan, small business subcontracting plan and price shall be submitted as follows:

I. Technical Information:

The offeror should present information that clearly describes their management controls, techniques and procedures to ensure that required work is performed in a timely, responsive, professional and efficient manner.

The offeror shall provide overall external dimensions of each rig and a description of the mounting configuration as part of the quotation.

Technical Acceptability will be evaluated to determine an overall rating of “acceptable” or “unacceptable”. This will be determined by evaluating the ability of the quoter to provide a sound, compliant approach that meets all requirements and demonstrates a thorough knowledge and understanding of the Performance Work Statement (PWS) requirements. It is the contractor’s responsibility to ensure that their quotation clearly demonstrates their ability to perform these requirements.

NOTE: The above information provides guidance for what should be minimally addressed in the plan. Provide sufficient information necessary to accurately support your capabilities in a clear and concise manner while addressing all aspects of the technical specification.

II. Past Performance Information:

In order to facilitate the Government’s evaluation of this factor, the Offerors shall provide information on no more than three (3) previous contracts whose effort was relevant to the effort required by this solicitation; the contracts provided should have been performed since February 2016.

Evaluation will focus only on work experience already performed. Yet-to-be performed work and experience prior to February 2016 will not be considered. Offerors may submit performance data regarding current contract performance as long as a minimum of one year of performance has been completed as of the closing date of this

RFQ.

The Government may verify past performance information. The Government may contact some or all of the references provided, as appropriate, and may collect information through questionnaires, telephone interviews and existing data sources to include but not limited to PPIRS. This information will be used for the evaluation of past performance.

Past performance information shall be submitted in accordance with Attachment (1), Past Performance Information Form, and Attachment (2), Contractor Performance Questionnaire.

Offerors shall provide a detailed explanation on Attachment (1) demonstrating the relevance of the contract/purchase order to the requirements of the solicitation.

Attachment (2) shall be forwarded by the offeror to its references for completion.

The offeror’s references shall forward the completed Attachment (2), Contractor Performance Questionnaire to Tina Jaurequi at tina.m.jaurequi@navy.mil and Stanay Harrell at stanay.harrell@navy.mil by the closing date of the solicitation.

III. Small Business Participation Plan:

Factor III Small Business Participation Plan - and- Small Business Subcontracting Plan

Small Business Participation Plan:

All offerors (BOTH other than small businesses and small businesses) shall provide substantiating documentation to demonstrate how the contractor will meet small business participation requirements. This required information will be used to evaluate the extent of proposed participation/commitment to use U.S. small businesses in the performance of this acquisition (as either small business prime offerors or small business subcontractors). These requirements will be incorporated into any resulting contract(s) as specified below (Ref: DFARS PGI 215.304(c)(i)(A)).

1. The extent to which small business concerns are specifically identified. Within this section the small business concerns (SBC) as defined in FAR Part 19 that are to be used in your proposed approach to satisfying the requirements of this solicitation for the entire performance period shall include the following information: company name, business category(ies), description of products or services, and the NAICS code for each SBC. Use the table/format below in proposing this required information:

2. The extent of commitment to use small business concerns. Within this section please submit the following substantiating documentation: (letters of commitment, joint ventures, mentor protégé agreements, others).

Binding commitments shall become enforceable, contractual requirements.

3. The complexity and variety of the work small firms are to perform. Within this section please identify the scope elements SBC’s are responsible for providing.

4. Past Performance of the offerors in complying with requirements of the following clauses: FAR 52.219-8, Utilization of Small Business Concerns, and FAR 52.219-9, Small Business Subcontracting Plan.

a. FAR 52.219-8, Utilization of Small Business Concerns

i. Within this section please submit past performance information to demonstrate compliance with the requirements of FAR 52.219-8, Utilization of Small Business Concerns, including the extent to which small business performance objectives/requirements were met for the contracts that required submission of a Small Business Participation Plan or other small business participation/utilization document.

