Amendment 0004.pdf
PDF 1 MB Posted
- Attached to
- B133 RENOVATIONS (FRCE)
- Solicitation number
- N400857103893
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| RFP 7103893 B133 RENOVATIONS AT FRCE.pdf | ||
| 7103893 SpecsAsOne.pdf | ||
| 7103893 DrawingsAsOne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION
7103893
B133 RENOVATIONS (FRCE)
MCAS Cherry Point, NC
AMENDMENT #0004
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0004 04/27/2021 7103893
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
CG MCAS Cherry Point
FACILITIES, ROICC
B-163, CURTIS ROAD
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
B133 RENOVATIONS (FRCE)
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7103893 B133 RENOVATIONS (FRCE), Marine Corps Air Station Cherry Point, NC
This amendment is being issued to respond to pre-award RFIs and provide updated drawing.
The deadline to submit pre-award RFIs of 26 April 2021 has passed. No further RFIs will be accepted.
The proposal due date of 5 May 2021 at 1200 local times remains UNCHANGED.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Amendment 0003 7103893 - B133 RENOVATIONS (FRCE)
RFI Responses:
6. There is no spec section for the Packaged Rooftop Heat Pumps scheduled on M-601. Will one be provided?
Response:
Submit Proposals in accordance with RFP, Specifications, revised spec section dated 27 April 2021, Drawings, and all Amendments.
7. The Packaged Rooftop Heat Pump schedule on M-601 shows energy recovery conditions.
There is no energy recovery spec nor is it mentioned anywhere else on the plans including the controls sequence. Is a form of energy recovery required? If so, will there be a spec or revised plans to provide more details?
Response:
Submit Proposals in accordance with RFP, Specifications, Drawings, attached revised drawing dated 27 April 2021, and all Amendments.
8. The packaged rooftop unit schedule calls out energy recovery, but the controls sequence for the RTUs does not show any sort of energy recovery on it. Is energy recovery needed?
Response:
Submit Proposals in accordance with RFP, Specifications, Drawings, attached revised drawing dated 27 April 2021, and all Amendments.
9. Is there a specification section for the packaged rooftop units? 23 81 00.00 20 covers VRF and split system air conditioning units
Response:
Submit Proposals in accordance with RFP, Specifications, revised spec section dated 27 April 2021, Drawings, and all Amendments.
CONTINUATION SHEET
PROJECT TABLE OF CONTENTS
SECTION 23 81 00.00 20, UNITARY AIR CONDITIONG EQUIPMENT is deleted and
23 81 00.00 20, UNITARY AIR CONDITIONG EQUIPMENT, dated 27 APRIL 2021, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.
SECTION 00 01 15 – LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
The following drawings are revised as of 27 APR 2021:
NAVFAC DWG NO. TITLE
12830538 MECHANICAL SCHEDULES
These revised drawings accompany this Amendment.
