This document is a federal specification for firestopping work on the Upgrade Life Safety Systems project at Hangar 250 (Contract 7190530), effective September 23, 2026.
The specification requires furnishing and installing tested and listed firestopping systems to create effective barriers against flame, smoke, and gases while maintaining fire resistance ratings in walls, partitions, floors, and ceiling-floor assemblies. Work includes sealing through-penetrations around pipes, conduits, cables, and vents; construction joints accommodating expansion and movement; and gaps at curtain walls, perimeter walls, and shaft intersections. Firestopping materials must be supplied from a single domestic manufacturer, be asbestos-free and nontoxic, and comply with FM APP GUIDE approval or UL listing. Materials must achieve flame spread of 25 or less and smoke development rating of 50 or less per ASTM E84 or UL 723, with Health Rating of 0 or 1. Fire resistance ratings required include F Rating of 1 hour for wall penetrations and F and T ratings of 1 hour for floor penetrations, tested per ASTM E814 or UL 1479. Construction joints must meet fire resistance ratings of the construction in which they occur, tested per ASTM E119, E1966, or UL 2079, with minimum Class II movement capability. The contractor must engage an FM Research-approved installer per FM 4991 or UL-certified firestop contractor, or an AHJ-approved installer with manufacturer training and minimum three years' experience. An independent firestopping inspector with minimum two years' construction experience and current certification (UL, FM, IFC, ICC, or professional engineer) must inspect installations. Inspection requires minimum 10 percent witnessing of each firestop type during installation or 2 percent post-installation destructive verification per floor/area. Submittals require government approval including shop drawings, product data, test reports, inspection forms, and qualifications certificates. A Final Inspection Report must be submitted at least 14 days prior to government acceptance testing, with detailed documentation of locations, types, ratings, photographs, and compliance statements. Any non-compliant systems require repair or replacement at no cost to the government with re-inspection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004 7190530.pdf | ||
| 01 45 00 Amendment 0001 v2.pdf | ||
| PPI1.png | PNG image | |
| 01 45 00 Amendment 0003.pdf | ||
| Amendment 0003 7190530.pdf | ||
| PPI2.png | PNG image | |
| Amendment 0002 7190530.pdf | ||
| Amendment 0001 7190530.pdf | ||
| 7190530 RFP.pdf | ||
| 7195017 DrawingsAsOne.pdf | ||
| 7195017 SpecsAsOne.pdf | ||
| Master PPI Form.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upgrade Life Safety Systems, Hangar 250 7190530
SECTION 07 84 00.00 22
FIRESTOPPING
09/23
PART 1 GENERAL
1.1 SUMMARY
Furnish and install tested and listed firestopping systems, combination of materials, or devices to form an effective barrier against the spread of flame, smoke, and gases, and maintain the integrity of fire resistance rated walls, partitions, floors, and ceiling-floor assemblies, including through-penetrations and construction joints and gaps.
a. Through-penetrations include the annular space around pipes, tubes, conduit, wires, cables, and vents.
b. Construction joints include those used to accommodate expansion, contraction, wind, or seismic movement; firestopping material must not interfere with the required movement of the joint.
Gaps requiring firestopping include gaps between the curtain wall and the floor slab and between the top of the fire-rated walls and the roof or floor deck above and at the intersection of shaft assemblies and adjoining fire resistance rated assemblies.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E119 (2022) Standard Test Methods for Fire Tests of Building Construction and Materials
ASTM E814 (2013a; R 2017) Standard Test Method for Fire Tests of Penetration Firestop Systems
ASTM E1966 (2015; R 2019) Standard Test Method for Fire-Resistive Joint Systems
FM GLOBAL (FM)
FM 4991 (2013) Approval of Firestop Contractors
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
SECTION 07 84 00.00 22 Page 1 September 23, 2026
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2021) International Building Code
UNDERWRITERS LABORATORIES (UL)
UL 723 (2020) UL Standard for Safety Test for Surface Burning Characteristics of Building Materials
UL 1479 (2015; Reprint May 2021) Fire Tests of Through-Penetration Firestops
UL 2079 (2015; Reprint Jul 2020) Tests for Fire Resistance of Building Joint Systems
UL Fire Resistance (2014) Fire Resistance Directory
1.3 SEQUENCING
Coordinate the specified work with other trades. Apply firestopping materials at penetrations of pipes and ducts, prior to insulating, unless insulation meets requirements specified for firestopping. Apply firestopping materials at building joints and construction gaps, prior to completion of enclosing walls or assemblies. Cast-in-place firestop devices must be located and installed in place before concrete placement.