Copies of contractual reports (i.e. ISR’s, SSR’s, or CPAR records) may be submitted to validate compliance with requirements of FAR 52.219-8. Supporting documentation shall be relevant to the requirements of this solicitation and shall be within the past five years.

All supporting documentation is excluded from the page count.

b. FAR 52.219-9, Small Business Subcontracting Plan

Company Name

Small Business Category Product(s)/Service(s) to be provided, including type and variety of work NAICS Code

(SB, WOSB, SDB,

Hubzone, VOSB, SDVOSB)

i. Within this section please submit Past performance information to demonstrate compliance with the requirements of FAR 52.219-9 Small Business Subcontracting Plan (when applicable), including extent to which applicable goals and other small business performance objectives/requirements were met for the contracts submitted within the section above (FAR 52.219-8) to demonstrate compliance. Explanation of efforts where goals were not met should be provided. Supporting documentation shall be relevant to the requirements of this solicitation and shall be within the past five years. All supporting documentation is excluded from the page count.

5. The extent participation of small business concerns in terms of the value of the total acquisition. Within this section the SBCs (prime offerors and small business subcontractors) proposed quantitative participation, which should be expressed in terms of whole dollars and percentages based on the total acquisition (total contract value). Offerors shall provide detailed explanations/documentation to support quantitative small business participation. Binding commitments shall become enforceable, contractual requirements.

Proposed Total Contract Value $ < fill in base contract and all option years > All supporting documentation is excluded from the page count. Supporting documents will not be incorporated into any resulting contract.

Small Business Subcontracting Plan:

Large business offerors shall submit a Small Business Subcontracting Plan in addition to the Small Business Participation Plan. The Small Business Subcontracting Plan shall follow the requirements of FAR 19.704, Subcontracting Plan Requirements. Offerors are permitted to submit a master subcontracting plan so long as it is created in accordance with FAR 19.701 and 19.704(b). Please ensure that in addition to the master subcontracting plan individual subcontracting goals for the subject requirement are included. Small Business Subcontracting Plans are not required from small business offerors.

Subcontracting Plan goals shall be expressed in terms of whole dollars and percentages based on total planned subcontracting dollars. For multiyear contracts or contracts containing options, please ensure that goals are based on total subcontract dollars for the basic contract and for each option. Of the total planned subcontracting dollars, the Small Business Subcontracting Plan shall include goals for Small Businesses, Small Disadvantaged Businesses, Woman-Owned Small Businesses, HubZone Small Businesses, Veteran Owned Small Businesses and Service- Disabled Veteran-Owned Small Business. The Government will consider prior achievement of small business subcontracting plan goals as well as the proposed dollar values and percentages related to this solicitation.

The contracting officer will negotiate an acceptable small business subcontracting plan with the apparent successful large business offeror(s) in accordance with FAR 19.702(a)(1)(i).

IV. Price Information:

Offerors shall insert unit prices and amounts at the line item level.

The offeror’s proposed price will be evaluated on the basis of price reasonableness. All prices must be considered fair and reasonable as determined by the Government. All quotes submitted in response to this solicitation shall stand firm for 120 calendar days from the response date of this solicitation.

The completion and submission of the above items will constitute a quote and will be considered the offeror’s unconditional assent to the terms and conditions of this Solicitation and any attachments and/or exhibits.

Failure to provide all of these documents by the required date and time may preclude a quotation from award consideration at the discretion of the Government.

PERFORMANCE WORK STATEMENT

1.0 Applicable to items: Grade “A” Feedwater is water that has been stripped of all impurities. The term “feedwater” will be used hereafter to describe the end product meeting all requirements of the contract specification.

1.1 Capacity: The feedwater generating rigs shall be capable of processing not less than 80,000 gallons of water without regeneration when the average Total Dissolved Solids (TDS) does not exceed 300 Mg/L.

