AMENDMEND 0003.pdf

PDF 280 KB Posted

Attached to
P253 Library
Solicitation number
N400857394134
Issued by

About this file

This document is an amendment to a solicitation for a contract to construct a library at the Marine Corps Air Station Cherry Point in North Carolina. Amendment 0003 was issued to respond to pre-award Requests for Information (RFIs) received regarding the project. The key details are:

The deadline to submit RFIs has passed, and no further RFIs will be answered. The proposal due date of June 18, 2024 at 3:00 PM local time remains unchanged. The amendment provides responses to several specific RFI questions, including clarifying that Section 10 23 39 for folding panel partitions is deleted, providing drawing references for window shades and finishes, and confirming the requirements for fire-rated doors and impact-resistant exterior doors. The contract is for the P253 Library project and is restricted to the General MACC contractors listed in the original solicitation from the Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
AMENDMENT 0002.pdf PDF
Amendment 0001 7394134.pdf PDF
RFP - 7394134.pdf PDF
7394134 SpecAsOne - Vol 2 Appendix A.pdf PDF
7394134 DrawingsAsOne SIGNED.pdf PDF
7394134 SpecAsOne - Vol 1 SIGNED.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC

SPECIFICATION

7394134 P253 Library

MCAS Cherry Point, NC AMENDMENT

#0003

IMPORTANT

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.

If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 6/12/2024 7394134

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

CG MCAS Cherry Point

FACILITIES, ROICC

B-163, CURTIS ROAD

PSC BOX 8006

CHERRY POINT, NC 28533

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF

P253 Library

9B. DATED (SEE ITEM 11)

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

7394134 P253 Library, Marine Corps Air Station Cherry Point, NC

Amendment 0003 is being issued to respond to pre-award RFI.

The deadline to submit pre-award RFI’s HAS PASSED. No further RFI will be answered.

The proposal due date of 18 June 2024 at 3:00 PM local time REMAINS unchanged.

See Attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

Amendment 0003 7394134 P253 Library

RFI Responses:

1. 10 23 39 On the P253 Library job there are specs for Folding Panel Partitions (102239), however, I do not see one on the plans. Can you confirm whether a folding partition is required?

Response:

Section 10 23 39 is deleted. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

2. 12 00 00 I have window sizes and quantities. I don't know which windows get what.

I am guessing the exterior windows are getting the single shades and meeting rooms are getting the double shades. But I don't know the sizes of the windows in the meeting rooms or exterior either.

Response:

See Drawings 12907848 and 12907872. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

3. 05 00 00 The are no indicators or specs as to what type of finish if any is applied to exterior or interior railings could this be clarified? Structural steel columns l‐502 have no indicators or specs as how to finish please clarify?

Response:

Reference Amendment 0001. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

4. 08 00 00 Per the Bid Documents, Fire Rating is missing in the Door Schedule (Reference Sheet number A‐601 dated 08/25/2020). Please provide updated information.

Response:

See Drawing 12907843. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

5. 08 00 00 Per the Bid Documents, Division 8 Specifications, (Reference Section 08 41 13, Aluminum Doors and Frames, Page 5) show Impact Resistant Doors. Please clarify Exterior Doors are considered as Impact Resistant or Not.

Response:

See Specification Section 08 41 13. Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

6. 23 00 00 What is the base wide EBCS?

Response:

Amendment 0003 7394134 P253 Library

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

7. 23 00 00 Is BACNET IP Acceptable of is only BACNET MSTP controllers permitted?

Response:

Submit proposals in accordance with RFP, Specifications, Drawings, and all amendments.

Amend 3 cover
Amend Cover
Amendment Page 2

RFI 5 responses

File details come from the government source that posted it. Updated .