SECTION 23 81 00.00 20
UNITARY AIR CONDITIONING EQUIPMENT
11/09
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI 350 (2008) Sound Rating of Non-Ducted Indoor Air-Conditioning Equipment
AHRI DCAACP (Online) Directory of Certified Applied Air-Conditioning Products
AHRI DCUP (Online) Directory of Certified Unitary Products
ANSI/AHRI 210/240 (2008; Add 1 2011; Add 2 2012) Performance Rating of Unitary Air-Conditioning & Air-Source Heat Pump Equipment
ANSI/AHRI 340/360 (2007; Addendum 1 2010; Addendum 2 2011) Performance Rating of Commercial and Industrial Unitary Air-Conditioning and Heat Pump Equipment
ANSI/AHRI/CSA 310/380 (2014) Standard for Packaged Terminal Air-Conditioners and Heat Pumps
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ANSI/ASHRAE 15 & 34 (2013; Addenda A 2014; ERTA 1 2014; ERTA 2
2015; INT 1 2015; ERTA 3 2015) ANSI/ASHRAE
Standard 15-Safety Standard for Refrigeration Systems and ANSI/ASHRAE Standard 34-Designation and Safety Classification of Refrigerants
ASHRAE 52.2 (2012; Errata 2013; INT 1 2014; ADD A, B, AND D SUPP 2015; INT 3 2015; Errata 2 2015; ADD C 2015) Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size
ASHRAE 55 (2013; Errata 1 2014; Addenda A 2014; INT 1 2014; Errata 2-4 2014; Addenda B 2014;
Errata 5 2014; Errata 6 2015; INT 2 2015;
Errata 7 2015) Thermal Environmental
Renovations at FRCE CONTRACT A: Building 133 7103893
REVISED 27 APRIL 2021
Conditions for Human Occupancy
ASHRAE 62.1 (2010; Errata 2011; INT 3 2012; INT 4 2012; INT 5 2013) Ventilation for Acceptable Indoor Air Quality
AMERICAN WELDING SOCIETY (AWS)
AWS A5.8/A5.8M (2011; Amendment 2012) Specification for Filler Metals for Brazing and Braze Welding
ASME INTERNATIONAL (ASME)
ASME B16.22 (2013) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ASME B31.5 (2013) Refrigeration Piping and Heat Transfer Components
ASSOCIATION OF HOME APPLIANCE MANUFACTURERS (AHAM)
AHAM RAC-1 (1982; R2008) Directory of Certified Room Air Conditioners
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2013) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A653/A653M (2015) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM B117 (2011) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM B280 (2013) Standard Specification for Seamless Copper Tube for Air Conditioning and Refrigeration Field Service
ASTM B88 (2014) Standard Specification for Seamless Copper Water Tube
ASTM B88M (2013) Standard Specification for Seamless Copper Water Tube (Metric)
ASTM C534/C534M (2014) Standard Specification for Preformed Flexible Elastomeric Cellular Thermal Insulation in Sheet and Tubular Form
ASTM D1654 (2008) Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments
ASTM E84 (2015a) Standard Test Method for Surface Burning Characteristics of Building Materials
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-58 (1993; Reaffirmed 2010) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
MSS SP-69 (2003; Notice 2012) Pipe Hangers and Supports - Selection and Application (ANSI Approved American National Standard)
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 1 (2000; R 2015) Standard for Industrial Control and Systems: General Requirements
NEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 6 (1993; R 2011) Enclosures
NEMA MG 1 (2014) Motors and Generators
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-DTL-5541 (2006; Rev F) Chemical Conversion Coatings on Aluminum and Aluminum Alloys
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
CID A-A-50502 (Basic) Air Conditioners, (Unitary Heat Pump), Air to Air (3,000 to 300,000 BTU)
UNDERWRITERS LABORATORIES (UL)
UL 109 (1997; Reprint Aug 2013) Tube Fittings for Flammable and Combustible Fluids, Refrigeration Service, and Marine Use
UL 484 (2014; Reprint Jul 2015) Standard for Room Air Conditioners
UL 873 (2007; Reprint Feb 2015) Standard for Temperature-Indicating and -Regulating Equipment
UL 900 (2015) Standard for Air Filter Units
1.2 RELATED REQUIREMENTS
Section 23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS, applies to this section with the additions and modifications specified herein.
1.3 SUBMITTALS
Government approval is required for all submittals. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Field-Assembled Refrigerant Piping
Control System Wiring Diagrams
SD-03 Product Data
Heat Pumps
Include documentation for Energy Star qualifications or meeting FEMP requirements. Indicate Energy Efficiency Rating.
Filters
Refrigerant : Provide MSDS sheets for all refrigerants
Refrigerant Piping and Accessories
Coatings for Finned Tube Coils
For packaged terminal units, include indoor noise rating.
