This is an Amendment of Solicitation (Amendment 0002) for Project XK11237, Repair and Upgrade Building 4034 at Marine Corps Air Station Cherry Point, North Carolina. The amendment is issued by CG MCAS Cherry Point Facilities, ROICC under requisition/purchase request number 7375939, with an effective date of September 14, 2026.
The primary purpose of this amendment is to extend the proposal due date and provide responses to pre-proposal inquiries (PPIs). The proposal submission deadline has been extended from September 16, 2026 at 1500 hours to September 18, 2026 at 2:00 PM local time. However, Block 14 contains conflicting information, also referencing a proposal due date of July 18, 2026 by 1400 local time. Offerors must acknowledge receipt of this amendment with their proposal to avoid rejection. The amendment includes a Preaward Inquiry Form documenting seven PPIs submitted between August 27 and September 10, 2026, addressing topics including government cost estimates, liquidated damages ($15,000 per day for phases 1-3 and $75,000 per day for phase 4), drawing clarifications regarding plumbing and drain piping, ACM ceiling tile abatement scope, contaminated surface cleaning specifications, and temporary HVAC requirements during reroofing operations. All other contract terms and conditions remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7375939 Amendment 0003.pdf | ||
| 7375939 Amendment 0001.pdf | ||
| 7375939 DrawingsAsOne.pdf | ||
| Master PPI Form.xlsx | XLSX spreadsheet | |
| FRCE Access Letter.pdf | ||
| JandA ML 25 03 Class FRCS Cherry Point Redacted.pdf | ||
| 7375939 SpecsAsOne.pdf | ||
| 7375939 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 09/14/2026 7375939
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
MCAS CHERRY POINT NC 28533-0012
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
Project XK11237, Repair and Upgrade Building 4034, FRCE
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PROJECT XK11237, REPAIR AND UPGRADE BUILDING 4034, Station Marine Corps Air Station Cherry Point, NC
The deadline for PPI submissions HAS PASSED.
The proposal due date of 16 September 2026 by 1500 HAS BEEN CHANGED to 18 September 2026 at 2:00PM.
The purpose of this amendment is to answer pre-proposal inquiries (PPIs) and extend the proposal due date.
See attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Project XK11237, Repair and Upgrade Building 4034 Amendment 0002 MCAS Cherry Point, North Carolina Project No. 7375939
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. This amendment updates the Proposal Due Date/Time section provided in the original Request for Proposal to the following:
Proposal Due Date/Time: 18 July 2026 by 1400 local time
B. All other contract terms and conditions remain unchanged.
PREAWARD INQUIRY FORM
PAGE SECTION PARAGRAPH
1 8/27/2026 Please provide the Government's estimated cost range for this project. This information is requested to determine whether a bid bond will be required and to allow our surety to evaluate the appropriate bonding limits, as the estimated cost range is required for their review. Providing this information in advance will help avoid the unnecessary risk associated with requesting a bid bond on the day of bid submission and ensure sufficient time for the surety to issue the bond, allowing us to comply with the solicitation's Bond Requirements, which require the bid bond to be submitted with the proposal.
Between $10,000,000.00 and $25,000,000.00.
2 8/28/2026 Please confirm the Liquidated Damages for this project - $15,000 per day for phases 1-3 and $75,000 per day for phase 4.
The numbers for LDs for this project are listed correctly on the RFP.
3 9/3/2026 A-601 Lines generally denote operable. I can’t see how or why these openings wouldn’t be fixed. Clarification please?
See updated drawing in folder 0001
9/10/2026 59, 62 Drawing PD401
Drawing sheets PD401 and P-401 indicate reuse of existing rough-ins at certain plumbing fixture locations while also referencing sawcut and patch work for drain piping modifications. Please identify the fixture locations requiring new below-slab drain piping and associated sawcut/patch work for bidding purposes.
Sawcut as required to remove and install sanitary piping as shown on PD401 view 3 and P-401 view 2.
9/10/2026 284-293
HM001 Note A Confirm whether the assumed ACM ceiling tile within the blasting booth (approximately 5,100 SF area shown on Life Safety Plan) is included in the Contract scope for abatement and removal.
The assumed ACM ceiling tile is shown on drawings HM101 and
AD104.
9/10/2026
HM001 Note 1 The specifications state to assume cleaning 500 SF of gypsum/masonry surfaces and removal of 200 SF of contaminated ceiling tile. Please provide drawing locations identifying these quantities.
Drawings HM101 and HM102 provide the general locations of the stained and mold contaminated SACT.
AMENDMENT #
PPI # QUESTION GOVERNMENT RESPONSE
SUBMITTED
July 2011
PREAWARD INQUIRY FORM
PAGE SECTION PARAGRAPH AMENDMENT #
PPI # QUESTION GOVERNMENT RESPONSE
SUBMITTED
9/10/2026
PH101 Phasing Plan Note Temporary HVAC is required during reroofing adjacent to the occupied Rubber Shop. Please define performance requirements, duration, temperature/humidity requirements, and responsibility for power
Existing Rubber Shop is conditioned by (3) 10 ton heat pumps. Duration is dependent on how long the reroof process takes. Maintain 78 degrees and 50% RH during summer and 68 degrees during winter. Contractor responsible for temporary power.