7394134 SpecAsOne - Vol 1 SIGNED.pdf

PDF 11 MB Posted

Attached to
P253 Library
Solicitation number
N400857394134
Issued by

About this file

This document appears to be a signed Volume 1 of a specification for the P253 Library procurement (Solicitation Number N400857394134) issued by the Department of the Navy Naval Facilities Engineering Command.

The solicitation is a restricted procurement, open only to the General MACC contractors listed in the cover letter. The scope of work and any applicable drawings are provided in the attached documents. No further details about the required products or services are included in this particular file. This document does not contain a Performance Work Statement, Statement of Objectives, or other key details about the contract requirements. It appears to be a standalone specification document related to the federal contract opportunity.

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
AMENDMEND 0003.pdf PDF
AMENDMENT 0002.pdf PDF
Amendment 0001 7394134.pdf PDF
RFP - 7394134.pdf PDF
7394134 SpecAsOne - Vol 2 Appendix A.pdf PDF
7394134 DrawingsAsOne SIGNED.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATION PREPARED BY:

DARDEN J. EURE, III, MBF ARCHITECTS

20 MAY 2024

SPECIFICATION APPROVED BY:

Design Director: _____________________________________________

PATRICK FAULKNER, PE

Date: ___________________

20 May 2024

VOLUME 1 of 2 (Division 01 - 33)

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, MID-ATLANTIC

MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA

P-253 CONSTRUCT LIBRARY

AT THE

MARINE CORPS AIR STATION

CHERRY POINT, NORTH CAROLINA

STATION PROJECT NO: 7394134

DESIGNED BY:

MBF ARCHITECTS, PA

317-C POLLOCK STREET

NEW BERN, NORTH CAROLINA 28560

LEAD & ASBESTOS TESTING: ECS CAROLINAS, LLP

CIVIL: AVOLIS ENGINEERING, P.A.

STRUCTURAL: KAYDOS-DANIELS ENGINEERS, PLLC

INTERIOR DESIGN: WITHIN INTERIOR DESIGN

FIRE PROTECTION: JENSEN HUGHES

MECHANICAL/PLUMBING/ELECTRICAL: J P HARVET ENGINEERS

AUDIO/VISUAL: THORBURN ASSOCIATES, INC

LANDSCAPING: STANTEC CONSULTING SERVICES

This page is intentionally left blank.

P-253 Construct Library Station Project No. 7394134 MCAS, Cherry Point, NC 20 May 2024

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/24 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 02/24 SUMMARY OF WORK

01 14 00 11/22, CHG 1: 02/23 WORK RESTRICTIONS

01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES

01 30 00 11/20, CHG 3: 08/23 ADMINISTRATIVE REQUIREMENTS

01 30 02.00 22 05/23 DESIGN, PROCUREMENT, AND INSTALLATION

OF AUDIOVISUAL EQUIPMENT

01 31 23.13 20 08/23 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM (eCMS)

01 32 17.00 20 11/23 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND REPORTING

01 35 26 11/20, CHG 4: 08/23 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 08/23 QUALITY CONTROL

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 01 58 00 01 74 19

08/22 TEMPORARY ENVIRONMENTAL CONTROLS

08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 01 78 23

05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

05/23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 05/23 FACILITY DATA WORKBOOK (FDW)

01 78 30.00 22 02/16 GIS DATA DELIVERABLES

01 91 00.15 05/23, CHG 2: 11/23 BUILDING COMMISSIONING

01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

(CIVIL WORK)

03 45 00 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

PROJECT TABLE OF CONTENTS Page 1

SUBMITTAL REGISTER

HPSB CHECKLIST

SCHEDULE OF FIRE PROTECTION SYSTEM INSPECTIONS

STATEMENT SPECIAL INSPECTIONS

SCHEDULE SPECIAL INSPECTIONS

P-253 Construct Library Station Project No.

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

06 82 14 DECORATIVE FIBERGLASS REINFORCED

PLASTIC (FRP)

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM AIR BARRIERS

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 61 14.00 20 08/16, CHG 1: 08/18 CP STEEL STANDING SEAM ROOFING

07 63 00 03/22 ALUMINUM CORNICES AND TRIM

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 56 00 03/24 DRIVE THROUGH SPECIALTIES

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPET TILE

09 72 00 08/17, CHG 1: 08/18 WALL PROTECTION & DIGITALLY PRINTED

WALL GRAPHICS

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 39 08/20 FOLDING PANEL PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

PROJECT TABLE OF CONTENTS Page 2

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

P-253 Construct Library MCAS, Cherry Point, NC

Station Project No.