SD-06 Test Reports
Salt-Spray Tests
Start-Up and Initial Operational Tests
SD-08 Manufacturer's Instructions
Heat Pumps , air to air
Filters
Refrigerant Piping and Accessories
SD-10 Operation and Maintenance Data
, Data Package 3
, Data Package 3
Heat Pumps , air to air, Data Package 3
, Data Package 3
Filters , Data Package 2
, Data Package 2
Submit in accordance with Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
SD-11 Closeout Submittals
Posted Operating Instructions
Energy Efficient Equipment for Unitary Air Conditioning Equipment ;
S
Ozone Depleting Substances ; S
Indoor Air Quality During Construction ; S
1.4 QUALITY ASSURANCE
1.4.1 Modification of References
Accomplish work in accordance with the referenced publications, except as modified by this section. Consider the advisory or recommended provisions to be mandatory, as though the word "shall" had been substituted for the words "should" or "could" or "may," wherever they appear. Interpret reference to "the Authority having jurisdiction," "the Administrative Authority," "the Owner," or "the Design Engineer" to mean the Contracting Officer.
1.4.2 Detail Drawing
For refrigerant piping, submit piping, including pipe sizes. Submit control system wiring diagrams .
1.4.3 Safety
Design, manufacture, and installation of unitary air conditioning equipment shall conform to ANSI/ASHRAE 15 & 34 .
1.4.4 Posted Operating Instructions
Submit posted operating instructions for each packaged air conditioning unit.
1.4.5 Sizing
Size equipment based on Design Manual CS from the Air Conditioning Contractors of America; do not oversize.
1.5 REFRIGERANTS
Refrigerants shall have an Ozone Depletion Potential (ODP) of 0.0. The ODP shall be in accordance with the "Montreal Protocol On Substances That Deplete The Ozone Layer," September 1987, sponsored by the United Nations Environment Programme. CFCs and HCFCs shall not be permitted.
Refrigerant shall be an approved alternative refrigerant per EPA's Significant New Alternative Policy (SNAP) listing.
1.6 ENVIRONMENTAL REQUIREMENTS
For proper Indoor Environmental Quality, maintain positive pressure within the building. Ventilation shall meet or exceed ASHRAE 62.1 and all published addenda. Meet or exceed filter media efficiency as tested in accordance with ASHRAE 52.2 . Thermal comfort shall meet or exceed
ASHRAE 55.
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:
2.1.1 Energy Efficient Equipment for Unitary Air Conditioning Equipment
Provide unitary air conditioning equipment meeting the efficiency requirements as stated within this section and provide documentation in conformance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph
ENERGY EFFICIENT EQUIPMENT.
2.1.2 Ozone Depleting Substances
Unitary air conditioning equipment must not use CFC-based refrigerants, and must have an Ozone Depletion Potential (ODP) no greater than 0.0, with exception to R-123, in conformance with this section. Provide documentation in conformance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph OZONE DEPLETING SUBSTANCES.
2.2 HEAT PUMPS
CID A-A-50502 , except as modified in this article. List units with capacities smaller than 135,000 Btu/hr in the AHRI DCUP; in lieu of listing in the AHRI Directory, a letter of certification from AHRI that the units have been certified and will be listed in the next Directory will be acceptable. Provide factory assembled units complete with accessories, wiring, piping, and controls. Provide units with supplemental electric heaters , and air filters as specified in the paragraph FILTERS.
2.2.1 Energy Performance
Energy performance shall be in accordance with CID A-A-50502 . Heat pumps must include the Energy Star label affixed to the equipment.
2.2.2 Air Coils
Extended-surface fin and tube type with seamless copper or aluminum tubes with copper or aluminum fins securely bonded to the tubes. On coils with all-aluminum construction, provide tubes of aluminum alloy 1100, 1200, or 3102; provide fins of aluminum alloy 7072; and provide tube sheets of aluminum alloy 7072 or 5052. Provide a coating on outdoor air coils as specified in the paragraph COATINGS FOR FINNED TUBE COILS. Coils to be coated shall be part of manufacturer's standard product for capacities and ratings indicated and specified. Provide plate type fins.
2.2.3 Supplemental Electric Heaters
Provide electrical resistance heaters integral with the unit . Heaters shall have a total capacity as indicated. Provide internal fusing for heaters.
