ATT-18_N4044327Q0003 Q and A.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
USNS KAISER (T-187 Ultrasonic Gauging Hull Special Survey 8)
Solicitation number
N4044327Q0003
Issued by

About this file

This is a Questions and Answers document published on November 19, 2026, addressing inquiries from potential offerors regarding Solicitation N4044327Q0003 for ultrasonic gauging hull special survey services on the USNS KAISER (T-187). The Q&A clarifies that Controlled Unclassified Information (CUI) applies to all project materials and contractor-generated documentation. Key procedural clarifications include: the Responsible Port Engineer designation will be made post-award; access paperwork cannot begin before award despite the November 28 start date; offerors must submit the Technical NDA (ATT-5) to the Contracting Officer before receiving references; and two performance locations and Periods of Performance are confirmed, not one as initially indicated in the RFQ. The document directs offerors to REV-1 of ATT-1 and ATT-6 for multiple technical corrections and clarifications regarding work item specifications, including issues with winch equipment foundation gauging parameters, missing reference 2.11, coating repair specification conflicts, and the location of General Technical Requirements (provided as ATT-17). The MSCREP contact for receiving readings, daily reports, and final reports will also be designated post-award. All other terms and conditions of the solicitation remain unchanged.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q and A

N4044327Q0003 ~ Question and Answers
Date of publication:Thursday, November 19, 2026
Note: The following are answers to questions received from potential offerors.
NumberWI NBRWI Paragraph / Ref SectionQuestionAnswer
10100NACould you please confirm whether any information, materials, or deliverables associated with this project will contain or be subject to CUI, ITAR, EAR, or other export-controlled requirements?CUI applies.
20100NAWho is the designated Port Engineer for USNS KAISER?

Designation of Responsible Port Engineer (PE) will be made post-award. See REV-1 to RFQ N4044327Q0003 (ATT-6).

3 0100 NA May the access paperwork begin before award, given the November 28 start?

No. See REV-1 to RFQ N4044327Q0003 (ATT-6).

4 0100 2.0 Please provide all references.

Offerors need to fill ou and submit ATT-5 Technical NDA to Contracting Officer before references can be provided. See Paragraph 5 in ATT-6, REV-1 for details.

5 0100 NA RFQ indicates one performance location and POP while the WI indicates two. Plase clarify.

Two performance locations and POPs are confirmed. See REV-1 to ATT-1 and ATT-6 for details.

6 0100 7.9 Are the winch equipment foundations listed in Section 7.9 of the work item specification to be gauged within the 35,000-shot maximum, and what number of shots or extent applies to each foundation, since the specification lists them

without a stated quantity?See REV-1 to ATT-1 for correction & details.
701007.8

Section 7.8 of the work item specification refers to "reference 2.10 and 2.11", but Section 2.0 lists references only through 2.10. What is reference

2.11?See REV-1 to ATT-1 for correction & details.
801007.11Section 7.11 directs coating repair with the systems specified in reference

2.9, which is the ABS Rules, while the MSC Paint Schedule is reference 2.8.

Which reference governs coating repair?See REV-1 to ATT-1 for correction & details.
901005.1Which General Technical Requirements apply under Section 5.1 of the work

item specification, and where can they be obtained, since none is attached to

the solicitation documents?See GTR provided as ATT-17
100100NAWho is the MSCREP contact for sending readings, daily reports and final

report copies, since the solicitation names none?

Designation of Responsible Port Engineer (PE) will be made post-award. See REV-1 to RFQ N4044327Q0003 (ATT-6).

10 10 10 10 10