Amendment 0004 for the Scuff and Refresh project at Marine Corps Air Station Cherry Point, NC provides responses to pre-award Request for Information (RFI) questions and updates technical specifications. The amendment specifically addresses a plumbing detail for a sump pump basin, revising drawing NAVFAC No. 12925761 P-501 to specify a 36-inch diameter by 120-inch deep fiberglass basin with a foot traffic-rated cover. The proposal due date remains unchanged at 08 July 2025 at 4:00 PM local time, and no further RFIs will be accepted. The amendment is part of work order 7402794 for site preparation related to F-35 and V-22 TAMS Interim Repair Facility (IRF) at the military installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003 7402794.pdf | ||
| Amendment 0002 7402794.pdf | ||
| Amendment 0001 7402794.pdf | ||
| RFP 7402794.pdf | ||
| 7402794 7493600 SpecsAsOne.pdf | ||
| 7402794 7493600 DrawingsAsOne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION
7402794 Scuff and Refresh
MCAS Cherry Point, NC
AMENDMENT #0004
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0004 07/07/2025 7402794
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
Scuff and Refresh
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7402794 Scuff and Refresh, Marine Corps Air Station Cherry Point, NC
Amendment 0004 is being issued to answer pre-award RFI’s.
The deadline to submit pre-award RFI’s has passed. No further RFI’s will be accepted.
The proposal due date 08 July 2025 at 4:00 PM local time REMAINS unchanged.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Amendment 0004 7402794 Scuff and Refresh
RFI Responses:
1. On Plumbing drawing P‐501 Detail Am Sump Pump Basin it calls for a 36x120 “polymer” basin. That word makes me think a plastic basin, but I’m not aware of a poly basin manufacturer that makes them that deep. Fiberglass is no big deal, except that, for the cover to be traffic rated, per the drawing, you’d need a 6” or 8” thick concrete pad around the basin, so the vent & inlet as listed on the drawing will have to be below the concrete pad. Would that be acceptable?
Response:
Sump Pump Basin Detail A3/P‐501 on NAVFAC Drawing No. 12925761 has been revised to reflect a fiberglass basin with a foot traffic rated cover.
2. If a fiberglass sump basin is not acceptable, what is the brand/model number of a polymer tank that is used as the basis of design?
Response:
Sump Pump Basin Detail A3/P‐501 on NAVFAC Drawing No. 12925761 has been revised to reflect a fiberglass basin with a foot traffic rated cover.
Subj: AMENDMENT TO WO 7402794 Site Prep for F35 Scuff and Refresh IRF 7493600 Site Prep for FRCE V-22 TAMS IRF, MCAS CHERRY POINT NC
CONTINUATION SHEET
PROJECT TABLE OF CONTENTS
DOCUMENT 00 01 15
1.2 CONTRACT DRAWINGS
The following drawings are revised as of 3 JUL 2025:
NAVFAC DWG NO. TITLE
12925761 P-501 DETAILS & SCHEDULES
These drawings accompany this Amendment.
SANITARY PIPE
GAS TIGHT FOOT TRAFFIC COVER
FIBERGLASS STRUCTURE
36" DIA x 120" DEEP
3" DIA OPENING TO SERVE SP VENT
PIPING, SEE PLANS FOR ORIENTATION
2" DIA OPENING TO SERVE SP DISCHARGE
PIPING; SEE PLANS FOR ORIENTATION
2" PW SIDE OUTLET;
SEE PLANS FOR
LOCATION.
SPECIFICATIONS:
1. MOLDED POLYETHYLENE OIL INTERCEPTOR WITH BUILT-IN FLOW CONTROL, ADJUSTABLE COVERS, REMOVABLE BAFFLE ASSEMBLY, DEEP SEAL TRAP WITH CLEANOUT.
2. PROVIDE 2" AND 4" PLAIN END FITTINGS FOR CONNECTION OF WASTE AND VENT PIPING.
3. PROVIDE TRAFFIC RATED COVERS WITH EXTENSION AS REQUIRED TO MAKE COVERS LEVEL WITH
GRADE.
