This file comprises final submittal architectural and design drawings for the upgrade of the life safety system in Hangar 250 at Marine Corps Air Station Cherry Point, North Carolina. The drawings include a comprehensive set of plans, sections, elevations, and details spanning multiple disciplines: general notes and legends, architectural floor plans for three levels (Level One, Mezzanine, and Level Two), detailed demolition and new construction plans for eight stairs, ceiling plans, stair sections, interior elevations, partition types, and landing details. The project involves significant demolition work including removal of existing wall infill, cased openings, wood landings, flooring, piping, fixtures, and ceiling elements, followed by new construction of fire-rated partitions, gypsum board infill walls, ceramic tile flooring, electrical and plumbing modifications, and fire alarm system upgrades. The drawings indicate work at three elevation levels with heights ranging from 0 feet (Level 1) to 42 feet 2 inches (Level 2), with a mezzanine at 11 feet 8.25 inches.
The general notes establish baseline requirements and contractor responsibilities including compliance with all applicable codes and OSHA regulations, hazardous material identification and reporting, dust control, emergency egress maintenance, daily cleanup protocols, fire-rated penetration sealing, and submission of as-built drawings upon project completion. The contractor must coordinate work with facility management, obtain hot work permits, provide adequate temporary protection for adjacent areas, and ensure existing items designated to remain are repaired or replaced if damaged. All work is designated as unclassified with approval authority vested in the Naval Facilities Engineering Systems Command Mid-Atlantic, with final submittal dated March 5, 2024, under Project No. 0199.21 and Work Order No. 7195017.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004 7190530.pdf | ||
| 01 45 00 Amendment 0001 v2.pdf | ||
| PPI1.png | PNG image | |
| 07 84 00.00 22 Amendment 0003.pdf | ||
| 01 45 00 Amendment 0003.pdf | ||
| Amendment 0003 7190530.pdf | ||
| PPI2.png | PNG image | |
| Amendment 0002 7190530.pdf | ||
| Amendment 0001 7190530.pdf | ||
| 7190530 RFP.pdf | ||
| 7195017 SpecsAsOne.pdf | ||
| Master PPI Form.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND ~ MID-ATLANTIC
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
G-001
CO
VE
R
PA
G E
MCC
12892245
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
UPGRADE LIFE SAFETY SYSTEM HANGAR 250
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
CHERRY POINT, NORTH CAROLINA
FINAL SUBMITTAL
7195017 03/05/2024
FINAL SUBMITTAL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
03/05/2024
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
G-002
DR
AW
IN
G
IN
DE
X
MCC
12892246
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
DRAWING INDEX
NAVFAC #
SHEET
NUMBER SHEET NAME
GENERAL
12892245 G-001 COVER PAGE
12892246 G-002 DRAWING INDEX
12892247 G-003 GENERAL NOTES, LEGENDS
ARCHITECTURE
12892248 A-001 ABBREVIATIONS, LEGEND AND GENERAL NOTES
12892249 A-101 LEVEL ONE EXISTING FLOOR PLAN
12892250 A-102 MEZZANINE EXISTING FLOOR PLAN
12892251 A-103 LEVEL TWO EXISTING FLOOR PLAN
12892252 AD401 STAIR ONE ENLARGED DEMO PLANS
12892253 AD402 STAIR TWO ENLARGED DEMO PLANS
12892254 AD403 STAIR THREE ENLARGED DEMO PLANS
12892255 AD404 STAIR FOUR ENLARGED DEMO PLANS
12892256 AD405 STAIR FIVE ENLARGED DEMO PLANS
12892257 AD406 STAIR SIX ENLARGED DEMO PLANS
12892258 AD407 STAIR SEVEN ENLARGED DEMO PLANS
12892259 AD408 STAIR EIGHT ENLARGED DEMO PLANS
12892260 AD409 DEMOLITION CEILING PLANS
12892261 A-401 STAIR ONE ENLARGED PLANS
12892262 A-402 STAIR TWO ENLARGED PLANS
12892263 A-403 STAIR THREE ENLARGED PLANS
12892264 A-404 STAIR FOUR ENLARGED PLANS
12892265 A-405 STAIR FIVE ENLARGED PLANS
12892266 A-406 STAIR SIX ENLARGED PLANS
12892267 A-407 STAIR SEVEN ENLARGED PLANS
12892268 A-408 STAIR EIGHT ENLARGED PLANS
12892269 A-411 STAIR ONE ENLARGED CEILING PLANS
12892270 A-412 STAIR TWO ENLARGED CEILING PLANS
12892271 A-413 STAIR THREE ENLARGED CEILING PLANS
12892272 A-414 STAIR FOUR ENLARGED CEILING PLANS
12892273 A-415 STAIR FIVE ENLARGED CEILING PLANS
12892274 A-416 STAIR SIX ENLARGED CEILING PLANS
12892275 A-417 STAIR SEVEN ENLARGED CEILING PLANS
12892276 A-418 STAIR EIGHT ENLARGED CEILING PLANS
12892277 A-421 STAIR ONE SECTIONS
12892278 A-422 STAIR TWO SECTIONS
12892279 A-423 STAIR THREE SECTIONS
12892280 A-424 STAIR FOUR SECTIONS
12892281 A-425 STAIR FIVE SECTIONS
12892282 A-426 STAIR SIX SECTIONS
12892283 A-427 STAIR SEVEN SECTIONS
12892284 A-428 STAIR EIGHT SECTIONS
12892285 A-431 INTERIOR ELEVATIONS
12892286 A-501 PARTITION TYPES AND DETAILS
12892287 A-502 LANDING DETAILS
12892288 A-503 CEILING DETAILS
12892289 A-600 DOOR SCHEDULE
12892290 A-610 FINISH LEGEND AND SCHEDULE
FIRE ALARM
12892291 FA001 ABBREVIATIONS, LEGEND AND GENERAL NOTES
12892292 FA101 FIRE ALARM PLAN - AREA A
12892293 FA102 FIRE ALARM PLAN - AREA B
12892294 FA103 FIRE ALARM PLAN - AREA C
12892295 FA104 FIRE ALARM PLAN - AREA D