2.2.4 Compressors
For compressors above 20 tons , compressor speed shall not exceed 3450 rpm. For equipment over 10 tons , provide automatic capacity reduction of at least 50 percent of rated capacity. Capacity reduction may be accomplished by cylinder unloading, use of multiple, but not more than four compressors, or a combination of the two methods. Units with cylinder unloading shall start with capacity reduction devices in the unloaded position. Units with multiple compressors shall have a means to sequence starting of compressors. Provide compressors with devices to prevent short cycling when shutdown by safety controls. Provide reciprocating compressors with crankcase heaters, and vibration isolators.
2.2.5 Mounting Provisions
Provide units that permit mounting as indicated.
2.3 FILTERS
Provide filters to filter return air and locate inside air conditioners .
Provide cleanable (reusable) type. Filters shall conform to UL 900 , Class 1 . Polyurethane filters shall not be used on units with multiframe filters.
2.3.1 Cleanable Type Filters
Provide sufficient oil to coat filters six times based on one pint of oil per each 10 square feet of filter area. Provide washing and charging tanks for cleaning and coating filters. Filters shall have a MERV of 8 when tested in accordance with ASHRAE 52.2 .
2.4 COATINGS FOR FINNED TUBE COILS
Where stipulated in equipment specifications of this section, coat finned tube coils of the affected equipment as specified below. Apply coating at the premises of a company specializing in such work. Degrease and prepare for coating in accordance with the coating applicator's procedures for the type of metals involved. Completed coating shall show no evidence of softening, blistering, cracking, crazing, flaking, loss of adhesion, or "bridging" between the fins.
2.4.1 Phenolic Coating
Provide a resin base thermosetting phenolic coating. Apply coating by immersion dipping of the entire coil. Provide a minimum of two coats.
Bake or heat dry coils following immersions. After final immersion and prior to final baking, spray entire coil with particular emphasis given to building up coating on sheared edges. Total dry film thickness shall be
2.5 to 3.0 mils . Coil must pass ASTM B117 3000 hour salt spray resistance test as installed. The heat transfer rating of phenolic-coated coils should be as installed (i.e. after coating).
2.5 MOTORS AND STARTERS
NEMA MG 1, NEMA ICS 1 , and NEMA ICS 2 . Variable speed. Motors less than 1 hp shall meet NEMA High Efficiency requirements. Motors 1 hp and larger shall meet NEMA Premium Efficiency requirements. Determine specific motor characteristics to ensure provision of correctly sized starters and overload heaters. Provide motors to operate at full capacity with a voltage variation of plus or minus 10 percent of the motor voltage rating.
Motor size shall be sufficient for the duty to be performed and shall not exceed its full load nameplate current rating when driven equipment is operated at specified capacity under the most severe conditions likely to be encountered. When motor size provided differs from size indicated or specified, the Contractor shall make the necessary adjustments to the wiring, disconnect devices, and branch circuit protection to accommodate equipment actually provided. Provide reduced voltage type motor starters.
Provide general-purpose type starter enclosures in accordance with
NEMA ICS 6 .
2.6 REFRIGERANT PIPING AND ACCESSORIES
Provide accessories as specified in CID A-A-50502 and this section.
Provide suction line accumulators as recommended by equipment manufacturer's installation instructions.
2.6.1 Factory Charged Tubing
Provide extra soft, deoxidized, bright annealed copper tubing conforming to ASTM B280, factory dehydrated and furnished with a balanced charge of refrigerant recommended by manufacturer of equipment being connected.
Factory insulate suction line tubing with 3/8 inch minimum thickness of closed cell, foamed plastic conforming to ASTM C534/C534M with a permeance rating not to exceed 1.0. Provide quick-connectors with caps or plugs to protect couplings. Include couplings for suction and liquid line connections of the indoor and outdoor sections.