20 May 2024

DIVISION 12 - FURNISHINGS

12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT

(FF&E) PACKAGE

12 24 13 08/20 ROLLER WINDOW SHADES

12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 05/22 COMMON PIPING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00 05/23 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING

SYSTEM

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 52 43.00 20 05/15, CHG 2: 08/18 LOW PRESSURE WATER HEATING BOILERS

(UNDER 800,000 BTU/HR OUTPUT)

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 6: 11/22 CHILLED WATER PIPING SYSTEMS

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 41 00 08/23 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

PROJECT TABLE OF CONTENTS Page 3

Station Project No.

20 May 202426 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

31 11 00 11/18 CLEARING AND GRUBBING

31 31 16.13 08/22 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 05/22 AGGREGATE BASE COURSE

32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR

ROADS AND STREETS

32 14 13.13 11/19 INTERLOCKING PRECAST CONCRETE UNIT

PAVING

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13.53 11/21 ORNAMENTAL FENCES AND GATES

32 92 23 04/06, CHG 1: 08/21 SODDING

32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 STORMWATER UTILITIES

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

Station Project No.

20 May 2024DOCUMENT 00 01 15

LIST OF DRAWINGS

02/24

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

NAVFAC SHEET

DWG NO. NO. TITLE

G GENERAL

12907772 G-001 TITLE SHEET

12907773 G-002 SYMBOL LEGEND AND INDEX OF DRAWINGS

GI LIFE SAFETY

12907774 GI001 LIFE SAFETY NOTES AND LEGEND

12907775 GI002 CODE COMPLIANCE SITE PLAN

12907776 GI101 LIFE SAFETY FLOOR PLAN

B BORING LOGS

12907777 B-001 BORING LOGS

12907778 B-002 BORING LOGS

12907779 B-003 SITE PLAN - SETTLEMENT MONITORING

C CIVIL

12907780 C-001 NOTES, LEGEND, AND ABBREVIATIONS

12907781 C-002 CIVIL WORK ITEMS

12907782 C-100 SITE ACCESS PLAN

12907783 CD101 SITE PLAN - EXISTING CONDITIONS AND DEMOLITION

12907784 CS101 SITE LAYOUT PLAN

12907785 CS102 STRIPING AND SIGNAGE PLAN

12907786 CG101 SITE PLAN - STORM DRAINAGE SYSTEM

12907787 CG102 SITE GRADING PLAN

12907788 CG103 ENLARGED SITE GRADING PLAN STORMWATER RETENTION POND

12907789 CG301 STORMWATER RETENTION POND - SECTION AND DETAILS

12907790 CU101 SITE UTILITY PLAN

12907791 CS501 DETAILS

12907792 CS502 DETAILS

12907793 CS503 DETAILS

12907794 CS504 DETAILS

12907795 CG501 DETAILS

12907796 CG502 DETAILS

12907797 CG503 DETAILS

12907798 CU501 DETAILS

12907799 CU502 DETAILS

LS LANDSCAPE ARCHITECTURE

12907800 L-101 SITE LANDSCAPE PLAN

12907801 L-102 COURTYARD LAYOUT PLAN

DOCUMENT 00 01 15 Page 1

Station Project No.