12892296 FA105 FIRE ALARM PLAN - AREA E
12892297 FA106 FIRE ALARM PLAN - AREA F
12892298 FA601 SCHEDULES
DRAWING INDEX
NAVFAC #
SHEET
NUMBER SHEET NAME
PLUMBING
12892299 P-001 ABBREVIATIONS, LEGEND AND GENERAL NOTES
12892300 PD101 LEVEL 1 - OVERALL PLUMBING DEMOLITION PLAN
12892301 PD102 LEVEL 1.5 - OVERALL MEZZANINE DEMOLITION PLAN
12892302 PD401 ENLARGED DEMOLITION PLANS
12892303 PD402 ENLARGED DEMOLITION PLANS
12892304 PD403 ENLARGED DEMOLITION PLANS
12892305 PD404 ENLARGED DEMOLITION PLANS
12892306 PD405 ENLARGED DEMOLITION PLANS
12892307 PP101 LEVEL 1 - OVERALL PLUMBING PLAN
12892308 PP102 LEVEL 1.5 - OVERALL MEZZANINE PLUMBING PLAN
12892309 P-401 LEVEL 1 - ENLARGED PIPING PLANS
12892310 P-402 LEVEL 1 - ENLARGED PIPING PLANS
12892311 P-403 LEVEL 1 - ENLARGED PIPING PLANS
12892312 P-404 LEVEL 1.5 - ENLARGED PIPING PLANS
12892313 P-405 LEVEL 1.5 - ENLARGED PIPING PLANS
12892314 P-501 DETAILS
12892315 P-601 SCHEDULES
MECHANICAL
12892316 M-001 ABBREVIATIONS, LEGEND AND GENERAL NOTES
12892317 M-002 ABBREVIATIONS, LEGEND AND GENERAL NOTES
12892318 MH102 MEZZANINE FLOOR PLAN
12892319 MH103 LEVEL TWO FLOOR PLAN
12892320 M-301 SECTIONS
12892321 M-401 ENLARGED PLANS
12892322 M-501 DETAILS
ELECTRICAL
12892323 E-001 LEGEND AND ABBREVAITIONS
12892324 E-002 GENERAL NOTES
12892325 E-101 OVERALL ELECTRICAL PLAN - WEST
12892326 E-102 OVERALL ELECRICAL PLAN - EAST
12892327 E-401 STAIR 1 ELECTRICAL PLANS
12892328 E-402 STAIR 2 AND 3 ELECTRICAL PLANS
12892329 E-403 STAIR 4 AND 5 ELECTRICAL PLANS
12892330 E-404 STAIR SIX, SEVEN AND EIGHT ELECTRICAL PLANS
12892331 E-501 LIGHTING FIXTURE SCHEDULE AND DETAILS
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
EXISTING TO
REMAIN
WALL
DOOR
EXISTING TO BE
DEMOLISHED
NEW WORK
PHASING LEGEND
FFE
NOT IN
CONTACT
XXXX
SYMBOL LEGEND
X
INTERIOR
ELEVATION
SHEET NUMBER (WHERE SHOWN)
VIEW NUMBER
XXXX
XBUILDING
SECTION
SHEET NUMBER (WHERE SHOWN)
VIEW NUMBER
XXXX
X
XXXX
X
SHEET NUMBER (WHERE SHOWN)
VIEW NUMBER
SECTION
XXXX
X
SHEET NUMBER (WHERE SHOWN)
VIEW NUMBER
DETAIL
SECTION
ELEVATION LEVEL
0' - 0"
LEVEL NAME
LEVEL ELEVATION
SPOT
ELEVATION 1' - 0"
KEYNOTE X
XXXX
X SHEET NUMBER (WHERE SHOWN)
VIEW NUMBER
CALL OUT
XXXX
X
VIEW TITLE
VIEW NAME
SCALE: 1/8" = 1'
VIEW NUMBER
SHEET NUMBER (WHERE CUT)
XXXX
XEXTERIOR
ELEVATION
SHEET NUMBER (WHERE SHOWN)
VIEW NUMBER
REVISIONS
X
REVISION
CLOUD
REVISION
NUMBER
MATCHLINE
SEE X / XXXX SHEET NUMBER (WHERE SHOWN)
VIEW NUMBER
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
G-003
G
EN
ER
AL
N O
TE
S, L
EG
EN
DS
MCC
12892247
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
GENERAL NOTES
1 THESE DRAWINGS ESTABLISH THE DESIGN INTENT AND DIMENSIONAL RELATIONSHIPS. DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND
EXISTING CONDITIONS PRIOR TO CONSTRUCTION. ANY OMISSIONS, DISCREPANCIES, OR CONFLICTS MUST BE REPORTED TO THE UNITED STATES GOVERNMENT (USG) DESIGNATED CONTRACTING OFFICER’S REPRESENTATIVE IMMEDIATELY UPON DISCOVERY.
2 ALL WORK PERFORMED SHALL BE IN CONFORMANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND ORDINANCES OF THE AUTHORITY HAVING JURISDICTION. ALL WORK SHALL BE IN ACCORDANCE WITH OSHA. THE CONTRACTOR SHALL PROCURE ANY AND ALL NECESSARY PERMITS AND INSPECTIONS. CONTRACTORS WORKING ON USG PROPERTY ARE REQUIRED TO COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS, TO INCLUDE APPLICABLE ENVIRONMENTAL AND SAFETY LAWS AND REGULATIONS, REGARDLESS OF THE CONTRACT LANGUAGE.
COMPLIANCE WITH THE REQUIREMENTS BY SUBCONTRACTORS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3 THE CONTRACTOR SHALL PROVIDE ADEQUATELY TRAINED PERSONNEL, IN ACCORDANCE WITH ALL FEDERAL AND STATE SAFETY AND ENVIRONMENTAL
REGULATIONS FOR JOBS INVOLVING SPECIFIC ENVIRONMENTAL RISKS.
4 THE CONTRACTOR SHALL ESTABLISH AND MAINTAIN A PROGRAM TO PROTECT THE SAFETY AND HEALTH OF ALL PERSONS ON THE WORKSITE TO INCLUDE HIS OR HER EMPLOYEES, EMPLOYEES OF OTHER CONTRACTORS OR SUBCONTRACTORS, VISITORS, AND THE PUBLIC WHEN WORKING ON THE
COMPOUND.
5 THE CONTRACTOR IS REQUIRED TO FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS TO COMPLETE THE PROJECT AS DESCRIBED OR IMPLIED BY THE
CONTRACT DOCUMENTS (INCLUDING THE PROJECT MANUAL AND SPECIFICATIONS).
6 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF DRAWINGS AND THE PROJECT MANUAL AND SPECIFICATIONS TO ALL TRADES UNDER THEIR JURISDICTION. COORDINATE ALL SCHEDULING WITH BUILDING OWNER AND USG DESIGNATED CONTRACTING OWNER’S REPRESENTATIVE.
7 ALL ITEMS REQUIRED BY THESE DRAWINGS, BUT NOT SPECIFIED, SHALL MATCH BUILDING STANDARDS. THE CONTRACTOR SHALL COMPLY WITH ALL
MANUFACTURER’S RECOMMENDATIONS UNLESS NOTED OTHERWISE OR SPECIFIED.
8 OBTAIN “HOT WORK” PERMITS (FOR WELDING, TORCH CUTTING, OR ANY WORK REQUIRING HEAT, SPARK, OR FLAME) FROM PERMIT AUTHORIZING
INDIVIDUAL (PAI) PRIOR TO COMMENCING SUCH WORK.
9 WHERE FEASIBLE, PROVIDE PROFESSIONAL CLEANING SERVICES FOR ALL AREAS AFFECTED BY CONSTRUCTION BEFORE PUNCH LIST. CLEANING SHALL INCLUDE WAXING, WASHING, POLISHING, DUSTING, CARPET SHAMPOOING, AND VACUUMING. WORK COMPLETED AFTER PUNCH LIST WILL ALSO BE
CLEANED IN SUCH A MANNER.