The maximum number of water treatment trailer systems in simultaneous use by the Government at any given time is ten (10). The actual quantity will vary depending on the number of ships/facilities being serviced and the criticality of these services. As such, the CLIN quantities identified herein are estimates only and are based upon historical data as well as current workload projections.

Estimated total gallons to be processed yearly are 1,920,000. This number may vary depending upon operation demands.

1.2 The rig shall be designed to operate with a fresh water inlet pressure of 25 PSIG to 100 PSIG with a maximum outlet flow rate of 200 GPM.

2.0 Freeze Protection

2.1 Freeze protection shall be provided by the contractor 365 days per year. Contractor will be responsible to ensure components of the feedwater rig are properly protected from frost or freeze.

NNSY will provide auto drip valves and/or heat trace on downstream equipment.

2.2 The Norfolk Naval Shipyard, Portsmouth, VA will provide a source of electric power and cables to hook-up freeze protection, when required.

2.3 Clearly legible, mercury free thermometers, to monitor inside temperatures, must be visible from outside the rigs.

Electrical requirements for the unit must meet the following.

2.3.1 115 VAC 60 Hz Single Phase.

2.3.2 460 VAC 60 Hz Single Phase.

2.3.3 460 VAC 60 Hz Three Phase.

3.0 Expectation Scale:

3.1 Prior to delivery of the first unit, the contractor shall provide, a chart, graph, or scales giving the limits in gallons of feedwater to be expected when the city’s water TDS exceeds the contract specifications. Information should be provided via electronic means to the technical POC listed in section 10.

4.0 Quality of Water

4.1 The contractor shall provide water within the following specifications:

4.1.1 Chlorides less than 0.1 PPM

Conductivity less than 1.5 MHOS/CM PH Range 6.0 – 8.0 Silica less than 0.1 PPM Visual clarity no turbidity, oil or sediment

4.2 The sample valve shall be situated prior to the flowmeter; hence the government shall not be required to pay for processed water expelled while obtaining a satisfactory sample.

4.3 Sampling:

4.3.1 The contractor shall deliver daily water samples to the Norfolk Naval Shipyard test facility (C134) prior to the start of the regular work shift (07:20 AM to 3:50 PM) Monday through Friday. In addition to routine sampling, it may be necessary for the contractor to perform critical sampling outside of the normal working hours (Saturday, Sunday, holiday, etc.) when required by authorized NNSY personnel.

4.3.1.1 If sample is unsatisfactory, it will be the contractor’s responsibility to troubleshoot the unit and provide additional samples to NNSY C134 until the satisfactory samples are obtained. The contractor shall repair or replace of malfunctioning units within 8 hours. Additional samples shall be at no additional cost to the Government

5.0 Protective Devices

5.1 The rig shall have a conductivity monitoring device in the outlet line which will activate audible and visual alarms when the conductivity reaches 1.5 UMHOS/CM. The monitoring device shall be calibrated by the contractor or other certified firms per the manufacturers' suggested schedule, not less than annually.

5.2 The rig shall be configured such that all pumping shall stop automatically when the conductivity goes out of specification.

5.3 It is recommended that rigs be provided with a device, such as a reverse phase relay, to correct any phase rotation incompatibility.

6.0 Required Features:

6.1 The units shall be equipped with an automatic internal recycling mode. When out of specification water is detected and regular pumping stops, the water should still continue to flush, either manually or automatically, internally, until the water returns to within specifications, or 500 gallons is recycled, whichever comes first. When the water comes back into specifications, a sample shall be taken and certified by the Norfolk Naval Shipyard test facility before pumping to the vessel can be resumed. If the water does not return to the desired specifications with the 500 gallon limit the rig shall be changed out at no additional cost to the Government.

6.2 Each rig shall have a sample valve located downstream from all water processing, which shall be prominently marked “SAMPLE VALVE”. Inlet and outlet connections shall be outside each rig.