20 May 2024

NAVFAC SHEET

DWG NO. NO. TITLE

12907802 L-501 COURTYARD NOTES AND DETAILS

12907803 L-502 COURTYARD NOTES AND DETAILS

12907804 L-503 LANDSCAPE DETAILS

S STRUCTURAL

12907805 S-001 COVER SHEET

12907806 S-002 STRUCTURAL NOTES

12907807 S-003 STRUCTURAL NOTES

12907808 S-101 FOUNDATION PLAN

12907809 S-102 ROOF FRAMING PLAN

12907810 S-103 FOUNDATION PLAN - CHILLER YARD ENCLOSURE

12907811 S-201 STRUCTURAL SECTIONS

12907812 S-202 STRUCTURAL SECTIONS

12907813 S-203 STRUCTURAL SECTIONS

12907814 S-501 GENERAL CONSTRUCTION DETAILS

12907815 S-502 GENERAL CONSTRUCTION DETAILS

A ARCHITECTURAL

12907816 A-101 FLOOR PLAN - OVERALL

12907817 A-102 FLOOR PLAN - ENLARGED AREA A

12907818 A-103 FLOOR PLAN - ENLARGED AREA B

12907819 A-104 FLOOR PLAN - ENLARGED AREA C

12907820 A-105 FLOOR PLAN - ENLARGED AREA D

12907821 A-106 FLOOR PLAN - ENLARGED AREA E

12907822 A-107 FLOOR PLAN - ENLARGED AREA F-G

12907823 A-108 REFLECTED CEILING PLAN - OVERALL

12907824 A-109 AIR AND MOISTURE BARRIER PLAN

12907825 A-110 ROOF PLAN

12907826 A-201 EXTERIOR ELEVATIONS

12907827 A-202 EXTERIOR ELEVATIONS

12907828 A-301 BUILDING SECTIONS

12907829 A-302 TYPICAL WALL SECTIONS

12907830 A-303 TYPICAL WALL SECTIONS

12907831 A-401 CHILLER YARD PLAN

12907832 A-402 CHILLER YARD ELEVATIONS

12907833 A-403 ENLARGED RESTROOM PLAN AND ELEVATIONS

12907834 A-404 ENLARGED RESTROOM PLAN AND ELEVATIONS

12907835 A-501 WALL TYPE DETAILS

12907836 A-502 MASONRY DETAILS

12907837 A-503 FLASHING DETAILS

12907838 A-504 ROOFING DETAILS

12907839 A-505 ROOFING DETAILS

12907840 A-506 BULKHEAD DETAILS

12907841 A-507 COLUMN ENCLOSURE DETAILS

12907842 A-508 SIGNAGE DETAILS

12907843 A-601 DOOR SCHEDULE

12907844 A-602 DOOR DETAILS

12907845 A-603 DOOR DETAILS

12907846 A-604 INTERIOR STOREFRONT ELEVATIONS

12907847 A-605 INTERIOR STOREFRONT ELEVATIONS

12907848 A-606 WINDOW SCHEDULE AND DETAILS

12907849 A-607 WINDOW DETAILS

12907850 A-608 WINDOW DETAILS

Q EQUIPMENT

12907851 QF101 EQUIPMENT PLAN

DOCUMENT 00 01 15 Page 2

Station Project No.