10 ALL WOOD BLOCKING SHALL BE FIRE RESISTIVE TREATED (FRT) AND UL LISTED. NO WOOD BLOCKING IS ALLOWED IN THE WALLS WITHOUT THE
APPROVAL OF THE USG LIFE SAFETY AUTHORITY.
11 PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR SHALL VERIFY THAT THEY ARE IN POSSESSION OF THE LATEST ISSUANCE OF PROJECT
DRAWINGS AND SPECIFICATIONS.
12 THE CONTRACTOR SHALL COMPLY WITH ALL BUILDING AND COMPOUND RULES AND REGULATIONS CURRENTLY IN EFFECT AT THE TIME OF
CONSTRUCTION; NO EXCEPTIONS.
13 PRIOR TO THE COMMENCEMENT OF WORK, THE CONTRACTOR AND HIS OR HER SUBCONTRACTOR PERSONNEL SHALL ATTEND ANY REQUIRED FACILITY AND SECURITY BRIEFING(S) CONDUCTED SPECIFICALLY FOR THE PROTECTION OF ALL PERSONNEL AT THE PROJECT SITE.
14 REQUEST FOR SUBSTITUTIONS, REVISIONS, OR CHANGES MUST BE SUBMITTED TO THE USG DESIGNATED CONTRACTING OFFICER’S REPRESENTATIVE FOR REVIEW AND APPROVAL PRIOR TO PURCHASE, FABRICATION, INSTALLATION, AND ONSET CONSTRUCTION. SUCH REQUESTS SHALL BE IN WRITING.
ONLY SUBSTITUTIONS THAT ARE OF EQUAL OR BETTER QUALITY/PERFORMANCE AND HAVE MORE ADVANTAGEOUS DELIVERY TIME FRAMES WILL BE CONSIDERED. SUBSTITUTIONS DUE TO THE LACK OF PLANNING ON THE PART OF THE CONTRACTOR WILL NOT BE CONSIDERED.
15 THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK THAT CHANGES THE DESIGN INTENT CONTAINED WITHIN THE CONTRACT DOCUMENTS (INCLUDING THE PROJECT MANUAL AND SPECIFICATIONS) UNLESS HE RECEIVES WRITTEN AUTHORIZATION FROM THE USG CONTRACTING OFFICER.
FAILURE TO OBTAIN SUCH AUTHORIZATION SHALL INVALIDATE ANY FUTURE CLAIM FOR ADDITIONAL COMPENSATION AND MAY MAKE THE CONTRACTOR
LIABLE FOR RECONSTRUCTION AT THE CONTRACTOR’S EXPENSE.
16 PROVIDE NON-COMBUSTIBLE BLOCKING IN PARTITIONS FOR WALL HUNG ITEMS SPECIFIED WITHIN THE CONTRACT DOCUMENTS (INCLUDING THE PROJECT MANUAL AND SPECIFICATIONS) AND ITEMS SPECIFIED AS USG PROVIDED AND FURNITURE IDENTIFIED AS NOT IN CONTRACT. COORDINATE WITH
THE CONTRACTING OFFICER’S REPRESENTATIVE.
17 ALL GENERAL NOTES AND KEYNOTES SHOWN ON A SHEET ARE SPECIFIC TO THAT SHEET.
18 ALL NOTES, DETAILS AND FEATURES DRAWN AS APPLICABLE FOR ONE CONDITION SHALL BE APPLICABLE TO SIMILAR CONDITIONS WHETHER OR NOT IT
IS SPECIFICALLY INDICATED OR NOTED.
19 NO WORK DEFECTIVE IN WORKMANSHIP, QUALITY, OR DEFICIENT IN REQUIREMENTS OF THE CONTRACT DOCUMENTS WILL BE ACCEPTABLE DESPITE THE
CONTRACTING OFFICER’S REPRESENTATIVE FAILURE TO DISCOVER OR POINT OUT DEFECTS OR DEFICIENCIES DURING CONSTRUCTION OR PUNCHLIST.
DEFECTIVE WORK REVEALED WITHIN THE TIME PROVIDED BY THE GUARANTEES AND WARRANTEES SHALL BE REPLACED BY THE CONTRACTOR WITH WORK IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. NO PAYMENT, EITHER PARTIAL OR FINAL SHALL BE CONSTRUED AS ACCEPTANCE OF
DEFECTIVE WORK OR IMPROPER MATERIALS.
20 PROMPTLY PROVIDE “AS-BUILT” DRAWINGS OF COMPLETED PROJECT. THE FINAL PAYMENT IS CONTINGENT UPON RECEIPT OF “AS-BUILT” DRAWINGS BY
THE USG CONSTRUCTION MANAGER.
21 AT THE TIME OF SUBMISSION OF THE CONTRACTORS BID, THE CONTRACTOR SHALL MAKE NOTE OF ANY LONG-LEAD ITEMS THAT MAY ADVERSELY
AFFECT THE PROJECT SCHEDULE.
22 OBTAIN ALL GOVERNMENT PERMITS AND APPROVALS FOR ALL DEMOLITION AND NEW WORK IN ACCORDANCE WITH USG REGULATIONS AND
REQUIREMENTS.
23 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR SAFETY
PRECAUTIONS AS THEY RELATE TO THIS WORK.
24 BETWEEN THE HOURS OF 6am AND 9pm, ALL WORKERS MUST RECEIVE APPROVAL FROM CONTRACTOR AND CONTRACTING OFFICER’S REPRESENTATIVE IF ANY NOISE RESULTING FROM THE WORK IS ABOVE 60 DECIBELS OR CAN BE HEARD OUTSIDE THE IMMEDIATE WORK AREA.
25 INFORM CONTRACTING OFFICER’S REPRESENTATIVE IMMEDIATELY UPON DISCOVERY OF UNDOCUMENTED EXISTING CONDITIONS, SUCH AS THE PRESENCE OF ASBESTOS OR ASBESTOS CONTAINING MATERIALS, RADIOACTIVE MATERIALS, RADON GAS, TOXIC WATERS, OR OTHER SIMILAR
MATERIALS.
26 REMOVE ALL TEMPORARY AND EXISTING INACTIVE AND/OR ABANDONED MATERIALS SUCH AS: DEVICES, WIRING, CONDUIT, PIPE, DUCTWORK, HANGERS, ETC. TO LEAVE STRUCTURE CLEAN AND CLEAR FOR NEW CONSTRUCTION. ALL MATERIALS SHALL BE REMOVED TO THE LAST POINT OF ACTIVE SERVICE OR AT A MINIMUM SIX (6) INCHES (152mm) OUTSIDE THE SPACE BEING RENOVATED. WHERE OUTSIDE THE SPACE BEING RENOVATED IS TOO CONGESTED TO REMOVE MATERIALS, PORTIONS OF THE WALL SHALL BE REMOVED TO GAIN ACCESS IN ORDER TO DEMOLISH MATERIALS OUTSIDE THE SPACE.