2.6.2 Field-Assembled Refrigerant Piping
Material and dimensional requirements for field-assembled refrigerant piping, valves, fittings, and accessories shall conform to ANSI/ASHRAE 15 & 34 and ASME B31.5 , except as herein specified. Factory clean, dehydrate, and seal piping before delivery to the project location. Provide seamless copper tubing, hard drawn, Type K or L, conforming to ASTM B88, except that tubing with outside diameters of 1/4 inch and 3/8 inch shall have nominal wall thickness of not less than 0.030 inch and 0.032 inch , respectively. Soft annealed copper tubing conforming to ASTM B280 may be used where flare connections to equipment are required only in nominal sizes less than one inch outside diameter.
2.6.3 Fittings
ASME B16.22 for solder-joint fittings. UL 109 for flared tube fittings.
2.6.4 Brazing Filler Material
AWS A5.8/A5.8M .
2.6.5 Pipe Hangers and Supports
MSS SP-69 and MSS SP-58 , Type 1, except as indicated otherwise.
2.6.6 Pipe Sleeves
Provide sleeves where piping passes through walls, floors, roofs, and partitions. Secure sleeves in proper position and location during construction. Provide sleeves of sufficient length to pass through entire thickness of walls, floors, roofs, and partitions. Provide not less than
0.25 inch space between exterior of piping or pipe insulation and interior of sleeve. Firmly pack space with insulation and caulk at both ends of the sleeve with plastic waterproof cement which will dry to a firm but pliable mass, or provide a segmented elastomeric seal.
2.6.6.1 Sleeves in Masonry and Concrete Walls, Floors, and Roofs
Provide Schedule 40 or Standard Weight zinc-coated steel pipe sleeves.
Extend sleeves in floor slabs 3 inches above finished floor.
2.6.6.2 Sleeves in Partitions and Non-Masonry Structures
Provide zinc-coated steel sheet sleeves having a nominal weight of not less than 0.90 pound per square foot , in partitions and other than masonry and concrete walls, floors, and roofs.
2.7 FINISHES
Provide steel surfaces of equipment including packaged terminal units, heat pumps, and air conditioners, that do not have a zinc coating conforming to ASTM A123/A123M , or a duplex coating of zinc and paint, with a factory applied coating or paint system. Provide a coating or paint system on actual equipment identical to that on salt-spray test specimens with respect to materials, conditions of application, and dry-film thickness.
2.8 SOURCE QUALITY CONTROL
2.8.1 Salt-Spray Tests
Salt-spray test the factory-applied coating or paint system of equipment including packaged terminal units, heat pumps, and air conditioners in accordance with ASTM B117. Conduct test for 1000 hours for equipment installed outdoors, or 125 hours for equipment installed indoors. Test specimens shall have a standard scribe mark as defined in ASTM D1654.
Upon completion of exposure, evaluate and rate the coating or paint system in accordance with procedures A and B of ASTM D1654. Rating of failure at the scribe mark shall not be less than six, average creepage not greater than 1/8 inch . Rating of the unscribed area shall not be less than 10, no failure.
PART 3 EXECUTION
3.1 CONSTRUCTION-_RELATED SUSTAINABILITY CRITERIA
Perform and document the following:
3.1.1 Indoor Air Quality During Construction
Provide documentation showing that after construction ends, and prior to occupancy, new filters were installed in conformance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph INDOOR AIR QUALITY DURING CONSTRUCTION.
3.2 EQUIPMENT INSTALLATION
Install equipment and components in a manner to ensure proper and sequential operation of equipment and equipment controls. Install equipment not covered in this section, or in manufacturer's instructions, as recommended by manufacturer's representative. Provide proper foundations for mounting of equipment, accessories, appurtenances, piping and controls including, but not limited to, supports, vibration isolators, stands, guides, anchors, clamps and brackets. Foundations for equipment shall conform to equipment manufacturer's recommendation, unless otherwise indicated. Set anchor bolts and sleeves using templates. Provide anchor bolts of adequate length, and provide with welded-on plates on the head end embedded in the concrete. Level equipment bases, using jacks or steel wedges, and neatly grout-in with a nonshrinking type of grouting mortar.