Pipe, conduit, or cable bundles must be installed through cast-in-place device after concrete placement but before area is concealed or made inaccessible. Firestop material must be inspected and approved prior to final completion and enclosing of any assemblies that may conceal installed firestop.
1.4 SUBMITTALS
Government approval is required for all submittals. Shop drawings (SD-02), product data (SD-03), and Certificates (SD-07) must be prepared by the designer and combined and submitted as one complete package. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Firestopping System
SD-03 Product Data
Firestopping Materials
SD-06 Test Reports
Inspection Forms Inspection Report
SD-07 Certificates
Firestopping Inspector Qualifications Firestopping Materials Firestopping Installer Qualifications
SECTION 07 84 00.00 22 Page 2
1.5 QUALITY ASSURANCE
1.5.1 Firestopping Installer
Engage an experienced Installer who is:
a. FM Research approved in accordance with FM 4991, operating as a UL Certified Firestop Contractor, or
b. When approved by the Authority Having Jurisdiction (AHJ), certified, licensed, or otherwise qualified by the firestopping manufacturer as having the necessary training, and a minimum of 3 years' experience in the installation of the manufacturer's products in accordance with specified requirements. Submit documentation of this experience. A manufacturer's willingness to sell its firestopping products to the Contractor or to an installer engaged by the Contractor does not in itself confer Firestopping Installer Qualifications on the buyer. The Firestopping Installer must have been trained by a direct representative of the manufacturer (not distributor or agent) in the proper selection and installation procedures of the manufacturer's products. The Firestopping Installer must obtain from the manufacturer and submit written certification of training, and retain proof of certification for duration of firestop installation. AHJ approval criteria for option (b) is generally limited to small jobs consisting of one trade with few penetration or joint systems.
There must be a single qualified Installer for the entire project.
Multiple qualified Installers employed by the same organization will also be permitted. Each Installer's qualifications must be approved by the Government.
1.5.2 Firestopping Inspector Qualifications
The Firestopping Inspector must meet all of the following:
a. Be completely independent of, and divested from, the Firestopping Installer, the manufacturer, and the supplier of any material or item being inspected, and
b. Not be a competitor of the Firestopping Installer, the contractor, the manufacturer, or supplier of any material or item being inspected, and
c. Have a minimum of two years' experience in construction field inspections of firestopping systems, products, and assemblies.
In addition, the Firestopping Inspector must meet one of the following::
a. Passed the UL Firestop exam within the last three years, or
b. Passed the FM Firestop exam within the last three years, or
c. Passed the International Firestop Council (IFC) exam within the last three years, or
d. Completed the International Code Council (ICC) Firestopping Credential of Learning Achievement within the last three years, or
e. Be a registered Professional Engineer who has passed the National Council of Examiners for Engineering and Surveying (NCEES) Fire
SECTION 07 84 00.00 22 Page 3
Protection Engineer exam. Submit documentation demonstrating experience in construction field inspections of firestopping systems, products, and assemblies for a minimum of 3 relevant projects. Include a description of the project and date of construction completion.
Include in the qualifications submittal a signed statement asserting compliance with the requirements stated in this paragraph.
1.6 DELIVERY, STORAGE, AND HANDLING
Deliver materials in the original unopened packages or containers showing name of the manufacturer and the brand name. Store materials off the ground, protected from damage and exposure to elements and temperatures in accordance with manufacturer requirements. Remove damaged or deteriorated materials from the site. Use materials within their indicated shelf life.
PART 2 PRODUCTS
2.1 FIRESTOPPING SYSTEM
Submit detail drawings including manufacturer's descriptive data, typical details conforming to UL Fire Resistance, or other details certified by another nationally recognized testing laboratory, installation instructions or UL listing details for a firestopping assembly in lieu of fire-test data or report. For those firestop applications for which no UL tested system is available through a manufacturer, submit a manufacturer's engineering judgment, derived from similar UL system designs or other tests for review and approval prior to installation. Submittal must indicate the firestopping material to be provided for each type of application. When more than a total of 5 penetrations and/or construction joints are to receive firestopping, provide drawings that indicate location, "F" "T" and "L" ratings, and type of application.
Submit a written report with floor plans indicating locations and types of penetrations, and types of firestopping used at each location. Record type by UL list printed numbers.
2.2 FIRESTOPPING MATERIALS
Provide firestopping materials supplied from a single domestic manufacturer, consisting of commercially manufactured, asbestos-free, nontoxic products FM APP GUIDE approved, or UL listed, for use with applicable construction and penetrating items, complying with the following minimum requirements:
2.2.1 Fire Hazard Classification
Provide material that has a flame spread of 25 or less, and a smoke developed rating of 50 or less, when tested in accordance with ASTM E84 or UL 723. Material must be an approved firestopping material as listed in UL Fire Resistance or by a nationally recognized testing laboratory.