27 SEAL ALL NEW AND EXISTING PENETRATIONS, HOLES, AND VOIDS IN FIRE-RATED WALLS, FLOORS, AND ASSEMBLIES WITH NON-SHRINKING MORTAR (WHERE APPROPRIATE IN CMU CONSTRUCTION) OR WITH UL-LISTED THROUGH PENETRATION FIRE STOP SYSTEM TO MAINTAIN FIRE-RATED ASSEMBLIES.
WHERE ALL ASSEMBLIES ARE ALSO STC RATED; PENETRATIONS, HOLES, AND VOIDS SHALL MEET BOTH STC AND FIRE RESISTIVE REQUIREMENTS.
28 THROUGHOUT DEMOLITION AND CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION FOR ADJACENT AREAS TO MAINTAIN SECURITY, PROTECTION FROM MOISTURE, AND TO CONTAIN DUST, DEBRIS, AND NOISE WITHIN THE CONTRACT LIMIT LINE.
29 COORDINATE WORK WITH FACILITY MANAGEMENT, INCLUDING SCHEDULING TIME AND LOCATIONS FOR DELIVERIES, BUILDING ACCESS, AND USE OF BUILDING SERVICES AND FACILITIES. MINIMIZE DISTURBANCE OF BUILDING FUNCTIONS AND OCCUPANTS.
30 ALL EXISTING MATERIAL, EQUIPMENT, FIXTURES, HARDWARE, OR OTHER ITEMS IDENTIFIED AS EXISTING TO REMAIN SHALL BE REPAIRED TO A LEVEL EQUAL TO START OF DEMOLITION/CONSTRUCTION, OR REPLACED IN KIND IF DAMAGED DURING DEMOLITION/CONSTRUCTION.
31 PROTECT ALL ADJACENT PUBLIC SPACES AND OCCUPIED AREAS FROM CONSTRUCTION DAMAGE. CLEANUP SHALL BE PERFORMED ON A DAILY BASIS WITH RESPECT TO ALL THE COMMON AREAS. ANY DUST, DIRT OR DEBRIS PRESENT IN THESE AREAS WILL NOT BE ACCEPTABLE.
32 PATCH. REPAIR, AND PAINT ALL EXISTING SURFACES IDENTIFIED AS EXISTING TO REMAIN WITHIN THE SCOPE OF WORK. REPAIR AND REFINISH ALL
SURFACES DAMAGED DURING DEMOLITION OR CONSTRUCTION.
33 DO NOT STOCKPILE MATERIALS IN SUCH A WAY AS TO CREATE EXCESSIVE CONCENTRATED FLOOR LOADS.
34 COORDINATE TRASH REMOVAL PROVISIONS/ REQUIREMENTS WITH FACILITY MANAGER
35 REMOVAL OF ANY MATERIAL AND/OR EQUIPMENT SHALL INCLUDE THE REMOVAL OF ASSOCIATED ITEMS SUCH AS FASTENERS, SUPPORTS, WIRING, ADHESIVES, ETC.
36 IF ANY HAZARDOUS MATERIALS ARE ENCOUNTERED PRIOR TO OR DURING DEMOLITION, GENERAL CONTRACTOR SHALL NOTIFY PD/COR.
37 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL AND MAINTAINING EMERGENCY EGRESS AT ALL TIMES DURING DEMOLITION.
38 GENERAL CONTRACTOR SHALL ENSURE THAT EXISTING UTILITIES THROUGHOUT BUILDING WILL NOT BE DISRUPTED.
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
8' - 0"CEILING TAG HEIGHT A.F.F.
101DOOR TAG DOOR NUMBER
ROOM NAME
15 ft2
ROOM TAG
AREA
ROOM NUMBER
SYMBOL LEGEND
P01PARTITION TAG PARTITION TYPE
SIGNAGE TAG INT01-L1-001
(DOUBLE SIDED)
SIGN MARKER
SIGN PANEL INDICATOR
SIGN NUMBER
LEVEL INDICATOR
SIGN TYPE
XXXX (25)FFE TAG - CFCI COUNT (IF APPLICABLE)
XXXX (25)FFE TAG - GFCI COUNT (IF APPLICABLE)
XXXX (25)FFE TAG - GFGI COUNT (IF APPLICABLE)
XXXX (25)FFE TAG - ETRR COUNT (IF APPLICABLE)
CEILING LEGEND
GYPSUM BOARD (PAINTED)
APC-1 ( 2' x 2' )
2' x 2' SUPPLY
LINEAR DIFFUSER
EXIT SIGN
EXPOSED STRUCTURE
WALL WASH
RECESSED DOWNLIGHT
2' x 2' RETURN
LINEAR RETURN
8' - 0" CEILING TAG
HEIGHT A.F.F.
LIGHT WITH BATTERY BACKUP
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-001
AB
BR
EV
IA
TI
O
NS
, L
EG
EN
D
AN
D G
EN
ER
AL
N
O
TE
S
MCC
12892248
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
GENERAL NOTES
1 ALL NOTES, DETAILS AND FEATURES DRAWN AS APPLICABLE FOR ONE CONDITION SHALL BE APPLICABLE TO SIMILAR
CONDITIONS WHETHER OR NOT IT IS SPECIFICALLY INDICATED OR NOTED.
2 PROVIDE RESILIENT TRANSITION STRIP (RTS) WHERE TWO DIFFERENT FLOOR FINISHES MEET, TYPICALLY AT DOOR SILLS. ALSO
PROVIDE RTS WHERE NEW FINISH MEETS EXISTING, UNLESS THERE IS A DOOR THRESHOLD. RTS COLOR TO MATCH BASE 3 ALL DIMENSIONS ARE SHOWN FROM FACE OF FINISH TO FACE OF FINISH OR FACE OF CONCRETE.