20 May 2024

NAVFAC SHEET

DWG NO. NO. TITLE

I INTERIOR DESIGN

12907852 I-101 FURNITURE PLAN

12907853 I-102 FINISH PLAN

12907854 I-103 SIGNAGE PLAN

12907855 I-201 INTERIOR ELEVATIONS

12907856 I-202 INTERIOR ELEVATIONS

12907857 I-203 INTERIOR ELEVATIONS

12907858 I-204 INTERIOR ELEVATIONS

12907859 I-205 INTERIOR ELEVATIONS

12907860 I-206 INTERIOR ELEVATIONS

12907861 I-207 INTERIOR ELEVATIONS

12907862 I-208 INTERIOR ELEVATIONS

12907863 I-209 INTERIOR ELEVATIONS

12907864 I-210 INTERIOR ELEVATIONS

12907865 I-301 CASEWORK SECTIONS

12907866 I-302 CASEWORK SECTIONS

12907867 I-303 CASEWORK SECTIONS

12907868 I-304 CASEWORK SECTIONS

12907869 I-305 CASEWORK SECTIONS

12907870 I-501 SIGNAGE DETAILS

12907871 I-502 INTERIOR DETAILS

12907872 I-601 SCHEDULES AND LEGENDS

12907873 I-602 SCHEDULES AND LEGENDS

F FIRE ALARM

12907874 FA001 FIRE ALARM NOTES AND LEGEND

12907875 FA101 FIRE ALARM FLOOR PLAN

12907876 FA501 FIRE ALARM DETAILS

12907877 FA502 FIRE ALARM DETAILS

12907878 FA503 FIRE ALARM DETAILS

F FIRE PROTECTION

12907879 FX001 FIRE SPRINKLER NOTES AND LEGEND

12907880 FX101 FIRE SPRINKLER FLOOR PLAN

12907881 FX501 FIRE SPRINKLER DETAILS

P PLUMBING

12907882 P-001 PLUMBING LEGEND ABBREVIATIONS, AND NOTES

12907883 P-101 FLOOR PLAN - PLUMBING

12907884 P-102 ROOF PLAN - PLUMBING

12907885 P-401 ENLARGED PLANS - SANITARY PIPING

12907886 P-402 ENLARGED PLANS - SANITARY PIPING

12907887 P-403 ENLARGED PLANS - WATER PIPING

12907888 P-404 ENLARGED PLANS - GAS AND WATER PIPING

12907889 P-501 PLUMBING DETAILS

12907890 P-502 PLUMBING DETAILS

12907891 P-503 PLUMBING DETAILS

12907892 P-504 PLUMBING DETAILS

12907893 P-601 PLUMBING SCHEDULES

12907894 P-602 PLUMBING SCHEDULES

12907895 P-901 SANITARY PIPING ISOMETRICS

12907896 P-902 WATER PIPING ISOMETRICS

12907897 P-903 STORM PIPING ISOMETRICS

M MECHANICAL

12907898 M-001 MECHANICAL LEGENDS AND ABBREVIATIONS

12907899 M-002 MECHANICAL DESIGN TABLES

DOCUMENT 00 01 15 Page 3

Station Project No.

