Amendment 0001 7241766.pdf
PDF 1 MB Posted
- Attached to
- N400857241766 Replace Rooftop Units Building 87
- Solicitation number
- N400857241766
About this file
This document is an Amendment to a solicitation for replacing rooftop units at Building 87, Marine Corps Air Station Cherry Point, North Carolina. The amendment (Amendment #0001) extends the proposal due date to January 6, 2026 at 12:00 PM local time and provides responses to Request for Information (RFI) queries. Key technical details include replacing two existing rooftop units (RTU-1 and RTU-2), which are cooling-only units, with new equipment that will connect to existing ductwork and roof curbs. The contractor must verify existing roof truss conditions, maintain proper condensate drain slopes, and ensure new equipment placement meets specific requirements, including maintaining a minimum 10-foot distance from the roof edge. Supplementary NAVFAC drawings (12782496, 12782509, and 12913249) have been referenced to provide additional installation guidance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7242175 SpecsAsOne.pdf | ||
| 7241766 RFP.pdf | ||
| 7242175 DrawingsAsOne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7241766 Replace Rooftop Units Building
MCAS Cherry Point, NC
AMENDMENT #0001
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
NAVFAC
SPECIFICATION
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 12/22/2025 7241766
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7241766 Replace Rooftop Units Building 87, Marine Corps Air Station Cherry Point, NC Amendment 0001 is being issued to provide RFI responses, revise document 00 01 15 1.2 and reference supplementary
NAVFAC Drawings 12782496,12782509 and 12913249.
The new proposal due date is January 6, 2026 at 12:00 PM local time.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Generator and ATS Replacement, AirOps
1. Can the contractor requested model and serial numbers for the existing RTU’s to match curb adapters for the new equipment to be provided under the subject solicitation.
Response: RTU-1 Model Number is SSHLF30ECC47C69CD9001A0WE0##0L00RT0Y8600.
RTU-1 Serial Number is C10K04990. RTU-2 Model number is SSHLF40EEC46AD9001A0WE0##0L00RT0Y8600. RTU-2 Serial Number is C10K04991.
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
2. On plan sheet M-111 General Note 3 the contractor is to verify the existing roof truss members don’t have any deterioration. During the site visit we were unable to look at the trusses. Is there an attic that we can go into to verify the trusses for damage? Can another walk-through be scheduled to inspect the trusses and existing ceiling conditions?
Response: Access to trusses to verify damage is through a suspended ceiling. Reference revised Specification Section 00 01 15. Reference supplementary NAVFAC Drawings 12782496 and 12782509. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
3. On plan sheet ED130, the contractor is to remove the existing conduits and homerun back to the panel MDP. Can a reflective ceiling plan be provided for reference of the existing conditions in the areas of work?
Response: Reference revised Specification Section 00 01 15. Reference supplementary NAVFAC Drawing 12782509. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
4. The morning warm up sequence calls for the “compressor settings shall adjust as needed to continue temperature increase”. Can you confirm if the unit is a heat pump or a cooling only unit? If the unit is a heat pump, can you please provide the required performance?
Response: RTU-1 and RTU-2 are cooling only units. Reference NAVFAC Drawing 12913251, Packaged Rooftop Unit Schedule. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
5. The existing roof curb looks to be about 24” above the finished roof. Curb adaptors for RTUs can easily add an additional 24” in height. This would make the new unit 48” above the finished roof. Can the existing curb be demolished and replaced with a new curb? If not, is there a requirement for a maintenance platform to be provided?
Response: Re-use existing curb if possible or provide specified curb adaptor to existing roof curbs not to exceed 48 inches in height. Reference revised NAVFAC Drawing 12913249. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
6. Plan Sheet MD111, Note 1 demolish equipment support. Can this roof rail remain as is? The existing roof is in terrible shape and it may be best not to compromise it. See attached pictures.
Response: Reference revised NAVFAC Drawing 12913248. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
7. Plan Sheet M-00, General Note 3, Where a product is submitted that is not the basis of design the impact of cost shall be included in the contractors price and not passed on to the owner. Please provide the basis of design.
Response: Basis of Design is AAON RNA-040-D-A-8-HABJB-00000: 00-0AGAM-F00-
00000-ABCBJ-DC-CB0-A-00-00-0-AZ0-EM-DA0A-00-000-A00A00-C0000F-000000B.
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
8. The bid date is December 29, 2025 at 12:00 pm. I am requesting that the bid date be moved until after the first of the year. Most contractors and vendors are off during the Christmas and the New Year Holidays (many travel to see family). For instance, Our office is closed from December 23 to January 5th. Please review and advise.
Response: The proposal due date will be extended to Tuesday, January 6, 2026 via this amendment.
9. Note 1 on sheet M-111 states to adjust ductwork and connect to the new unit and test the ductwork to the unit for leaks. The existing unit is on a curb that acts as a plenum from the unit to the duct below the curb so there is no ductwork in between. Is this acceptable to go back with a unit that the existing curb will act as a plenum, or are we to install duct through the curb to the unit?
Response: Reference NAVFAC Drawing 12913249 Sheet Keynotes 1 and 2. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
Replace Both Rooftop Units Building 87 7242175 MCAS Cherry Point, NC
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/24
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."
