Amendment 0003.pdf

PDF 905 KB Posted

Attached to
B133 RENOVATIONS (FRCE)
Solicitation number
N400857103893
Issued by

View the file

Other files

File Type Posted
Amendment 0004.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
RFP 7103893 B133 RENOVATIONS AT FRCE.pdf PDF
7103893 SpecsAsOne.pdf PDF
7103893 DrawingsAsOne.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC

SPECIFICATION

7103893

B133 RENOVATIONS (FRCE)

MCAS Cherry Point, NC

AMENDMENT #0003

IMPORTANT

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.

If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 04/22/2021 7103893

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

CG MCAS Cherry Point

FACILITIES, ROICC

B-163, CURTIS ROAD

PSC BOX 8006

CHERRY POINT, NC 28533

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION

B133 RENOVATIONS (FRCE)

9B. DATED (SEE ITEM 11)

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

7103893 B133 RENOVATIONS (FRCE), Marine Corps Air Station Cherry Point, NC

This amendment is being issued to respond to pre-award RFIs and provide updated drawing.

The deadline to submit pre-award RFIs remains 26 April 2021 by 0900.

The proposal due date of 5 May 2021 at 1200 local times remains UNCHANGED.

See Attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

Amendment 0003 7103893 - B133 RENOVATIONS (FRCE)

RFI Responses:

5. In Appendix D of Spec Section 23.05.93, the equipment listed in the table is not the same equipment that is on the schedule on page M-601. Because of this, it is unclear what water gauge is to be used for the ductwork systems. Please, clarify.

Response:

Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments. See revised drawing sheet M-504 with revision #1 “DUCTWORK CLARIFICATIONS”, 21 April 2021. The "Duct

Construction Classification" table on sheet M-504 is to be used for determining the pressure classification for each duct system. Please note that for B133, the classification shown for "AHU-1" on sheet M-504 is to be used for the rooftop units (RTU-1, -2, -3).

CONTINUATION SHEET

SECTION 00 01 15 – LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

The following drawings are revised as of 21 APR 2021:

NAVFAC DWG NO. TITLE

12830535 MECHANICAL DETAILS

SUSPENDED PIPING

SUSPENDED DUCTWORK

13.1.4.4

13.1.4.4

NOT REQUIRED

NOT REQUIRED

COMPONENT IMPORTANCE FACTOR (Ip)

COMPONENT IDENTIFICATION

ROOF MOUNTED NOT REQUIRED 13.1.4.4

FLOOR MOUNTED

WALL MOUNTED

COMPONENT SUPPORTS

SUSPENDED EQUIPMENT

13.1.4.4

13.1.4.4

13.1.4.4

13.1.4.4

SEISMIC RESTRAINT

REQUIREMENT

ASCE 7-10

REFERENCE

1.0 1.5

NOT REQUIRED

NOT REQUIRED

NOT REQUIRED

NOT REQUIRED

SINGLE CONDUIT

CABLE TRAY/BUS DUCT

TRAPEZED CONDUIT

COMPONENT CERTIFICATION

13.1.4.2

13.1.4.4

13.1.4.4NOT REQUIRED

PENDANT, LAY-IN, & CAN LIGHTS

13.2.2

NOT REQUIRED

NOT REQUIRED

NOT REQUIRED

13.1.4.4

13.1.4.4

NOT REQUIRED

NOT REQUIRED

NOT REQUIRED 13.1.4.4

13.1.4.4

13.1.4.4

13.1.4.4

13.1.4.4

SEISMIC RESTRAINT

REQUIREMENT

ASCE 7-10

REFERENCE

NOT REQUIRED

NOT REQUIRED

NOT REQUIRED

NOT REQUIRED

13.1.4.2

13.1.4.4

13.1.4.4NOT REQUIRED

13.2.2

NOT REQUIRED

NOT REQUIRED

NOT REQUIRED

CHWS

CHWS

CHWS

CHWS

LPS

LPS

SUCTION

SUCTION

2 PSIG NAT. GAS

2 PSIG NAT. GAS

2 PSIG NAT. GAS

2 PSIG NAT. GAS

SUPPLY AIR

AHU-1

M E

ZZ

A

N

IN

E "A

" R E

N O

V A

TI

O

N S

, B U

IL

D

IN

G

FL

E

E T

R E

A D

IN

E

S S

C E

N

TE

R -E

A S

T M

C A

S C

H E

R R

Y P

O

IN

T, C

H E

R R

Y P

O

IN

T, N

C

M A

R

IN

E C

O R

P S

A

IR

S

TA

TI

O

N C

H E

R R

Y P

O

IN

T C

H E

R R

Y P

O

IN

T, N

C

1562017

M E

C H

A N

IC

A

L D

E

TA

IL

S

B U

IL

D

IN

G

12830535

M-504

MGP MGP JDL

12830535.pdf
Sheets and Views
M504

File details come from the government source that posted it. Updated .