4 UNLESS OTHERWISE NOTED, DOORS IN STUD FRAMED WALLS ARE 4" FROM ADJACENT WALLS
ETR EXISTING TO REMAIN PR. PAIR
EXIST. EXISTING PTD PAINTED WD. WOOD
ETC. ETCETERA O.D. OUTSIDE DIAMETER W/ WITH
EQUIP. EQUIPMENT OPNG. OPENING W.W.F. WELDED WIRE FABRIC
EQ EQUAL OFOI IS A SUBSET OF GOVERNMENT FURNISHED WRB WEATHER RESISTANT BARRIER
EMER. EMERGENCY O.F.O.I. OTHER FURNISHED OTHER INSTALLED W.P. WEATHER PROOFING
ELEV. ELEVATION O.C. ON CENTER W.C. WATER CLOSET
E.P. ELECTRICAL PANEL NO.,# NUMBER V. VOLTAGE, VOLTS
ELEC. ELECTRICAL N.T.S. NOT TO SCALE VWT VERTICAL WIND TUNNEL
EA EACH N.I.C. NOT IN CONTRACT VCT VINYL COMPOSITE TILE
D.F. DRINKING FOUNTAIN N/A NOT APPLICABLE VERT. VERTICAL
DWG. DRAWING MTG. MOUNTING U.N.O. UNLESS NOTED OTHERWISE
D. DRAIN MSGQ MARINE SECURITY GUARD QUARTERS UV ULTRA VIOLET
D.S. DOWNSPOUT MISC. MISCELLANEOUS TYP. TYPICAL
DN. DOWN MIN. MINIMUM T.V. TELEVISION
DWL. DOWEL MM. MILLIMETER TSS TECHNICAL SECURITY SYSTEM
DR. DOOR M. METER TRT. TREATED
DIM DIMENSION MTL METAL THRU. THROUGH
DIA. Ø DIAMETER MECH. MECHANICAL THRES. THRESHOLD
DET. DETAIL MAX. MAXIMUM THK. THICK
DEG. DEGREES MAS. MASONRY TEL. TELEPHONE
CONSTR. CONSTRUCTION MFR. MANUFACTURER TDY TEMPORARY DUTY
C.,COND. CONDUIT MH. MANHOLE T. TREAD
C.D. CONDENSATE UNIT L.L.V. LONG LEG VERTICAL SUSP. SUSPENDED
C.M.U. CONCRETE MASONRY UNIT L.L.H. LONG LEG HORIZONTAL STR.. STRUCTURE
CONT CONTINUOUS LBS. POUNDS STOR. STORAGE
CONC. CONCRETE LAV. LAVATORY STL. STEEL
COL. COLUMN LAM. LAMINATE STD. STANDARD
CL. CLOSET KIT. KITCHEN S.STL. STAINLESS STEEL
C.O. CLEAN OUT K.W. KILOWATTS S.F. SQUARE FOOT
CT CERAMIC TILE JT. JOINT SQ. SQUARE
CM. CENTIMETER JAN. JANITORS CLOSET SPEC. SPECIFICATION
CLG. CEILING INV. INVERT SIM SIMILAR
C.L. CENTER LINE INT. INTERIOR SHW SECURE HARDWARE
CIP CAST IN PLACE INSUL. INSULATION SHT. SHEET
C.I. CAST IRON I.D. INSIDE DIAMETER SS SOLID SURFACE
C.F.C.I. CONTRACTOR FURNISHED CONTRACTOR INSTALLED HOR. HORIZONTAL SER. SERVICE
CPT. CARPET H.M. HOLLOW METAL SEC. SECTION
CCTV CLOSED CIRCUIT TELEVISION CAMERA HT. HEIGHT SCHED. SCHEDULE
CAP. CAPACITY GYP. BD. GYPSUM DRYWALL BOARD R.O. ROUGH OPENING
CAB. CABINET GRD. GRID RM ROOM
BLDG. BUILDING GVL. GRAVEL R.D. ROOF DRAIN
BTU. BRITISH THERMAL UNIT G.F.G.I. GOVERNMENT FURNISHED GOVERNMENT INSTALLED RB RUBBER BASE
BTM. BOTTOM G.F.E GOVERNMENT FURNISHED EQUIPMENT R. RISER
BLKG. BLOCKING G.F.C.I. GOVERNMENT FURNISHED CONTRACTOR INSTALLED REQD. REQUIRED
BTWN. BETWEEN GOV'T GOVERNMENT REINF. REINFORCING
BRG. BEARING GEN. GENERATOR REF. REFRIGERATOR
B.O. BOTTOM OF GA. GAUGE REC RECCOMENDATIONS
BM. BEAM GALV. GALVANIZED QTY. QUANTITY
BSMT BASEMENT GAL. GALLON PROP. PROPERTY
BKR BD BACKER BOARD FTG. FOOTING PC. PRECAST
AUTO AUTOMATIC FLUOR. FLUORESCENT PWR. POWER
ARCH. ARCHITECTURAL F.D. FIRE DAMPENER P.S.I. POUNDS PER SQUARE INCH
APROX. APPROXIMATE FIN. FINISH P.C.F. POUNDS PER CUBIC FOOT
ALUM. ALUMINUM FT. FEET, FOOT PVC. POLYVINYL CHLORIDE CONDUIT/PIPE
ACP ACOUSTIC CEILING PANEL FO FACE OF PLYWD. PLYWOOD
A/C AIR CONDITIONING FE/BR FORCED ENTRY BALLISTIC RESISTANCE PLMB. PLUMBING
ADJ. ADJACENT FE FIRE EXTINGUISHER PL. PLATE
ACOUST. ACOUSTICAL EWC. ELECTRIC WATER COOLER P.LAM. PLASTIC LAMINATE
A.F.F. ABOVE FINISH FLOOR E.I.F.S EXTERIOR INSULATION FINISH SYSTEM PVMT. PAVEMENT
ABV ABOVE ETRR EXISTING TO BE REUSED/REINSTALLED PNL PANEL BOARD
ABBREVIATIONS
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
UP UP DN
DN
J
K
STAIR 1
J
K
MEZZANINE A
STAIR 1
J
K
STAIR 1
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
AD401
ST
AI
R O
NE
E
NL
AR
G
ED
D
EM
O P
LA
NS
MCC
12892252
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR ONE - LEVEL ONE DEMOLITION PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR ONE - MEZZANINE DEMOLITION PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR ONE - LEVEL TWO DEMOLITION PLANC1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 OWNER TO REMOVE ALL ITEMS CURRENTLY LOCATED
UNDER STAIRS
3 REFER TO ENGINEERING SERIES DEMOLITION DRAWINGS
FOR ADDITIONAL INFORMATION RELATED TO THE
REMOVAL OF LIGHTING, PIPING, CONDUIT, DUCTWORK,
ETC.
SHEET KEYNOTES
1 REMOVE CASED OPENING FRAMING/TRIM
2 REMOVE WATER FOUNTAIN
3 REMOVE WOOD LANDING IN ITS ENTIRETY
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
F
FO
UP UP DN
DN
J
K
STAIR 2
J
K
STAIR 2
MEZZANINE B
J
K
STAIR 2
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
AD402
ST
AI
R
TW
O E
NL
AR
G
ED
D
EM
O P
LA
NS
MCC
12892253
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR TWO - LEVEL ONE DEMOLITION PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR TWO - MEZZANINE DEMOLITION PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR TWO - LEVEL TWO DEMOLITION PLANC1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 OWNER TO REMOVE ALL ITEMS CURRENTLY LOCATED
UNDER STAIRS
3 REFER TO ENGINEERING SERIES DEMOLITION DRAWINGS
FOR ADDITIONAL INFORMATION RELATED TO THE
REMOVAL OF LIGHTING, PIPING, CONDUIT, DUCTWORK,
ETC.