Locate equipment to allow working space for servicing including shaft removal, disassembling compressor cylinders and pistons, replacing or adjusting drives, motors, or shaft seals, access to water heads and valves of shell and tube equipment, tube cleaning or replacement, access to automatic controls, refrigerant charging, lubrication, oil draining and working clearance under overhead lines. Provide electric isolation between dissimilar metals for the purpose of minimizing galvanic corrosion.
3.2.1 Packaged Terminal Air Conditioners and Heat Pumps
Wall sleeve installation shall provide a positive weathertight and airtight seal.
3.2.2 Unitary Air Conditioning System
Install as indicated, in accordance with requirements of ANSI/ASHRAE 15 & 34 , and the manufacturer's installation and operational instructions.
3.3 PIPING
Brazing, bending, forming and assembly of refrigerant piping shall conform to ASME B31.5 .
3.3.1 Pipe Hangers and Supports
Design and fabrication of pipe hangers, supports, and welding attachments shall conform to MSS SP-58 . Installation of hanger types and supports for bare and covered pipes shall conform to MSS SP-69 for the system temperature range. Unless otherwise indicated, horizontal and vertical piping attachments shall conform to MSS SP-58 .
3.3.2 Refrigerant Piping
Cut pipe to measurements established at the site and work into place without springing or forcing. Install piping with sufficient flexibility to provide for expansion and contraction due to temperature fluctuation.
Where pipe passes through building structure pipe joints shall not be concealed, but shall be located where they may be readily inspected.
Install piping to be insulated with sufficient clearance to permit application of insulation. Install piping as indicated and detailed, to avoid interference with other piping, conduit, or equipment. Except where specifically indicated otherwise, run piping plumb and straight and parallel to walls and ceilings. Trapping of lines will not be permitted except where indicated. Provide sleeves of suitable size for lines passing through building structure. Braze refrigerant piping with silver solder complying with AWS A5.8/A5.8M . Inside of tubing and fittings shall be free of flux. Clean parts to be jointed with emery cloth and keep hot until solder has penetrated full depth of fitting and extra flux has been expelled. Cool joints in air and remove flame marks and traces of flux.
During brazing operation, prevent oxide film from forming on inside of tubing by slowly flowing dry nitrogen through tubing to expel air. Make provisions to automatically return oil on halocarbon systems.
Installation of piping shall comply with ASME B31.5 .
3.3.3 Returning Oil From Refrigerant System
Install refrigerant lines so that gas velocity in the evaporator suction line is sufficient to move oil along with gas to the compressor. Where equipment location requires vertical risers, line shall be sized to maintain sufficient velocity to lift oil at minimum system loading and corresponding reduction of gas volume. Install a double riser when excess velocity and pressure drop would result from full system loading. Larger riser shall have a trap, of minimum volume, obtained by use of 90- and 45-degree ells. Arrange small riser with inlet close to bottom of horizontal line, and connect to top of upper horizontal line. Do not install valves in risers.
3.3.4 Refrigerant Driers, Sight Glass Indicators, and Strainers
Provide refrigerant driers, sight glass liquid indicators, and strainers in refrigerant piping in accordance with CID A-A-50502 when not furnished by the manufacturer as part of the equipment. Install driers in liquid line with service valves and valved bypass line the same size as liquid line in which dryer is installed. Size of driers shall be determined by piping and installation of the unit on location. Install dryers of 50 cubic inches and larger vertically with the cover for removing cartridge at the bottom. Install moisture indicators in the liquid line downstream of the drier. Indicator connections shall be the same size as the liquid line in which it is installed.
3.3.5 Strainer Locations and Installation
Locate strainers close to equipment they are to protect. Provide a strainer in common refrigerant liquid supply to two or more thermal valves in parallel when each thermal valve has a built-in strainer. Install strainers with screen down and in direction of flow as indicated on strainer's body.
3.3.6 Solenoid Valve Installation
Install solenoid valves in horizontal lines with stem vertical and with flow in direction indicated on valve. If not incorporated as integral part of the valve, provide a strainer upstream of the solenoid valve.