20 May 2024

NAVFAC SHEET

DWG NO. NO. TITLE

12907900 MS101 MECHANICAL SITE AND ZONING PLAN

12907901 MP101 FIRST FLOOR PLAN - MECHANICAL PIPING

12907902 MH101 FIRST FLOOR PLAN - MECHANICAL DUCTWORK

12907903 M-301 MECHANICAL SECTION

12907904 M-401 ENLARGED PLANS

12907905 M-501 MECHANICAL DETAILS

12907906 M-502 MECHANICAL DETAILS

12907907 M-503 MECHANICAL DETAILS

12907908 M-601 MECHANICAL SCHEDULES

12907909 M-602 MECHANICAL SCHEDULES

12907910 M-701 CHILLED WATER PIPING DIAGRAM

12907911 M-702 HOT WATER PIPING DIAGRAM

12907912 M-703 HOT WATER PIPING DIAGRAM

12907913 M-801 MECHANICAL CONTROLS

12907914 M-802 MECHANICAL CONTROLS

12907915 M-803 MECHANICAL CONTROLS

12907916 M-804 MECHANICAL CONTROLS

12907917 M-805 MECHANICAL CONTROLS

12907918 M-806 MECHANICAL CONTROLS

E ELECTRICAL

12907919 E-001 ELECTRICAL LEGEND AND ABBREVIATIONS

12907920 ES101 SITE PLAN - LIGHTING PHOTOMETRICS

12907921 ES102 SITE PLAN - ELECTRICAL AND TELECOMMUNICATIONS UTILITES

12907922 ES103 SITE PLAN - ELECTRICAL POWER

12907923 ES501 SITE DETAILS

12907924 ES502 SITE DETAILS

12907925 EL101 FIRST FLOOR PLAN - LIGHTING

12907926 EL501 LIGHTING DETAILS

12907927 EL502 LIGHTING DETAILS

12907928 EL503 LIGHTING FIXTURE SCHEDULES AND LIGHTING DETAIL

12907929 EG101 ROOF PLAN - LIGHTING PROTECTION

12907930 EG501 LIGHTING PROTECTION DETAILS

12907931 EG701 GROUNDING RISER DIAGRAM AND DETAIL

12907932 EP101 FLOOR PLAN - POWER

12907933 EP401 ENLARGED PLANS

12907934 EP501 POWER DETAILS

12907935 EP601 PANELBOARD SCHEDULES

12907936 EP602 PANELBOARD SCHEDULES

12907937 EP701 POWER RISER DIAGRAM

T TELECOMMUNICATIONS

12907938 TN001 TELECOMMUNICATIONS LEGEND AND ABBREVIATIONS

12907939 TN101 TELECOMMUNICATIONS - FLOOR PLAN

12907940 TN401 ENLARGED TELECOMMUNICATIONS PLAN

12907941 TN501 TELECOMMUNICATIONS DETAILS

12907942 TN502 TELECOMMUNICATIONS BACKBONE ELEVATION AND DETAILS

TA AUDIO VISUAL

12907943 TA001 SHEET INDEX AND NOTES

12907944 TA002 RISER DIAGRAMS

12907945 TA101 FIRST FLOOR PLAN - AREA A

12907946 TA102 FIRST FLOOR PLAN - AREA B

12907947 TA103 FIRST FLOOR PLAN - AREA C

12907948 TA104 FIRST FLOOR PLAN - AREA D

12907949 TA105 FIRST FLOOR PLAN - AREA E

12907950 TA106 FIRST FLOOR REFLECTED CEILING PLAN - AREA A

DOCUMENT 00 01 15 Page 4

Station Project No.

20 May 2024

NAVFAC SHEET

DWG NO. NO. TITLE

12907951 TA107 FIRST FLOOR REFLECTED CEILING PLAN - AREA B

12907952 TA108 FIRST FLOOR REFLECTED CEILING PLAN - AREA C

12907953 TA109 FIRST FLOOR REFLECTED CEILING PLAN - AREA D

12907954 TA110 FIRST FLOOR REFLECTED CEILING PLAN - AREA E

12907955 TA301 SECTIONS AND ELEVATIONS

12907956 TA601 SCHEDULES

12907957 TA602 AV FUNCTIONS

12907958 TA603 AV FUNCTIONS

12907959 TA604 AV FUNCTIONS

12907960 TA701 COORDINATION DETAILS

12907961 TA702 COORDINATION DETAILS

12907962 TA703 COORDINATION DETAILS

-- End of Document --

DOCUMENT 00 01 15 Page 5

Station Project No.

20 May 2024

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT 00 01 15 Page 6

Station Project No.

20 May 2024

SECTION 01 11 00

SUMMARY OF WORK

02/24

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Salvage Plan

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes construction of 18,000 SF library and incidental related work.

1.2.2 Location

The work is located at MCAS Cherry Point, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 OCCUPANCY OF PREMISES

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING WORK

Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are

SECTION 01 11 00 Page 1

Station Project No.

20 May 2024discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.5.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.6 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

The Government will furnish the following materials and equipment for installation by the Contractor:

DESIGNATION NO. DESCRIPTION QUANTITY

R-1 Steelheart R2AFS - 2-Door Refrigerator 55" x 33.5" x 79.5"

BC-1 Beverage-Air

CRD4HC-1-B -

Bakery Display Case 49" x 35.5" x 48.5"

C-1 Bunn

AXIOM-TWIN-APS

- Coffee Brewers 23.5" x 16" x 22.2"

EM-1 Seattle's Best Verismo 701 - Espr esso Machines 17" x 30" x 21"

W-1 Everpure Insurice Twin-i20002 Sys tem

EV9324-02 -

Water Filter 25" x 16.5" x 5.5"

SECTION 01 11 00 Page 2

Station Project No. 7394134 20 May 2024

DESIGNATION NO. DESCRIPTION QUANTITY

IM-1 Hoshizaki KM-301BAJ - Ice Machine 30" x 28" x 39"

M-1 Sharp R-24GT - Microwave 20" x 13" x 18.5"

T-1 Waring Commercial

WCT708CND -

Toaster 12.5" x 10.8" x 7.4"

BLDR Vitamix Commercial 68255 - Blende rs 9.3" x 10.5" x 19.4"

FZR Beverage Air

UCF20HC -

Undercounter Freezer 20" x 24.5" x 31"

UCR Traulsen

TU072HT -

Undercounter Refrigerators 72" x 34" x 33.7"

S-2 Advance Tabco

FC-2-2424 -

Double Basin Sink - 53" x 30" x 21"

POS XR7 Point of Sale System - 18.5" x 13.4" x 14"

SECTION 01 11 00 Page 3

Station Project No. 7394134 20 May 2024

Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.

Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.

In addition to the Cafe Equipment listed above, see section 01 14 00 WORK RESTRICTIONS for additional Library Collections and Library Equipment to be relocated from Building 298 to the new Library.

1.6.1 Delivery Schedule

Notify the Contracting Officer in writing at least 15 calendar days in advance of the date on which the materials and equipment are required.

