This is a Performance Work Statement (PWS) for ultrasonic gauging services on the USNS KAISER (T-AO 187), a single-hull tanker operated by the Department of the Navy Military Sealift Command.
The contractor must provide ABS-approved ESP Hull Gauging firm services to obtain and record 35,000 ultrasonic thickness readings on the vessel's hull, bulkheads, deck plating, scantlings, piping, and other structural areas in accordance with ABS Special Hull Survey No. 8 for Single Hull Tankers in the Enhanced Survey Program. Work will occur at two performance locations and periods: Naval Air Station North Island in San Diego, California (December 3-16, 2026) and Vigor Shipyard in Portland, Oregon (January 19 – February 2, 2027), with seven consecutive days of dry dock gauging required at the second location. The contractor must provide a certified marine chemist to gas-free 36 cargo and ballast tanks and a qualified competent person for air quality testing throughout the performance periods. Key deliverables include daily reports of ultrasonic readings cross-referenced to locations, electronic copies submitted to ABS and MSCREP within five business days of each performance period completion, composite drawings showing measurement locations relative to frame numbers and structural members, and a final typewritten report in ABS-acceptable format submitted within ten business days. The contractor will employ SPRAT or IRATA-certified rope access personnel (including at least one Level 3 supervisor) equipped with GoPro camera systems, communications equipment, and minimum 100 fc headlamp lighting to access hard-to-reach areas. The contractor must provide all ultrasonic equipment acceptable to ABS, calibrate instruments on-site with certified blocks, repair all disturbed coatings using specified paint systems, and perform work between 0800 and 1900 hours daily. Compensation is on a unit price basis per ultrasonic shot up to the 35,000-shot maximum, with the actual quantity determined by ABS requirements.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS KAISER
(T-AO 187)
| HULL AND STRUCTURAL |
| N4044327Q0003 |
| ITEM NO. 0100 REV-1 |
| CATEGORY "A" |
| 2026-04-29 |
| PWS ROPING AND ULTRASONIC GAUGING SERVICES ESP HULL SPECIAL SURVEY 8 |
| C. Crawford |
1.0 ABSTRACT:
Provide the services of an ABS approved ESP Hull Gauging firm to take and record ultrasonic thickness readings on ship's hull, bulkheads, deck plating, scantlings, piping, and in other areas throughout the ship as required by the MSCREP, USCG, and ABS Surveyor. The requirements of the ABS Special Hull Survey No.8 for Single Hull Tankers in the Enhanced Survey Program shall form the basis for this item.
2.0 REFERENCES/ENCLOSURES:
2.1. NAVSEA Dwg No. 6630531 - General Arrangement Outboard Profile.
2.2. NAVSEA Dwg No. 5904162 KAISER GENERAL ARRANGEMENT INBOARD PROFILE.
2.3. NAVSEA Dwg No. 6630527 General Arr. Tanks and Flats AFT FR 60
2.4. NAVSEA Dwg. No. 5903954 - Scantling Sections.
2.5. NAVSEA Dwg No. 5751075 - Shell Expansion Scantlings.
2.6. NAVSEA Dwg. No. 8388193 - General Arrangement
2.7. NAVSEA Dwg. No. 801-5904296 - Capacity Plan.
2.8. NAVSEA Dwg. No. 631-6240525, MSC “Paint Schedule”.
2.9. ABS Rules for Building and Classing Steel Vessels, Part 7, Rule Requirements for Survey After Construction Part 7, Chapter 3 Section 2. Tanker ESP (requirements for Special Hull Survey No. 8).
2.10. ESP PROGRAM Special Hull Survey No. 8 – USNS HENRY J. KAISER (T-AO 187).
3.0 ITEM LOCATION/DESCRIPTION:
3.1. Location/Quantity:
3.1.1. Location: Various locations throughout the vessel.
3.1.2. Quantity: 35,000 UT readings (total for all items)
3.2. Item Description/Manufacturer's Data: None
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES/INFO:
4.1. GOVERNMENT FURNISHED EQUIPMENT: None.
4.2. GOVERNMENT FURNISHED MATERIAL: None.
4.3. GOVERNMENT FURNISHED SERVICES: None.
4.4. GOVERNMENT FURNISHED INFO: None.
5.0 NOTES:
5.1. The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors must comply with all applicable GTRs.
5.2. There will be two (2) performance locations and POPs as follows:
5.2.1. First POP & Location
5.2.1.1. Naval Air Station North Island (NASNI) San Diego, CA. Thursday, 3 December 2026 through Wednesday, 16 December 2026.
5.2.2. Second POP & Location
5.2.2.1. Vigor Shipyard in Portland, Oregon (5555 N. Channel Avenue, Portland, OR 97217-7655). Tuesday, 19 January 2027 through Tuesday, 2 February 2027. Dry Dock Gauging, 7 consecutive days required during POP. No roping access services required at Vigor Shipyard.