2.2.2 Toxicity
Materials must have a Health Rating of 0 or 1, as indicated in the product Safety Data Sheet. Products must not contain hazardous chemicals or require harmful chemicals to clean material or equipment.
SECTION 07 84 00.00 22 Page 4
2.2.3 Fire Resistance Rating
Firestop systems must be UL Fire Resistance listed or FM APP GUIDE approved with "F" rating at least equal to fire-rating of fire wall or floor in which penetrated openings are to be protected. Where required, firestop systems must also have "T" rating at least equal to the fire-rated floor in which the openings are to be protected.
2.2.3.1 Through-Penetrations
Firestopping materials for through-penetrations, as described in paragraph SUMMARY, must provide "F", "T", and "L" fire resistance ratings in accordance with ASTM E814 or UL 1479. Provide fire resistance ratings as follows:
2.2.3.1.1 Penetrations of Fire Resistance Rated Walls and Partitions
F Rating = 1 hour
2.2.3.1.2 Penetrations of Fire Resistance Rated Floors, Floor-Ceiling Assemblies, and the Ceiling Membrane of Roof-Ceiling Assemblies
F Rating = 1 hour, T Rating = 1 hour. Where the penetrating item is outside of a wall cavity the F rating must be equal to the fire resistance rating of the floor penetrated, and the T rating must be in accordance with the requirements of ICC IBC.
2.2.3.2 Construction Joints and Gaps
Fire resistance ratings of construction joints, as described in paragraph SUMMARY, and gaps such as those between floor slabs and curtain walls must be the same as the construction in which they occur. Construction joints and gaps must be provided with firestopping materials and systems that have been tested in accordance with ASTM E119, ASTM E1966, or UL 2079 to meet the required fire resistance rating. Curtain wall joints must be provided with firestopping materials and systems that have been tested in accordance with ASTM E2307 to meet the required fire resistance rating. Systems installed at construction joints must meet the cycling requirements of ASTM E1399/E1399M or UL 2079. All joints at the intersection of the top of a fire resistance rated wall and the underside of a fire-rated floor, floor ceiling, or roof ceiling assembly must provide a minimum class II movement capability.
2.2.4 Material Certification
Submit certificates attesting that firestopping material complies with the specified requirements. For all intumescent firestop materials used in through penetration systems, manufacturer must provide certification of compliance with UL 1479.
All materials must bear a Listing Label. Manufacturer's container labels must include the manufacturer's name, product name, and product description. Other components of the firestop must also be identifiable by labeling or other method by the NAVFAC Designated Fire Protection Engineer
(DFPE).
SECTION 07 84 00.00 22 Page 5
PART 3 EXECUTION
3.1 PREPARATION
The installer must notify the inspector of the arrival of the materials.
Prior to installation, the Inspector must verify that all materials received for the installation meet the requirements of the approved Firestopping Materials.
Areas to receive firestopping must be free of dirt, grease, oil, or loose materials which may affect the fitting or fire resistance of the firestopping system. For cast-in-place firestop devices, formwork or metal deck to receive device prior to concrete placement must be sound and capable of supporting device. Prepare surfaces as recommended by the manufacturer.
3.2 INSTALLATION
Completely fill void spaces with firestopping material regardless of geometric configuration, subject to tolerance established by the manufacturer. Firestopping systems for filling floor voids 4 inches or more in any direction must be capable of supporting the same load as the floor is designed to support or be protected by a permanent barrier to prevent loading or traffic in the firestopped area. Install firestopping in accordance with manufacturer's written instructions. Provide tested and listed firestop systems in the following locations, except in floor slabs on grade:
a. Penetrations of duct, conduit, tubing, cable, and pipe through floors and through fire-resistance rated walls, partitions, and ceiling-floor assemblies.
b. Penetrations of vertical shafts such as pipe chases, elevator shafts, and utility chutes.
c. Gaps at the intersection of floor slabs and curtain walls, including inside of hollow curtain walls at the floor slab.
d. Gaps at perimeter of fire-resistance rated walls and partitions, such as the bottom of walls and floor slabs and between the top of the walls and the bottom of roof decks.
e. Construction joints in floors and fire rated walls and partitions.
f. Other locations where required to maintain fire resistance rating of the construction.
3.2.1 Insulated Pipes and Ducts
Thermal insulation must be cut and removed where pipes or ducts pass through firestopping, unless insulation meets requirements specified for firestopping. Replace thermal insulation with a material having equal thermal insulating and firestopping characteristics.