The inlet shall be a 2-1/2 NH connection. The outlet shall be a male 1-1/2 NPSH. The flush point shall be male 1-1/2 NPSH. NNSY shall provide the required hoses and fittings to connect to the rigs.

6.3 Electrical requirements for the unit must meet the following.

6.3.1 115 VAC 60 Hz Single Phase.

6.3.2 460 VAC 60 Hz Single Phase.

6.3.3 460 VAC 60 Hz Three Phase.

6.4 The units shall have an external trouble indicator light, 5 – 15” in Diameter, Visible 360 Degrees, that is activated along with the audible alarm indicating that the units need attention.

6.5 All automatic shut-off devices shall be fail safe; that is; if power is lost they shall automatically switch to a closed position allowing no water to go to the vessel and will not operate until power is restored.

6.6 All gages, flowmeters, switches, and indicator lights shall be readily accessible for ease of on-site monitoring.

6.7 All gages, meters, and totalizers shall be calibrated by the contractor with a dated certification sticker attached to each item per the manufacturer’s suggested schedule or not less than annually.

6.8 The totalizer shall be accurate at various flow rates (eg: 30 GPM TO 200 GPM) even if more than one flowmeter has to be used.

6.9 The vendor shall provide training in safety and operation of units. The training will take place at the Norfolk Naval Shipyard between the hours of 7:20 A.M. AND 3:50 P.M. Four (4) mechanic level employees will be trained. The training to take place on the day of delivery of the demineralizer units. Training to take place when each new task order is placed.

6.10 There shall be a weather protected, schematic drawing showing the fluid flow, major components, cut off valves or breakers, etc., visibly affixed to the rig, for use in case of an emergency.

6.11 Each rig shall be roadworthy and easily moveable within NNSY by the Contractor (wheeled trailers are preferred). Each rig shall have a unique identification marking, either numeric or alphanumeric. Each rig shall be no greater than 12 feet wide x 60 feet long in overall external dimensions. Rig shall be self-contained. The Contractor shall provide overall external dimensions of each rig and a description of the mounting configuration as part of the quotation.

7.0 Applicable Items:

7.1 The contractor shall remove from the shipyard any expended unit or equipment identified by the shipyard. No payment will be provided for units remaining in the shipyard more than one (1) day (24 hours) after notification of exhaustion of the unit, to the contractor.

7.2 Regenerations:

7.2.1 The change out time shall not be greater than six (6) hours. This will, in most cases, permit removal and change-out of a rig within one eight (8) hour shift.

7.2.2 No changing of resin or demineralizer shall be performed at the Norfolk Naval Shipyard.

The contractor shall regenerate exhausted rigs at the contractor’s facility to operate at 100% of rated capacity. When the rigs are returned, the high point and low point drains and any connections shall be unclogged of resin, closed and or capped. The rated capacity is considered to be the amount of good resin required to meet the condition of paragraph

1.2 above.

7.2.3 The government shall prorate the cost per regeneration for any rig/unit failing to produce the contract requirement of a minimum of 80,000 gallons of feedwater. If a rig produces only a portion of the required amount of quality water, the government will pay only the applicable prorated portion of the regeneration fee.

7.2.4 If the TDS exceed contract specifications, the information provided as required by paragraph 3.0 shall be utilized. It shall be the contractor’s responsibility to provide the Contracting Officer with city data citing the TDS level for the time period in question.

Further as may be required, additional documentation shall be submitted to the Contracting Officer to support the contractor applying a regeneration charge for a rig producing less than the required minimum 80,000 gallons of feedwater. This information will then be used to evaluate any prorated amounts.

8.0 Applicable to Line Items Contractor’s Responsibility:

8.1 An operator shall be available on site at the Norfolk Naval Shipyard for a minimum of 4 hours per day during week days, Monday through Friday, for sample taking, delivering feedwater, recycling, and rig maintenance. The operator shall also be on call by pager/cellphone, 24 hours a day, on Saturdays, Sundays, holidays, and back shifts for emergencies as required by the Norfolk Naval Shipyard.