4. INSTALL PER MANUFACTURERS INSTRUCTIONS.
5. REFER TO OIL INTERCEPTOR SIZING PROCEDURE, THIS SHEET, FOR CAPACITY.
FLANGED INLET, REFER TO DRAWINGS FOR SIZE
FLANGED OUTLET, REFER TO DRAWINGS FOR SIZE
2" VENT, FLANGED
MANWAY
INSPECTION/SKIMMER HATCH
SLUDGE BAFFLE
INLET BAFFLE
COALESCING MEDIA
OIL RETENTION BAFFLE
WEIR WALL
3 9
5 44
SET TOP 1" ABOVE
FINISH GRADE
CLEANOUT COVER FINISH GRADE
CONCRETE PAD
4"4"
GROUND CLEANOUT
18"
CONCRETE PAD
SANITARY SEWER PIPE
CAPACITY
VOLUME FLOW INLET OUTLET
TAG (GAL) (GPM) SIZE (IN) SIZE (IN) MOUNTING REMARKS
OI-1 2,000 250 4 4 RECESSED SEE NOTES
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. SEE OIL INTERCEPTOR DETAIL AND SIZING SCHEDULE.
OIL INTERCEPTOR SCHEDULE
OIL INTERCEPTOR SIZING SCHEDULE
OIL/WATER COLLECTION AREA
1,960
12,443 SF 129.4 9681
QTY.
GRAND TOTAL CAPACITY (GAL)
TOTAL CAPACITY
(GAL)
12,763 SF 132.6 9921
MV-22 TAMS IRF HANGAR 102
MV-22 TAMS IRF HANGAR 101
TOTAL
COLLECTION AREA
CUBIC FT PER
COLLECTION AREA
MV-22 TAMS IRF HANGAR 101: TOTAL COLLECTION AREA = 12,76. SF
TOTAL CAPACITY = (12,763 SF - 100) / 100 + 6 = 132.6 CF x 7.48 = 992 GAL
MV-22 TAMS IRF HANGAR 102: TOTAL COLLECTION AREA = 12,443 SF
TOTAL CAPACITY = (12,443 SF - 100) / 100 + 6 = 129.4 CF x 7.48 = 968 GAL
INTERCEPTOR SIZING BASED ON INTERNATIONAL PLUMBING CODE (IPC) SECTION 1003.4.2.2..
A I
N I
G
RI
VFOHTLAE
W
N O
M M
O C
P R
O F
E
SS I ONAL ENG
I N E
E R
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXMO WORK ORDER NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L K
V
A
AS NOTED
24239
JASON A. KULENGUSKI
Lic. No. 052876
06−13−2025
/3
/2
:5
:4
P M
C U s e rs \z
-2
H
\D o c u m e n ts
\2
P lu m b in g
S it e a n d re w b C
W
L V
.r v t
P-501
F -3
S
C U
F F
A N
D R
E F
R E
S H
M V
-2 P
M I
F A
C
IL
IT
Y
D E
T A
IL
S
A N
D S
C H
E D
U L E
S
DBBADB ADB
10/25/24
7402793
N40085-24-D-0011
C H
E R
R Y
P O
IN
T
N
O R
T H
C A
O L
IN
A U
.S
M A
R
IN
E C
O R
P S
A
IR
S T
A T
IO
N
M
ID
L A
N T
D C
C O
R E
P -5
12925761
SCALE: 12" = 1'-0"
SUMP PUMP BASIN DETAIL
A3
SCALE: 12" = 1'-0"
OIL INTERCEPTOR DETAIL
C3SCALE: 12" = 1'-0"
GRADE CLEANOUT DETAIL
C2
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A
M E
N D
M E
N T
/0 3/
| 12925761.pdf |
| Sheets |
| P-501 - DETAILS AND SCHEDULES |
File details come from the government source that posted it. Updated .