Pick up materials and equipment no later than 30 calendar days after such date.

1.6.2 Delivery Location

The materials and equipment are located at Building 298.

1.7 NAVY AND MARINE CORPS INTRANET (NMCI) COORDINATION REQUIREMENTS

1.7.1 NMCI Contractor Access

Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.

Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.

1.8 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the storage area located within 5 miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

SECTION 01 11 00 Page 4

Station Project No. 7394134 20 May 2024

-- End of Section --

SECTION 01 11 00 Page 5

Station Project No. 7394134 20 May 2024

SECTION 01 11 00 Page 6

Station Project No. 7394134 20 May 2024

SECTION 01 14 00

WORK RESTRICTIONS

11/22, CHG 1: 02/23

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

Library Move Work Plan

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. Buildings 4298 and 3918 will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

b. Contract must provide traffic plan to allow for continued access to Buildings 4298 and 3918. See 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS for more information.

c. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

d. Construction of the Library will include (2) phases of work. Phase 1 includes Settlement Monitoring as detailed in the contract documents and any work not reliant on Settlement Monitoring completion. Assume duration of this phase begins from the award of the contract to 6 months. If monitors indicate settlement is complete, duration may be shortened as approved by the Contracting Officer. Phase 2 includes all construction following Settlement Monitoring. Refer to Geotechnical Report for more information.

e. The Contractor must retain a Qualified Library Moving Subcontractor to relocate the existing Library Collections and Library Equipment in conjuction with construction activites. The Library Moving Subcontractor must submit a detailed Library Move Work Plan that includes handling for the equipment to be relocated. All existing Library Collections and Library Equipment are located in Building 298.

LIBRARY COLLECTIONS (VOLUMES)

822 Audiobooks and Playaways 6000 Nonfiction 2641 Fiction 11000 Juvenile 3500 DVDs 900 Video Games 2000 Young Adult

SECTION 01 14 00 Page 1

Station Project No. 7394134 20 May 2024

LIBRARY COLLECTIONS EQUIPMENT

15 Video Game Consoles 12 Desktop Computers 47 Laptops 661 Craft and STEM Kits 25 Kindles 38 Launchpads 98 Boardgames 45 Camera and Equipment Bags 65 Circulating Kits 191 Storytime Books 50 Cake Pans

LIBRARY EQUIPMENT

3 Desktop Printers 24" x 21" x 17" 2 Photocopiers 54" x 48" x 25" 1 Acucut Machine 300 Acucut Dies 1 Laminator 24" x 8" x 5" 2 Scanners 12" x 10" x 7" 10 Flatbed Scanner 14" x 10" x 2" 2 ProShred Bins 36" x 23" x 16" 1 Paper Guillotine 27" x 20" x 5" 2 Lulzbot 3D Printer 27" x 20" x 20" 1 6' Step Ladder 1 5' Hand Truck 5 Guitars 6 50" - 75" TV Screens 1 Flight Simulator 58" x 52" x 28" (with 3 removable computer screens and a CPU) 1 Free Standing Charging Station 70" x 24" x 20" 4 AWE Kids Computer Stations 24" screen with 12" x 12" x 3" CPU) 1 Lego Table 24" x 15" x 24" 7 Desktop Workstations (24" screen with 12" x 12" x 3" CPU)

f. In addition to relocating the above Library Collections and Equipment, the Contractor must provide 200 Letter/Legal File Storage Boxes with Lids and 15 rolls of packing tape for the Library Staff in Building 298 no later than 45 days prior to new Library Building Occupancy Date. The Contractor will be required to remove the packed 200 boxes from B298 to the areas in the new Library designated by the Contracting Officer.

g. After the completion of the contract as approved by the Contracting Officer, the Contractor will relocate and install the following equipment in the existing Library Cafe in Building 298 to the locations as shown on QF101:

1 2-Door Refrigerator 55" x 33.5" x 79.5" 1 Bakery Display Case 49" x 35.5" x 48.5" 2 Coffee Brewers 23.5" x 16" x 22.2" 2 Espresso Machines 17" x 30" x 21" 1 Stainless Steel Sink 53" x 30" x 37" 1 Water Filter 25" x 16.5" x 5.5" 1 Ice Machine 30" x 28" x 39" 1 Microwave 20" x 13" x 18.5" 1 Toaster 12.5" x 10.8" x 7.4" 2 Blenders 9.3" x 10.5" x 19.4" 1 Undercounter Freezer 20" x 24.5" x 31"