3.2.2 Fire Dampers
Install and firestop fire dampers in accordance with Section 23 30 00 HVAC AIR DISTRIBUTION. Firestop installed with fire damper must be tested and approved for use in fire damper system.
SECTION 07 84 00.00 22 Page 6
3.2.3 Data and Communication Cabling
Cabling for data and communication applications must be sealed with re-enterable firestopping products.
3.2.3.1 Re-Enterable Devices
Provide firestopping devices that are pre-manufactured modular devices, containing built-in self-sealing intumescent inserts. Allow for cable moves, additions, or changes without the need to remove or replace any firestop materials. Devices must be capable of maintaining the fire resistance rating of the penetrated membrane at 0 percent to 100 percent visual fill of penetrants; while maintaining "L" rating of <10 cfm/sf measured at ambient temperature and 400 degrees F at 0 percent to 100 percent visual fill.
3.2.3.2 Re-Sealable Products
Provide firestopping pre-manufactured modular products, containing self-sealing intumescent inserts. Firestopping products must allow for cable moves, additions, or changes. Devices must be capable of maintaining the fire resistance rating of the penetrated membrane at 0 percent to 100 percent visual fill of penetrants.
3.3 INSPECTION
For Navy projects, install one of each type of penetration and have it inspected and accepted prior to the installation of the remainder of the penetrations by one of the following:
a. The Mid-Atlantic Division, Naval Facilities Engineering Systems Command, Fire Protection Engineer (DFPE).
b. The Firestopping Inspector, witnessed by a designated Government representative.
c. The Firestopping Inspector, with a detailed Inspection Form submitted to the Mid-Atlantic Division, Naval Facilities Engineering Systems Command, Fire Protection Engineer (DFPE) for review and approval within two days of the inspection. The Inspection Form must include:
1) General project identification information
2) Name of Firestopping Inspector
3) Location of system with a partial floor plan to highlight location
4) UL system or Engineering Judgement and rating
5) Description of rated assembly being penetrated and type of penetrant
6) Photographs of destructive samples taken or photographs of steps taken during the installation
7) Measurement of cut samples must be shown in photographs with a ruler. Provide photographs of the joint or penetration prior to firestopping; after firestopping; and intermediate steps.
SECTION 07 84 00.00 22 Page 7
Photographs may be provided in electronic (.jpeg or .pdf) format.
Photographs must provide sufficient angles and detail to show conformance with requirements of the system.
8) General observations
9) Statement of compliance or non-compliance
The means of inspection must be coordinated with the DFPE prior to the inspection. At this inspection, the manufacturer's technical representative of the firestopping material must be present. The manufacturer's technical representative may be the Firestopping Installer.
For all projects, do not cover or enclose the firestopped areas until inspection is complete and approved by the Contracting Officer. Inspect the applications initially to ensure adequate preparations (clean surfaces suitable for application, etc.) and periodically during the work to assure that the completed work has been accomplished according to the manufacturer's written instructions and the specified requirements. Submit written reports indicating locations of and types of penetrations and types of firestopping used at each location; record type by UL listed printed numbers.
3.3.1 Inspection Standards
3.3.1.1 The Firestopping Inspector must verify that the materials and systems used for firestopping and fire resistive joint systems are listed and labeled for the use intended.
3.3.1.2 The Firestopping Inspector must verify that the required firestop systems and fire resistive joint systems have been installed.
3.3.1.3 The Firestopping Inspector must verify compliance of the firestop systems and fire resistive joint systems by observing the installation process and by taking and recording measurements of the substrates and materials being installed or by destructive examination of completed installations.
3.3.1.4 Inspection frequency of firestop systems and fire resistive joint systems will depend on the method of inspection and the scope of the project.
3.3.1.4.1 The method of inspection for firestop systems must be one of the following:
a. The Firestopping Inspector must be on site during installation and randomly witness a minimum of 10% of each type of firestop system being installed, or
b. The Firestopping Inspector must conduct a post installation inspection, which requires destructive type verification of the firestop system and repair of the firestop system. A minimum of 2%, but not less than one, of each type of firestop system must be inspected per floor or for each area of a floor when a floor is larger than 10,000 SF. An area consists of 10,000 SF or less.