8.2 Contractor shall be responsible for positioning the feedwater rig on-site at Norfolk Naval Shipyard, or other specified site as directed by the duty supervisor, shop 99, or the designated representative. The rig shall be positioned within 4 hours of notification.

8.3 Contractor is not authorized to operate any NNSY supplied manifold, valves, or drains that are attached to the contractor demineralized feedwater unit unless under the direct supervision of NNSY employees that is qualified to the cleanliness requirements of the system.

8.4 Contractor shall notify the duty supervisor or the designated representative when the rig is on location and electrical and fresh water hook-ups are required.

8.5 Contractor shall be responsible to provide freeze protection to all internal rig components (eg: the resin tanks and internal piping).

8.6 Contractor shall provide security, as deemed necessary, for the physical security of their demineralizer units.

8.7 Contractor shall ensure the rig is maintained in a safe, mechanical operating condition. Safety inspection requirements shall be current at all times.

8.8 Contractor shall obtain the feedwater data analysis report (pass/fail) by phone from the Norfolk Naval Shipyard C134 test facility in order to expedite resampling, if required.

8.9 The contractor shall provide Grade “A” Quality Water in accordance with procedures below:

8.9.1 Because of the time constraints required during sample taking and testing (with or without recirculation); the time required to take an individual sample, during critical shipboard testing, shall not exceed 500 gallons or 30 minutes.

8.9.2 Rigs which do not provide suitable Grade “A” Water within the above time frame shall be removed and replaced by a regenerated rig and a certification sample taken.

8.10 The contractor shall take necessary steps to prevent damage to resin due to hot water (i.e., vent or drain excess hot water to an approved collection area prior to operation as required).

8.11 The contractor shall be capable of providing personnel for pick-up, replacement, repair, removal and sampling of all rigs.

8.12 Contractor shall provide the following information for operator (s).

Operator Data:

Corporate Point of Contact_______________________________________ Call Voice Mail Box_________________________________________________

9.0 Government Responsibility, Applicable to Line Items:

9.1 Contracting Officer’s Representative (COR) will provide oversight to the feed water programs at the Norfolk Naval Shipyard. COR will be assigned at time of contract award.

9.2 Norfolk Naval Shipyard will direct the placement/movement/replacement of feedwater units as needed.

9.3 Norfolk Naval Shipyard will provide electrical power to the feedwater rigs in a timely manner.

9.4 The Norfolk Naval Shipyard will provide a source of fresh water to the rigs equipped with a garden hose type bleeder connection for use as freeze protection and to vent/drain excess hot water in certain locations where this situation occurs (e.g. dry dock #3). All water discharged from the rigs shall run off to a sewer drain or other suitable monitored outfall to eliminate icing during cold months.

9.5 The Norfolk Naval Shipyard will provide surveillance and maintain freeze protection to the ship, the user shop manifold, and the inlet of the feedwater rigs.

9.6 The Norfolk Naval Shipyard may take additional samples and/or observe sampling techniques to ensure contractual compliance to specifications.

9.7 Any service (e.g. water, electrical, air, etc.) subject to vehicular traffic shall be adequately protected.

10.0 Points Of Contact;

10.1 Technical:

10.1.1 NNSY C269 To Be Determined Upon Contract Award

10.1.2 Contracting Officer Representative: C440, To Be Determined Upon Contract Award

10.2 Waterfront Support NNSY, will provide specific Project or Facility contact.

10.2.1 Shop 99 Waterfront Director: To Be Determined Upon Contract Award

10.2.2 Shop 99 Dispactch; To Be Determined Upon Contract Award

10.2.3 NNSY C134 Laboratory Contact:

Re: Grade ‘A’ Water analysis Building 184 3rd Floor To Be Determined Upon Contract Award

(End of Summary of Changes)