SECTION 01 14 00 Page 2

Station Project No. 7394134 20 May 2024

1 Point of Sale System 18.5" x 13.4" x 14" 2 Undercounter Refrigerators 72" x 34" x 33.7"

This work must be scheduled from Friday at 1700 to Sunday at 2330 so as to not disrupt Building 298 operations.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, including delivery vehicles, are clearly identified with their company name.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.3.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

SECTION 01 14 00 Page 3

Station Project No. 7394134 20 May 2024

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.3.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.3.1.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.3.1.2.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.3.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.2 Working Hours

Regular working hours will consist of an 8 1/2 hour period, between 7 a.m.

and 3:30 p.m., Monday through Friday, excluding Government holidays.

SECTION 01 14 00 Page 4

Station Project No. 7394134 20 May 2024

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number, and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.4 Occupied Buildings

The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm and compressed air are considered utility cutovers pursuant to the paragraph WORK

OUTSIDE REGULAR HOURS.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. Obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection and in accordance with Section 33 30 00 SANITARY SEWERAGE.

1.4 SECURITY REQUIREMENTS

1.4.1 Station Regulations

No employee or representative of the contractor will be admitted to the work site without an Identification Badge or is specifically authorized admittance to the work site by the FEAD, Facilities Engineering & Acquisition Division.

IMPORTANT NOTE: FEAD personnel (Construction Managers, Engineers/Architects, Engineering Technicians, Contract Specialists, or

SECTION 01 14 00 Page 5

Station Project No. 7394134 20 May 2024

Contract Surveillance Representatives) will not receive, process, re-transmit, or otherwise handle IN ANY WAY Personally Identifiable Information (PII) related to the badging process. Do NOT forward any of this information to the FEAD.

1.4.2 Contractor Access to MCAS Cherry Point and Outlying Areas

1. Documentation requirements for granting access to MCAS Cherry Point for commercial and contract employers and employees. This document is an aid in meeting ASO 5560.6B requirements and is not a substitute for the order.

2. The Pass & Identification Office at Building 251 will issue credentials to authorized contractors. Sub-Contractors and suppliers must coordinate through the Prime-Contractor.

3. Criminal Activity. In accordance with ASO 5560.6B, the below list of criminal activities within an applicant's record are considered not in the best interest of the Marine Corps and will be grounds for automatic denial of access aboard the Installation:

a. Conviction for espionage, sabotage, sedition, treason, terrorism, armed robbery, or murder.

b. Felony conviction for a firearms or explosives violation, regardless of the date of conviction.

c. Conviction of crimes encompassing sexual assault or rape.

d. Conviction of crime encompassing child molestation, or the possession or production of child pornography.

e. Conviction of trafficking in persons.

f. Conviction of drug possession with intent to sell or distribute.

g. Convicted of three or more misdemeanor violations, or attempted violations, within the previous 10 years of the following offenses:

(1) Sex crime

(2) Assault

(3) Larceny

(4) Drugs

(5) Weapons

4. Persons requesting access to MCAS Cherry Point will be denied access based on the following:

a. The individual is a registered sex offender.

b. The individual has an active arrest warrant from Federal, State, local, or other civil law enforecement authorities, regardless of offense or violation.

c. The individual has a felony conviction within the last 10 years, SECTION 01 14 00 Page 6

Station Project No. 7394134 20 May 2024 regardless of the offense or violation.

d. The individual's name appears on any Federal or State agency watch list for criminal behavior or terrorist activity.

e. The individual is debarred entry or access to a Marine Corps site, other DoD installations or facilities, or other Federal site or facility.

f. The individual engaged in acts or activities designed to overthrow the U.S. Government by force.

g. The individual is known to be or reasonably suspected of being a terrorist or belongs to an organization with known terrorism links/support.