SHEET KEYNOTES
1 PIPING TO BE DEMOLISHED, SEE PLBG DWGS
2 REMOVE CASED OPENING FRAMING/TRIM
3 REMOVE WOOD LANDING IN ITS ENTIRETY
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
H
STAIR 3A
H
009A
STAIR 3A
009B
STAIR 3B
H
STAIR 3B
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
AD403
ST
AI
R
TH
RE
E
EN
LA
RG
ED
D
EM
O P
LA
NS
MCC
12892254
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR THREE - LEVEL ONE DEMOLITION PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR THREE - MEZZANINE DEMOLITION PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR THREE - LEVEL TWO DEMOLITION PLANA4
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 OWNER TO REMOVE ALL ITEMS CURRENTLY LOCATED
UNDER STAIRS
3 REFER TO ENGINEERING SERIES DEMOLITION DRAWINGS
FOR ADDITIONAL INFORMATION RELATED TO THE
REMOVAL OF LIGHTING, PIPING, CONDUIT, DUCTWORK,
ETC.
SHEET KEYNOTES
1 REMOVE CASED OPENING FRAMING/TRIM
2 REMOVE TILE FLOORING AND TRANSITION STRIP
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
UP UP
F
FO
H
STAIR 4A
MEN RESTROOM
LOCKERS
1'
5"
8'
0"
6' - 0"
3'
1/
2"
6'
0"
AD404
D3
H
011A
STAIR 4A
011B
STAIR 4B
H
STAIR 4B
H
3' - 5" 1' - 6" 3' - 5" ±
1'
"5'
4"
3'
0"
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
AD404
ST
AI
R
FO
UR
E
NL
AR
G
ED
D
EM
O P
LA
NS
MCC
12892255
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR FOUR - LEVEL ONE DEMOLITION PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR FOUR - MEZZANINE DEMOLITION PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR FOUR - LEVEL TWO DEMOLITION PLANA4
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 OWNER TO REMOVE ALL ITEMS CURRENTLY LOCATED
UNDER STAIRS
3 REFER TO ENGINEERING SERIES DEMOLITION DRAWINGS
FOR ADDITIONAL INFORMATION RELATED TO THE
REMOVAL OF LIGHTING, PIPING, CONDUIT, DUCTWORK,
ETC.
SHEET KEYNOTES
1 FINISH FLOOR AND TOILET PARTITIONS NOT SHOWN FOR
CLARITY
2 REMOVE CASED OPENING FRAMING/TRIM
3 REMOVE DOOR
4 REMOVE FINISH FLOORING
5 REMOVE FINISH FLOORING AND SAW-CUT CONCRETE SLAB
6 REMOVE LOCKERS, SAVE FOR REUSE/REINSTALLATION
7 REMOVE MOVE SINK
8 REMOVE TOILET PARTITION
9 REMOVE TOILET PARTITION AND DOOR, SAVE FOR
REUSE/REINSTALLATION
10 REMOVE TOILET, SAVE FOR REUSE/REINSTALLATION
11 REMOVE WALL, SALVAGE WALL TILE FOR
REUSE/REISNTALLATION
12 REMOVE WALL INFILL
13 SAW-CUT CONCRETE SLAB. COORDINATE WITH PLUMBING
SCALE: 1/4" = 1'-0"AD404
MENS RESTROOM SLAB
DEMOLITION PLAND3
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
C
STAIR 5A
C
010A
STAIR 5A
010B
STAIR 5B
C
STAIR 5B
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
AD405
ST
AI
R
FI
VE
E
NL
AR
G
ED
D
EM
O P
LA
NS
MCC
12892256
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR FIVE - LEVEL ONE DEMOLITION PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR FIVE - MEZZANINE DEMOLITION PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR FIVE - LEVEL TWO DEMOLITION PLANA4
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 OWNER TO REMOVE ALL ITEMS CURRENTLY LOCATED
UNDER STAIRS
3 REFER TO ENGINEERING SERIES DEMOLITION DRAWINGS
FOR ADDITIONAL INFORMATION RELATED TO THE
REMOVAL OF LIGHTING, PIPING, CONDUIT, DUCTWORK,
ETC.
SHEET KEYNOTES
1 REMOVE CASED OPENING FRAMING/TRIM
2 REMOVE DOOR AND FRAME, SAVE DOOR FOR
REUSE/REINSTALLATION
3 REMOVE MOP SINK
4 REMOVE WALL INFILL
5 REMOVE WATER FOUNTAIN
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
C
STAIR 6A
2 1
C
012B
STAIR 6B
012A
STAIR 6A
C
STAIR 6B
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
AD406
ST
AI
R
SI
X
EN
LA
RG
ED
D
EM
O
P
LA
NS
MCC
12892257
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR SIX - LEVEL ONE DEMOLITION PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR SIX - MEZZANINE DEMOLITION PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR SIX - LEVEL TWO DEMOLITION PLANA4
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 OWNER TO REMOVE ALL ITEMS CURRENTLY LOCATED
UNDER STAIRS
3 REFER TO ENGINEERING SERIES DEMOLITION DRAWINGS
FOR ADDITIONAL INFORMATION RELATED TO THE
REMOVAL OF LIGHTING, PIPING, CONDUIT, DUCTWORK,
ETC.
SHEET KEYNOTES
1 REMOVE CASED OPENING FRAMING/TRIM
2 REMOVE FINISH FLOORING
3 REMOVE PIPING, SEE PLUMBING DWGS
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
UP UPUP
DN
AB
STAIR 71
AB
STAIR 7
MEZZANINE C
AB
STAIR 7
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
AD407
ST
AI
R
SE
VE
N
EN
LA
RG
ED
D
EM
O P
LA
NS
MCC
12892258
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR SEVEN - LEVEL ONE DEMOLITION PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR SEVEN - MEZZANINE FLOOR PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR SEVEN - LEVEL TWO DEMOLITION PLANC1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 OWNER TO REMOVE ALL ITEMS CURRENTLY LOCATED
UNDER STAIRS
3 REFER TO ENGINEERING SERIES DEMOLITION DRAWINGS
FOR ADDITIONAL INFORMATION RELATED TO THE
REMOVAL OF LIGHTING, PIPING, CONDUIT, DUCTWORK,
ETC.
SHEET KEYNOTES
1 REMOVE CASED OPENING FRAMING/TRIM
2 REMOVE WATER FOUNTAIN
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
UP UPDN
DN
AB
STAIR 8
AB
STAIR 8
MEZZANINE D
AB
STAIR 8
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
AD408
ST
AI
R
EI
G
HT
E
NL
AR
G
ED
D
EM
O
P
LA
NS
MCC
12892259
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR EIGHT - LEVEL ONE DEMOLITION PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR EIGHT - MEZZANINE DEMOLITION PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR EIGHT - LEVEL TWO DEMOLITION PLANC1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 OWNER TO REMOVE ALL ITEMS CURRENTLY LOCATED
UNDER STAIRS
3 REFER TO ENGINEERING SERIES DEMOLITION DRAWINGS
FOR ADDITIONAL INFORMATION RELATED TO THE
REMOVAL OF LIGHTING, PIPING, CONDUIT, DUCTWORK,
ETC.