5.3. Cleaning of cargo and ballast tanks will be accomplished by Ship’s Force
6.0 QUALITY ASSURANCE REQUIREMENTS: Refer to Paragraph 7.0
7.0 STATEMENT OF WORK:
7.1. Contractor shall provide a certified marine chemist to gas free thirty-six (36) cargo and ballast tanks, throughout the period of performances for tank surveys and thickness gauging including overtime hours, weekends and holidays. Contractor shall provide a qualified competent person to perform air quality testing of the tanks atmospheres throughout the day as required after the initial gas free of the tanks has been certified by the certified marine chemist.
7.2. Provide all labor, materials and equipment to satisfy the requirements of ABS Special Hull Survey No. 8 for Non-Double Hull Tankers in the Enhanced Survey Program (ESP) and to obtain and record 35,000 ultrasonic thickness readings using references 2.1 through 2.10 as guidance. This is to be worked in-conjunction with ABS close-up survey of the tanks and voids.
7.3. The thickness measurements shall be carried out by an ABS recognized ESP Hull Gauging Firm according to the principles stated in Section 7-A-5 of reference 2.10. The qualifications of the ABS approved ESP Hull Gauging Firm shall be provided to the MSCREP prior to the start of the audio gauging.
7.4. The contractor is to provide a unit price per shot up to a maximum of 35,000 Shots. Number of shots will be determined by quantity required by ABS. The unit price is to be used for decreasing the scope of the item as it relates to the number of shots required by ABS.
7.5. The contractor shall employ rope access personnel for the Ultrasonic Technician to direct probe (transducer) placement for the purpose of obtaining material thickness and/or positioning of a video feed for the attending Surveyor or the Level II Technician to assess the condition.
7.5.1. Rope Access:
7.5.1.1. Rope Access certified contractor personnel shall perform all rope access rigging, climbing and Rope Access in accordance with their procedure documents and regulatory requirements.
7.5.1.2. Rope access personnel shall be fitted with a GoPro camera system mounted to their approved hard hat.
7.5.1.3. Rope Access personnel shall be fitted with Rope Access contractor provided communications.
7.5.1.4. Ultrasonic Level II UT Technician shall calibrate the ultrasonic unit in accordance with the applicable procedure or Classification requirements with contractor provided transducer, coax cable, ultrasonic unit, and calibration standard.
7.5.1.5. Rope Access personnel shall be instructed by the Level II UT Technician and/or Class Surveyor which specific structure requires access for UTT gauging and/or visual close-up inspection and shall be briefed on the general visual inspection to be covered while live streaming to the Level II UT technician and/or Class Surveyor video monitor.
7.5.1.6. Rope Access personnel shall perform final equipment check including video, communications, lighting, and Rope Access rigging.
7.5.1.7. Rope Access personnel shall have access to the structure requested. During the traversing to the structure, the Rope Access personnel shall take direction from the Level II UT Technician and/or Class Surveyor for any suspect adjacent structure in which a closer or detailed visual inspection and possible UT gauging is desired. The Rope Access personnel shall maneuver the GoPro video camera as directed by the Level II UT Technician and/or Class Surveyor to provide clear visual inspection on the video monitor. The video monitor system shall be capable of recording or a capturing a still image of any requested suspect area if so needed.
7.5.1.8. When the Rope Access personnel are instructed, they shall clean (as required) the UT location, apply ultrasonic Couplant to the specified location, and position the ultrasonic transducer to the specified location while the Level II UT Technician interprets the signal on the ultrasonic unit. The Level II UT technician shall record the thickness readings and shall instruct the Rope Access personnel how to mark the structure (if required).
7.5.1.9. The Rope Access personnel shall not make any evaluation of the structure unless specifically asked by the Surveyor for an opinion of condition and/or should the Rope Access personnel identify a safety concern affecting the Rope Access process.
7.6. Surface prep areas as required to obtain ultrasonic thickness readings.
7.7. Provide and set up lighting as needed (i.e. drop lights or flood lights) when surveying tanks.
7.8. Contractor shall take thickness measurements in all locations detailed in reference 2.9 and 2.10 and summarized as follows:
7.8.1. Three transverse sections within cargo block (at least 1 ballast tank).
7.8.2. Fore Peak and Aft Peak internals (including plating and stiffeners of tank bulkheads) Structural members subject to close-up survey.
7.8.3. All transverse web frame rings in each ballast tank and in one (1) wing COT.
7.8.4. One (1) transverse web frame rings in each remaining wing COT.
7.8.5. 30% of deck & bottom transverses in all center tanks.
7.8.6. All transverse bulkheads in each BWT and COT.
7.8.7. All deck plating in cargo area and on exposed decks (main deck & tier 1 superstructure).
7.8.8. Suspect areas: including, but not limited to, beneath all BWT and COT low suctions.
7.8.9. All plating in wind-and-water strakes (port and starboard full length).
7.8.10. All keel and bottom plating (full length).
7.8.11. Plating of sea chests. Shell plating in way of overboard discharges as considered necessary by the attending Surveyor.