h. The individual is identified in the National Crime Information Center (NCIC) known suspected terrorist (KST) file, or the Terrorist Screening Database (TSDB) report as known to be, or suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity. If an individual is identified on the NCIC KST files or TSDB, the Provost Marshal's Office (PMO) will immediately call the NCIS Multiple Threat Alert Center (MTAC) for further coordination. The MTAC will coordinate with the Department of Justice or Federal Bureau of Investigation (FBI) and provide handling instructions to MCAS Cherry Point Police, Criminal Investigations Division (CID), or NCIS.

i. The individual is illegally present in the U.S.

j. The individual has knowingly submitted an employment questionnaire with false or fraudulent information.

k. The individual is a prisoner on a work-release program or currently on felony probation or parole.

l. The individual is pending any felony charge.

m. The individual has criminal arrest information that the site commander determines the person presents a threat to good order, discipline, or health and safety on the Marine Corps site.

n. Any reason the Installation Commander deems reasonable for good order and discipline.

1.4.3 Staging Area

As indicated on the plans, the Contractor staging area will be (CM to coordinate). Amount of material on site shall be kept to a minimum and shall only be material that is pertinent to the work currently being performed. All stockpiling of equipment and materials shall be closely coordinated with the Government and shall not disrupt activities at the site.

SECTION 01 14 00 Page 7

Station Project No. 7394134 20 May 2024

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 8

Station Project No. 7394134 20 May 2024

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

11/20, CHG 3: 02/23

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

1.2 SUBMITTALS

Government approval is required for all submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Earned Value Report

1.3 EARNED VALUE REPORT

1.3.1 Data Required

This Contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Within 15 calendar days of Contract Award, prepare and deliver to the Contracting Officer a Earned Value Report (construction Contract) as directed by the Contracting Officer. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.

1.3.2 Payment Schedule Instructions

Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer.

Additionally, the Earned Value Report must be separated as follows:

a. Primary Facilities Cost Breakdown:

Defined as work on the primary facilities out to the 5 foot line.

Work out to the 5 foot line includes construction encompassed within a theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, SECTION 01 20 00 Page 1

Station Project No. 7394134 20 May 2024 cooling towers, and transformers placed beyond the 5 foot line.

b. Supporting Facilities Cost Breakdown:

Defined as site work, including incidental work, outside the 5 foot line.

1.3.3 Schedule Requirements for HVAC TAB

The field work requirements in Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC must be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. The value for each pay item listed below will be established on a case by case basis for each Contract. The line items are as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. Submit the resulting findings to the Government to allow correction of the design. The progress payment will not be issued until the report is reviewed and approved.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report must contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.

c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data must be collected for one seasonal condition (either summer or winter depending on project timing).

d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.

e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.

f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. Compile this data into a report and submit to the Government. On completion of submittal review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.

SECTION 01 20 00 Page 2

Station Project No. 7394134 20 May 2024

1.4 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the

EP 1110-1-8 .

1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.5.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment shall include the documents listed below.

a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing, in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.

b. The Estimate for Voucher/Contract Performance Statement on NAVFAC Form 4330/54 furnished by the Government. Use NAVFAC Form 4330, unless otherwise directed by the Contracting Officer, on NAVFAC Contracts when a Monthly Estimate for Voucher is required.

c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.

d. Monthly Work-hour report.

e. Updated Construction Progress Schedule and tabular reports required by the contract.

f. Contractor Safety Self Evaluation Checklist.

g. Updated submittal register.

h. Solid Waste Disposal Report.

i. Certified payrolls.

j. Updated testing logs.

k. Other supporting documents as requested.

1.5.2 Submission of Invoices

If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF

SECTION 01 20 00 Page 3

Station Project No. 7394134 20 May 2024 attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.

Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.

1.5.3 Final Invoice

a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.

b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.

c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.

1.6 PAYMENTS TO THE CONTRACTOR

Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.

1.6.1 Obligation of Government Payments

The obligation of the Government to make payments required under the provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR

32.103 Progress Payments Under Construction Contracts:

a. Reasonable deductions due to defects in material or workmanship;

b. Claims which the Government may have against the Contractor under or in connection with this Contract;

c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and

d. Failure to maintain accurate "as-built" or record drawings in accordance with FAR 52.236.21.

SECTION 01 20 00 Page 4

Station Project No. 7394134 20 May 2024

1.6.2 Payment for Onsite and Offsite Materials

Progress payments may be made to the Contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:

a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.

b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site.

This is the start of the file's text. The full file is on GovTribe.