SHEET KEYNOTES
1 REMOVE CASED OPENING FRAMING/TRIM
2 REMOVE WATER FOUNTAIN
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
H
LOCKERS
MEN RESTROOM
STAIR 4A
C
FLIGHT
EQUIPEMENT
STAIR 5A
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
AD409
DE
M
O
LI
TI
O
N
CE
IL
IN
G P
LA
NS
MCC
12892260
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"AD409
MENS RESTROOM DEMOLITION CEILING PLANA1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 REFER TO ENGINEERING SERIES DEMOLITION DRAWINGS
FOR ADDITIONAL INFORMATION RELATED TO THE
REMOVAL OF LIGHTING, PIPING, CONDUIT, DUCTWORK,
ETC.
SHEET KEYNOTES
1 REMOVE CEILING
2 REMOVE CEILING, SALVAGE FOR REUSE/REINSTALLATION
SCALE: 1/4" = 1'-0"AD409
STAIR FIVE DEMO CELIING PLANA3
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
J
AD401
A1
ABCDGHK
AD404
A1
A-404 A1
A-401 A1
AD402
A1
A-402 A1
AD403
A1
A-403 A1
AD405
A1
A-405 A1
AD406
A1
A-406 A1
A-407 A1
AD407
A1
A-408 A1
AD408
A1
EQ
EQ
A-502 B5
A-502 B5
SIM
A-502 B5
SIM
A-502 B5
SIM
A-502 B5
SIM
A-502 B5
SIM
A-502 B5
SIM
A-502 B5
SIM
A-502 B5
SIM
A-502 B5
SIM
A-502 C5
A-502 D5
GRAPHIC SCALE:GRAPHIC SCALE:
20' 010' 40' 80'20'
1" = 1'-0"= 20'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-101
LE
VE
L O
NE
E
XI
ST
IN
G
F
LO
O R
PL
AN
MCC
12892249
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1" = 20'-0"
LEVEL ONE EXISTING FLOOR PLAN
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
AD401
A3
ABCDGHK
A-401 A3
AD403
A3
A-403 A3
AD405
A3
A-405 A3
A-402 A3
AD402
A3
AD407
A3
A-408 A3
AD406
A3
AD404
A3
A-404 A3
A-406 A3
AD408
A3
A-407 A3
GRAPHIC SCALE:GRAPHIC SCALE:
20' 010' 40' 80'20'
1" = 1'-0"= 20'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-102
M
EZ
ZA
NI
NE
E
XI
ST
IN
G
F
LO
O R
PL
AN
MCC
12892250
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1" = 20'-0"
MEZZANINE EXISTING FLOOR PLAN
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
A-401 C1
ABCDGHK
A-402 C1
AD402
C1
AD403
A4
A-403 A4
AD405
A4
AD407
C1
A-408 C1
AD406
A4
AD404
A4
AD408
C1
A-405 A4
AD401
C1
A-407 C1
A-406 A4________________________________
A-404 A4
GRAPHIC SCALE:GRAPHIC SCALE:
20' 010' 40' 80'20'
1" = 1'-0"= 20'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-103
LE
VE
L
TW
O E
XI
ST
IN
G
F
LO
O R
PL
AN
MCC
12892251
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1" = 20'-0"
LEVEL TWO EXISTING FLOOR PLAN
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
K
STAIR 1
A1 A-421
A1 A-421
4' - 4"1
1' - 0"1'
0"
A-502 B5
SIM
A-502 B5
SIM
P25 P25
J
K
STAIR 1
MEZZANINE A
A1 A-421
A1 A-421
J
K
STAIR 1
A1 A-421
A1 A-421
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-401
ST
AI
R O
NE
E
NL
AR
G
ED
P
LA
NS
MCC
12892261
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR ONE - LEVEL ONE FLOOR PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR ONE - MEZZANINE FLOOR PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR ONE - LEVEL TWO FLOOR PLANC1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SHEET KEYNOTES
1 INFILL OPENING WITH 5/8", TYPE X, GYPSUM BOARD ON 3
5/8" METAL STUD. ALIGN FACE OF INFILL WALL WITH
EXISTING WALL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
K
STAIR 2
A1 A-422
A1 A-422
6" 6"
44" MIN
VIF
C3 A-502
J
K
STAIR 2
MEZZANINE B
A1 A-422
A1 A-422
J
K
STAIR 2 A1
A-422
A1 A-422
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-402
ST
AI
R
TW
O E
NL
AR
G
ED
P
LA
NS
MCC
12892262
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR TWO - LEVEL ONE FLOOR PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR TWO - MEZZANINE FLOOR PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR TWO - LEVEL TWO FLOOR PLANC1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SHEET KEYNOTES
1 INFILL OPENING WITH 5/8", TYPE X, GYPSUM BOARD ON 3
5/8" METAL STUD. ALIGN FACE OF INFILL WALL WITH
EXISTING WALL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
H
STAIR 3A
A1 A-423
A1 A-423
H
009B
STAIR 3B
009A
STAIR 3A
A1 A-423
A1 A-423
A3 A-423
A3 A-423
H
STAIR 3B
A3 A-423
A3 A-423
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-403
ST
AI
R
TH
RE
E
EN
LA
RG
ED
P
LA
NS
MCC
12892263
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR THREE - LEVEL ONE FLOOR PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR THREE - MEZZANINE FLOOR PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR THREE - LEVEL TWO FLOOR PLANA4
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SHEET KEYNOTES
1 HANGAR DOOR ASSEMBLY
2 INFILL OPENING WITH 5/8", TYPE X, GYPSUM BOARD ON 3
5/8" METAL STUD. ALIGN FACE OF INFILL WALL WITH
EXISTING WALL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
H
LOCKERS
STAIR 4A
MEN RESTROOM
120A
CORRIDOR
CLEAR
4' - 0"
A1 A-424
A1 A-424
AL
IG
N
120A
1' - 6"
5'
0"
A-431A1
A-431
B1
P31
P25
P25
P31A
P36A
H
011B
STAIR 4B
011A
STAIR 4A
A1 A-424
A1 A-424
A3 A-424
A3 A-424
H
A3 A-424
A3 A-424
STAIR 4B
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-404
ST
AI
R
FO
UR
E
NL
AR
G
ED
P
LA
NS
MCC
12892264
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR FOUR - LEVEL ONE FLOOR PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR FOUR - MEZZANINE FLOOR PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR FOUR - LEVEL TWO FLOOR PLANA4
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SHEET KEYNOTES
1 INFILL OPENING WITH 5/8", TYPE X, GYPSUM BOARD ON 3
5/8" METAL STUD. ALIGN FACE OF INFILL WALL WITH
EXISTING WALL
2 INSTALL NEW CERAMIC FLOOR TILE OVER CONCRETE
SLAB. ALIGN WITH AND MATCH EXISTING FLOORING
PATTERN.
3 INSTALL NEW CERAMIC FLOOR TILE. ALIGN WITH AND
MATCH EXISTING FLOORING PATTERN.