7.9. Perform additional ultrasonic thickness readings on the following equipment foundations and structures (MSC REF AR19-0001):
7.9.1. No.1 FAS STA NST SPANWIRE WINCH Perform 100 UT readings in standard 1 SQFT grid.
7.9.2. No.2 FAS STA NST SPANWIRE WINCH Perform 100 UT readings in standard 1 SQFT grid.
7.9.3. No.3 RAS STA NST HIGHLINE WINCH Perform 100 UT readings in standard 1 SQFT grid.
7.9.4. No.4 RAS STA NST HIGHLINE WINCH Perform 100 UT readings in standard 1 SQFT grid.
7.9.5. No.6 FAS STA NST SPANWIRE WINCH Perform 100 UT readings in standard 1 SQFT grid.
7.9.6. No.7 FAS STA NST SPANWIRE WINCH Perform 100 UT readings in standard 1 SQFT grid.
7.9.7. No.8 FAS STA NST SPANWIRE WINCH Perform 100 UT readings in standard 1 SQFT grid.
7.9.8. No.3 RAS STA NST HAUL WINCH Perform 100 UT readings in standard 1 SQFT grid.
7.9.9. No.4 RAS STA NST HAUL WINCH Perform 100 UT readings in standard 1 SQFT grid.
7.9.10. No.1 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.9.11. No.2 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.9.12. No.3 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.9.13. No.4 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.9.14. No.5 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.9.15. No.6 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.9.16. No.7 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.9.17. No.8 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.9.18. No.9 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.9.19. No.10 GYPSY WINCH Perform 30 UT readings in standard 1 SQFT grid.
7.10. Upon completion of each POP, provide electronic copies of the readings to ABS and MSCREP within 5 business days.
7.10.1. The contractor shall develop a composite drawing of locations of each reading in relation to the frame numbers, seams and butt welds, plating, and internal structural members.
7.10.2. After completion of all thickness measurements required, a typewritten report is to be prepared in ABS acceptable format in accordance with ABS Rules and Regulations and to the satisfaction of Local ABS Surveyor. Three (3) copies are to be submitted to the MSCREP. The report shall give the location of measurements, the thickness measured as well as the original thickness, and the percentage of wastage. The measuring equipment type, calibration certification and names of the persons taking the measurements and their qualifications shall also be included in the report. This final report shall be completed and delivered within ten (10) business days of completion of all gauging’s required for Special Hull Survey No. 8.
7.10.3. Required by the USCG, ABS, and MSCREP:
7.10.3.1. Provide daily reports of the ultrasonic readings taken the previous day. One (1) copy of each report shall be provided to the MSCREP and ABS. These reports shall cross reference each ultrasonic reading to the location from which it was recorded.
7.11. The contractor shall repair all coatings disturbed during the accomplishment of this work item. The disturbed areas shall be coated with the systems specified in reference 2.8 using the paint product data sheets for surface preparation, environmental condition requirements, and dry film thickness.
8.0 GENERAL REQUIREMENTS:
8.1. The gauging company shall be available to obtain initial gaugings required for the Special Hull Survey No. 8 as per ABS requirement during each of the Period of Performances between the hours of 0800 and 1900.
8.2. The Ultrasonic and/or Close-Up inspection shall be performed in conjunction using Remote Access, an alternative method to physically access the vessel structure requiring inspection. Remote access the vessel structure means the location of the structure to be inspected is such that the structure is not easily accessible and staging or rafting is required to access the structure. In lieu of staging and rafting, the contractor shall employ Rope Access personnel for the Ultrasonic Technician to direct probe (transducer) placement for the purpose of obtaining material thickness and/or positioning of a video feed for the attending Surveyor or the Level II Technician to assess the condition.
8.3. All personnel conducting Rope Access shall be qualified and certified by Society of Professional Rope Access Technicians (SPRAT) or International Rope Access Trade Association (IRATA) with at least one Level 3Technician (Rope Access Supervisor) in accordance with SPRAT/IRATA Certification Requirements and shall be approved by the Client to provide Rope Access.
8.4. All audio gauging equipment shall be acceptable for use by the American Bureau of Shipping.
8.5. Use of a coax cable long enough (II-01-5002 8.2.2) to permit remote access placement of the transducer as directed by the Level II UT Technician so that the Level II UT Technician remains in control of the Ultrasonic Equipment is required.
8.6. Video Equipment shall be at a minimum a GoPro Hero 4 Model with 4K30, 1080p Video and 12MP Photo 30 fps capture ability with Bluetooth capability for monitoring.
8.7. Video Monitor used for remote viewing during inspection shall be capable of displaying GoPro live footage and a minimum screen of 8”.
8.8. Lighting shall at a minimum be a headlamp affixed to the remote access hard hat or helmet capable of producing a minimum of 100 fc.
8.9. Communications shall be provided by the remote access contractor (Rope Access company).
8.10. Rope Access Equipment shall be provided by the contractor and comply with all safety regulations.
8.11. The gauging instruments shall be calibrated on site with certified blocks acceptable to the ABS Surveyor. The ABS Surveyor shall recheck the measurements as deemed necessary to ensure acceptable accuracy.
8.12. All tank gauging shall be accomplished by closely coordinating with ship’s force, MSCREP and the contractor.
WI-0100, REV-1, Page - 7