1.2 CONTRACT DRAWINGS
<CTR>SHEET LIST</CTR>
NAVFAC NUMBER SHEET NUMBER SHEET NAME
GENERAL
12913246 G-001 COVER SHEET AND DRAWING
MECHANICAL
12913247 M-001 ABBREVIATIONS, LEGEND
AND GENERAL NOTES
12913248 MD111 MECHANICAL ROOF PLAN -
12913249 M-111 MECHANICAL ROOF PLAN -
NEW WORK
12913250 M-501 DETAILS
12913251 M-601 SCHEDULES
12913252 M-701 CONTROLS
12913253 M-702 CONTROLS
ELECTRICAL
12913254 E-001 LEGEND
12913255 E-002 GENERAL NOTES
12913256 ED130 ELECTRICAL ROOF PLAN -
DEMOLITION
12913257 EP110 LEVEL 1 - POWER PLAN
12913258 EP130 ELECTRICAL ROOF PLAN
12913259 EP410 ENLARGED PLANS
12913260 EP601 POWER ONE LINE DIAGRAMS
12913261 EP701 PANEL SCHEDULE
DOCUMENT 00 01 15 Page 1 12/19/25
Replace Both Rooftop Units Building 87 7242175 MCAS Cherry Point, NC
1.3 SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
1.3.1 Reference Drawings
The following reference drawings are intended only to show the original construction. Drawing are the property of the Government and shall not be used for any purpose other than that intended by the contract. The drawings are half-size. Full-size drawings are available at the bidder's or Contractor's expense.
NAVFAC DWG NO. TITLE
12782496 ROOF FRAMING PLAN
12782509 REFLECTED CEILING PLAN,
BUILDING 87
-- End of Document --
DOCUMENT 00 01 15 Page 2 12/19/25 nicholas.a.hall Callout Two (2) New 4" diameter steel posts on top of New W10X22 to roof deck supporting HVAC equipment.
nicholas.a.hall Callout Existing 4' diameter steel post from slab to roof deck supporting HVAC equipment.
nicholas.a.hall Callout Existing 4" diameter steel post from slab to roof deck supporting HVAC equipment.
nicholas.a.hall Callout New 4" diameter steel pipe welded to top of new W10x 22 to roof deck supporting HVAC equipment.
nicholas.a.hall Callout Existing 4" diameter steel pipe from slab to roof deck supporting HVAC equipment.
nicholas.a.hall Callout Existing 4" diameter steel pipe from slab to roof deck supporting HVAC equipment.
RTU-1
RTU-2
B C D E F G H J
(E)1 1/2"CD
(E) ROOF CURB
(E) ROOF CURB(E) 68x27 SA DN
(E) 69x42 RA DN
THRU ROOF
THRU ROOF
(E) 69x34 RA DN
(E) 68x27 SA DN
(E)1 1/2"CD
THRU ROOF
THRU ROOF
65x46 SA 91x25 RA
65x46 SA
91x25 RA
OPENING OPENING
OPENING
OPENING
04'8' 16' 24'8'
GRAPHIC SCALE: 1/8"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
SIGNED FINAL
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
EE
__ ___ ___ ___ ___ ____ ___ ___ ___ ___ __A
B C D E F G H JA-430C1
M-111
M
EC
HA
NI
CA
L
RO
O
F
PL
AN
NE
W
W O
RK
MCM
AJL RVG
APRIL 30, 2025
199.26
7242175
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
N
AV
FA
C
S
YS
C O
M M
ID
-A
TL
AN
TI
C
FR
C
-E , M
A R
IN
E
C O
R
PS
A
IR
S
TA
TI
O
N
R E
P
LA
C E
R O
O
FT
O P
H V
A C
E Q
U
IP
M E
N T
B U
IL
D
IN
G
12913249
GENERAL SHEET NOTES
1 CONNECT NEW CONDENSATE DRAINS TO EXISTING
CONDENSATE PIPING, MAINTAINING 1/8" PER FOOT SLOPE.
2 RE-USE EXISTING CURB OR PROVIDE SPECIFIED CURB ADAPTORS TO
EXISTING ROOF CURB NOT TO EXCEED TOTAL HEIGHT OF 48".
3 CONTRACTOR TO VERIFY THE EXISTING TIMBER ROOF
TRUSS MEMBERS FOR DETERIORATION. SEE SCHEDULE
FOR EXACT UNIT WEIGHTS.
SCALE: 1/8" = 1'-0"M-111
MECHANICAL ROOF PLANA1
SHEET KEYNOTES
1 CONNECT RTU SUPPLY TO EXISTING 69x34 SUPPLY AIR
DUCT AND RTU RETURN TO EXISTING 68x27 RETURN AIR
DUCT. FIELD ADJUST DUCTWORK TO CONNECT TO NEW
RTU. TEST DUCTWORK CONNECTION FOR LEAKAGE
2 CONNECT RTU SUPPLY TO EXISTING 68x27 SUPPLY AIR DUCT AND RTU RETURN TO EXISTING 69x42 RETURN AIR
DUCT. FIELD ADJUST DUCTWORK TO CONNECT TO NEW
RTU. TEST DUCTWORK CONNECTION FOR LEAKAGE.
3 REMOVE SUPPLY DUCT SMOKE DETECTORS AND REPLACE
LIKE-IN-KIND. RECONNECT AS REQUIRED TO EXSITING
FIRE ALARM AND DDC CONTROLS.
4 DURING INSTALLATION AND ALIGNMENT OF NEW
EQUIPMENT ON EXISTING PAD, ENSURE THE EDGE OF THE
EQUIPMENT IS A MINIMUM OF 10'-0" FROM THE EDGE OF
THE BUILDING ROOF.
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
04/30/2025
REVISION DATE:
12/19/25 nicholas.a.hall Polygon
Blank Page
File details come from the government source that posted it. Updated .