3.3.1.4.2 The method of inspection for fire resistive joint systems must be one of the following:
SECTION 07 84 00.00 22 Page 8
a. The Firestopping Inspector must be on site during installation and randomly witness a minimum of 5% of total lineal feet of each type of fire resistive joint system being installed, or
b. The Firestopping Inspector must conduct a post installation inspection in accordance with one of the following:
1) Destructive type verification of the fire resistive joint system and repair of the joint system, or
2) Disassembly and verification of the components and re-installation of the joint system, or
3) Visual inspection and verification of the component or entire joint system, where a visual inspection establishes conformance; or
4) Other appropriate methods showing compliance with the approval process or the manufacturers' instructions.
Inspection must consist of a minimum of one sampling per type of joint system per 500 lineal feet.
3.3.1.6 Prior to construction, the Firestopping Inspector must coordinate with the NAVFAC DFPE to determine the types of firestop systems and subsequently the number of each type that is to be inspected. The determination of a "type" will typically be a function of a unique combination of parameters, including penetrant type (for example, metal pipe, plastic pipe, cabling), firestop material or device (for example, intumescent caulk, collar, sealant), penetrated substrate (for example, gypsum wall, concrete floor, composite floor deck), and rating of penetrated item.
3.3.1.7 Any type of firestop system that does not comply with this specification will require repair or replacement and re-inspection of that firestop system plus one full additional inspection, of the number specified herein, of that type firestop system. If non-compliance occurs on 10% or more of the quantity of firestop products or firestop systems, then inspection of those particular type firestop systems must cease. The Firestopping Installer must inspect their own work, and repair or replace those like firestops within the area prior to re-commencement of inspections by the Firestopping Inspector.
3.3.1.8 The Firestopping Inspector must maintain inspection forms. All observed deficiencies must be documented and marked on the inspection forms. In addition, the Firestopping Inspector must physically identify the location where a required firestop system has been omitted or where the inspection results indicate that the installed firestop system does not comply with the inspection documents. The Inspection Forms must include the following:
a. General project identification information
b. Name of Firestopping Inspector
c. Location of system with a partial floor plan to highlight location
d. UL system or Engineering Judgement and rating
SECTION 07 84 00.00 22 Page 9
e. Description of rated assembly being penetrated and type of penetrant
f. Photographs of destructive samples taken or photographs of steps taken during the installation
g. Measurement of cut samples must be shown in photographs with a ruler. Provide photographs of the joint or penetration prior firestopping; after firestopping; and intermediate steps.
Photographs may be provided in electronic (.jpeg or .pdf) format.
Photographs must provide sufficient angles and detail to show conformance with requirements of the system.
h. General observations
i. Statement of compliance or non-compliance
Submit the inspection forms to the DFPE for surveillance within two days of the inspection.
3.3.2 Inspection Report
Submit inspection report stating that firestopping work has been inspected and found to be applied according to the manufacturer's recommendations and the specified requirements.
3.3.2.1 The report must contain a cover page with the following:
a. The project name, location, and contract number;
b. The name and address of the Firestopping Inspector;
c. The name and address of the Firestopping Installer (s), as well as the prime contractor, if different; and
d. Report date.
3.3.2.2 The report must include drawings indicating locations and types of all penetrations and fire resistive joint systems and types of firestopping used at each location; type must be identified by UL listed printed numbers. Annotated inspected systems with a unique designator that correlates with the Inspection Forms. The drawings must include smoke barriers and partitions and indicate the methods and materials used to protect penetrations.
3.3.2.3 Include UL system details or Engineering Judgements, annotated to identify specific ratings and assembly components.
3.3.2.4 The report must contain a summary page with the following:
a. Types and quantity of each firestop system and fire resistive joint system on the project.
b. The verification method used to ascertain compliance.
c. The quantity of each firestop system and fire resistive joint system inspected on the project and a written statement by the Firestopping Inspector that the number of firestop systems and fire resistive joint systems inspected comply with this
SECTION 07 84 00.00 22 Page 10 specification.
d. Percentages of deficiencies for each type of firestop system and fire resistive joint system referenced.
e. A total number of deficiencies, expressed as a percentage of the total number of firestop systems and fire resistive joint systems inspected.
f. Narrative of inspection observations and description of means and methods used to correct deficiencies. Include a description of deviations from the design documents.
g. Additional information, as determined by the Firestopping Inspector, required to adequately convey compliance.
3.3.2.5 The report must contain copies of all Inspection Forms generated during the inspection process, arranged chronologically.
3.3.2.6 Submit a Final Inspection Report at least 14 days prior to Government acceptance testing for review and approval.
3.3.3 Acceptance
The Government may require additional destructive testing at the time of Government acceptance testing. Systems that are subject to destructive testing must be replaced, at no cost to the Government, by the project's qualified Firestopping Installer. Confirmation that the system replaced complies must be provided by the Firestopping Inspector.
-- End of Section --