4 INSTALL NEW VCT-1 FLOORING IN CORRIDOR
5 REINSTALL ADA TOILET PARTITION
6 REINSTALL LOCKER
7 REINSTALL TOILET
8 TOILET PARTITION AND DOOR
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
C
STAIR 5A
A1 A-425
A1 A-425
A3 A-425
A3 A-425
5'
4"
7' - 8"
FLIGHT
EQUIPEMENT
167A
VESTIBULE
167B 167C
P25
P36
P36
167A
C
010A
STAIR 5A
010B
STAIR 5B
A1 A-425
A1 A-425
A3 A-425
A3 A-425
C
STAIR 5B
A3 A-425
A3 A-425
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-405
ST
AI
R
FI
VE
E
NL
AR
G
ED
P
LA
NS
MCC
12892265
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR FIVE - LEVEL ONE FLOOR PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR FIVE - MEZZANINE FLOOR PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR FIVE - LEVEL TWO FLOOR PLANA4
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SHEET KEYNOTES
1 INFILL OPENING WITH 5/8", TYPE X, GYPSUM BOARD ON 3
5/8" METAL STUD. ALIGN FACE OF INFILL WALL WITH
EXISTING WALL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
C
STAIR 6A
A1 A-426
A1 A-426
A3 A-426
A3 A-426
C
012B
STAIR 6B
012A
STAIR 6A
A1 A-426
A1 A-426
A3 A-426
A3 A-426
C
STAIR 6B
A3 A-426
A3 A-426
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-406
ST
AI
R
SI
X
EN
LA
RG
ED
P
LA
NS
MCC
12892266
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR SIX - LEVEL ONE FLOOR PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR SIX - MEZZANINE FLOOR PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR SIX - LEVEL TWO FLOOR PLANA4
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SHEET KEYNOTES
1 INFILL OPENING WITH 5/8", TYPE X, GYPSUM BOARD ON 3
5/8" METAL STUD. ALIGN FACE OF INFILL WALL WITH
EXISTING WALL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
AB
STAIR 7
A1 A-427
A1 A-427
1' - 0"
A-502 B5
SIM
A-502 B5
SIM
P25
AB
MEZZANINE C
STAIR 7
A1 A-427
A1 A-427
AB
STAIR 7
A1 A-427
A1 A-427
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-407
ST
AI
R
SE
VE
N
EN
LA
RG
ED
P
LA
NS
MCC
12892267
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR SEVEN - LEVEL ONE FLOOR PLANA1
SCALE: 1/4" = 1'-0"A-102
STAIR SEVEN - MEZZANINE FLOOR PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR SEVEN - LEVEL TWO FLOOR PLANC1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SHEET KEYNOTES
1 INFILL OPENING WITH 5/8", TYPE X, GYPSUM BOARD ON 3
5/8" METAL STUD. ALIGN FACE OF INFILL WALL WITH
EXISTING WALL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
AB
STAIR 8
A1 A-428
A1 A-428
1' - 0"
ALIGN
10"
1/
2" ________________________________
A-502 B5
SIM
A-502 B5
SIM
P25
AB
STAIR 8
MEZZANINE D
A1 A-428
A1 A-428
AB
STAIR 8
A1 A-428
A1 A-428
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-408
ST
AI
R
EI
G
HT
E
NL
AR
G
ED
P
LA
NS
MCC
12892268
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-101
STAIR EIGHT - LEVEL ONE FLOOR PLANA1 SCALE: 1/4" = 1'-0"A-102
STAIR EIGHT - MEZZANINE FLOOR PLANA3
SCALE: 1/4" = 1'-0"A-103
STAIR EIGHT - LEVEL TWO FLOOR PLANC1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
SHEET KEYNOTES
1 INFILL OPENING WITH 5/8", TYPE X, GYPSUM BOARD ON 3
5/8" METAL STUD. ALIGN FACE OF INFILL WALL WITH
EXISTING WALL
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
K
8' - 0"115
STAIR 1
J
K
STAIR 1
J
K
STAIR 1
MEZZANINE A
9' - 0"
10' - 0"
3' - 6" 4' - 0"
6' - 3 1/4" 1' - 7"
1'
5"
5'
1"
6' - 6"
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-411
ST
AI
R O
NE
E
NL
AR
G
ED
C
EI
LI
NG
P
LA
NS
MCC
12892269
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-411
STAIR ONE LEVEL ONE CEILING PLANA1
SCALE: 1/4" = 1'-0"A-411
STAIR ONE LEVEL TWO CEILING PLANC1
SCALE: 1/4" = 1'-0"A-411
STAIR ONE MEZZANINE CEILING PLANA3
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 SEE A-001 FOR CEILING LEGEND
3 CONTRACTOR MUST INSTALL FIRE RATED ACCESS
POINT(S) TO ALLOW ACESS TO RECESSED JUNCTION
BOX(ES), SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
K
STAIR 2
8' - 0"
4' - 0" 5' - 6"
4'
1"
7' - 6"
7' - 4"
J
K
9' - 0"
STAIR 2
MEZZANINE B
3'
9" 1'
0"
2' - 5 1/2" 13' - 8 1/2" 8' - 4"
1'
0"
1' - 8" 5' - 2"
7' - 6"
10' - 0"
J
K
STAIR 2
4' 02' 8' 12'4'
GRAPHIC SCALE: 1/4"GRAPHIC SCALE: = 1'-0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
MAXIMO WORKORDER NO:
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
PROJECT NO:
D E
P
AR
TM
E
N T
O F
TH
E
N A
VY
N
A
VA
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
YS
TE
M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
NICHOLAS A. HALL
NICHOLAS A. HALL
PATRICK FAULKNER
NAVFAC FP
A-412
ST
AI
R
TW
O E
NL
AR
G
ED
C
EI
LI
NG
P
LA
NS
MCC
12892270
JLH JLH
03/05/2024
0199.21
7195017
CH
ER
RY
P
OI
NT
, N
OR
TH
C
AR
OL
IN
A
NA
VF
AC
N
A
VF
AC
S
YS
C
O M
M
ID
'N A
V
FA
C S
YS
C
O M
M
ID
-A
TL
AN
TI
C
FR
C -E
, M A
R
IN
E C
O R
PS
A
IR
S
TA
TI
O N
U P
G R
A D
E L
IF
E
S A
FE
TY
S Y
S
TE
M H
A N
G A
R
FINAL SUBMITTAL
SCALE: 1/4" = 1'-0"A-412
STAIR TWO LEVEL ONE CEILING PLANA1
SCALE: 1/4" = 1'-0"A-412
STAIR TWO MEZZANINE CEILING PLANA3
SCALE: 1/4" = 1'-0"A-412
STAIR TWO LEVEL TWO CEILING PLANC1
GENERAL SHEET NOTES
1 REFER TO G-003 FOR PHASING LEGEND
2 SEE A-001 FOR CEILING LEGEND
3 CONTRACTOR MUST INSTALL FIRE RATED ACCESS
POINT(S) TO ALLOW ACESS TO RECESSED JUNCTION
BOX(ES),…