Provide service valves upstream of the solenoid valve, upstream of the strainer, and downstream of the solenoid valve. Remove the internal parts of the solenoid valve when brazing the valve.
3.4 AUXILIARY DRAIN PANS, DRAIN CONNECTIONS, AND DRAIN LINES
Provide auxiliary drain pans under units located above finished ceilings or over mechanical or electrical equipment where condensate overflow will cause damage to ceilings, piping, and equipment below. Provide separate drain lines for the unit drain and auxiliary drain pans. Trap drain pans from the bottom to ensure complete pan drainage. Provide drain lines full size of drain opening. Traps and piping to drainage disposal points shall conform to Section 22 00 00 PLUMBING, GENERAL PURPOSE.
3.5 ACCESS PANELS
Provide access panels for concealed valves, controls, dampers, and other fittings requiring inspection and maintenance.
3.6 AIR FILTERS
Allow access space for servicing filters. Install filters with suitable sealing to prevent bypassing of air.
3.7 IDENTIFICATION TAGS AND PLATES
Provide equipment, gages, thermometers, valves, and controllers with tags numbered and stamped for their use. Provide plates and tags of brass or suitable nonferrous material, securely mounted or attached. Provide minimum letter and numeral size of 1/8 inch high.
3.8 FIELD QUALITY CONTROL
3.8.1 Leak Testing
Upon completion of installation of air conditioning equipment, test factory- and field-installed refrigerant piping with an electronic-type leak detector. Use same type of refrigerant to be provided in the system for leak testing. When nitrogen is used to boost system pressure for testing, ensure that it is eliminated from the system before charging.
Minimum refrigerant leak field test pressure shall be as specified in ANSI/ASHRAE 15 & 34 , except that test pressure shall not exceed 150 psig on hermetic compressors unless otherwise specified as a low side test pressure on the equipment nameplate. If leaks are detected at time of installation or during warranty period, remove the entire refrigerant charge from the system, correct leaks, and retest system.
3.8.2 Evacuation, Dehydration, and Charging
After field charged refrigerant system is found to be without leaks or after leaks have been repaired on field-charged and factory-charged systems, evacuate the system using a reliable gage and a vacuum pump capable of pulling a vacuum of at least one mm Hg absolute. Evacuate system in accordance with the triple-evacuation and blotter method or in accordance with equipment manufacturer's printed instructions and recharge system.
3.8.3 Start-Up and Initial Operational Tests
Test the air conditioning systems and systems components for proper operation. Adjust safety and automatic control instruments as necessary to ensure proper operation and sequence. Conduct operational tests for not less than 8 hours.
3.8.4 Performance Tests
Upon completion of evacuation, charging, startup, final leak testing, and proper adjustment of controls, test the systems to demonstrate compliance with performance and capacity requirements. Test systems for not less than 8 hours, record readings hourly. At the end of the test period, average the readings, and the average shall be considered to be the system performance. Record the following readings:
Entering Dry Bulb Temperature, deg F Entering Wet Bulb Temperature, deg F Leaving Dry Bulb Temperature, deg F Leaving Wet Bulb Temperature, deg F Outdoor Ambient DB Temperature, deg F Outdoor Ambient WB Temperature, deg F
-- End of Section --
M E
ZZ
A
N
IN
E "A
" R E
N O
V A
TI
O
N S
, B U
IL
D
IN
G
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R -E
A S
T M
C A
S C
H E
R R
Y P
O
IN
T, C
H E
R R
Y P
O
IN
T, N
C
M A
R
IN
E C
O R
P S
A
IR
S
TA
TI
O
N C
H E
R R
Y P
O
IN
T C
H E
R R
Y P
O
IN
T, N
C
1562017
M E
C H
A N
IC
A
L S
C H
E D
U
LE
S B
U
IL
D
IN
G
12830538
M-601
MGP MGP JDL
| 12830538.pdf |
| Sheets and Views |
| M601 |
File details come from the government source that posted it. Updated .