7593597 Amendment 0001.pdf
PDF 318 KB Posted
- Solicitation number
- N400857593597
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a construction project at Marine Corps Air Station Cherry Point, North Carolina. The solicitation, issued by CG MCAS Cherry Point Facilities ROICC on July 28, 2026, pertains to the refurbishment of Barrack Facilities, Buildings 4168 and 4169 (Requisition/Purchase Request No. 7593597). Amendment 0001 addresses two pre-award Requests for Information (RFI) submitted by prospective offerors and clarifies staffing requirements for the project.
The amendment updates the Notes section of the original Request for Proposal to specify that one person per building may serve in a triple-hat capacity as Quality Control, Superintendent, and Site Safety Health Oversite. This clarification resolves a discrepancy between the work order, which allowed one person to fill all three roles, and the original RFP, which specified two separate positions. The amendment also confirms that the deadline for submitting pre-award RFIs remains August 3, 2026 at 12:00 PM, and the proposal due date of August 14, 2026 at 12:00 PM local time remains unchanged. All other contract terms and conditions remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7593597 Amendment 0003.pdf | ||
| 7593597 Amendment 0002.pdf | ||
| 7593597 Master PPI Form.xlsx | XLSX spreadsheet | |
| 7593597 RFP.pdf | ||
| 7593597 SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 07/28/2026 7593597
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION Refurbish Barrack Facilities, Buildings 4168 and 4169
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7593597 Refurbish Barrack Facilities, Buildings 4168 & 4169, Marine Corps Air Station Cherry Point, NC
Amendment 0001 is being issued to answer pre-award RFI’s.
The deadline to submit pre-award RFI’s REMAINS 03 August 2026 at 12:00 PM.
The proposal due date of 14 August 2026 at 12:00 PM local time REMAINS unchanged.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
PREAWARD INQUIRY FORM
PAGE SECTION PARAGRAPH
1 7/14/2026 1 RFP Please provide the governments estimated cost range for the project. This information is requested to determine whether a bid bond will be required. Because requesting a bid bond on the day of bid submissions creates uneccessary risk and may not allow sufficient time for our surety to issue the bond, advance notice of the estimated cost range will help ensure compliance with the Bond Requirements, which require the bid bond to be submitted alongside the proposal.
FAR 36.204 Disclosure of the magnitude of construction projects has been removed by the Revolutionary FAR Overhaul (DARS 2026-O0019).
As a result, the Government will no longer be providing magnitudes on construction projects; please bid accordingly and submit bid bonds accordingly.
2 7/15/2026 Work order states one person can serve as Quality Control, Superintendent, and Site Safety Health Oversite. RFP states two person, one for superintendent / Quality Control and one for Site Safety Health Oversite. Which is correct?
One person per building, as stated in the Work order both building can be worked on at the same time but only one floor at a time, if the CTR is only working on one building then only one person is required.
POSTED ON
AMENDMENT #PPI #
REFERENCE
QUESTION GOVERNMENT RESPONSEDATE
SUBMITTED
July 2011
Refurbish Barracks Facilities, Building 4168 & 4169 Amendment 0001 MCAS Cherry Point, North Carolina Project No. 7593597
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. This amendment updates the Notes section provided in the original Request for Proposal to the following:
Notes: One person PER BUILDING may triple hat Quality Control, Superintendent, and Site Safety Health Oversite.
B. All other contract terms and conditions remain unchanged.
| CHERRY POINT, NC 28533 |
| AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL |
File details come from the government source that posted it. Updated .