Amend 0006.pdf

PDF 4 MB Posted

Attached to
Repair Auto Maintenance Facility Bldg 575 (230040)
Solicitation number
N4008527R9000
Issued by

About this file

This file is Amendment 0006 to a Department of the Navy NAVFAC solicitation for the Repair of Auto Maintenance Facility Building 575 at Camp Lejeune, North Carolina. The amendment extends the original solicitation (N40085-27-R-9000, issued October 22, 2026) and responds to 62 questions and answers submitted by potential bidders regarding project specifications and requirements. The amendment confirms that the proposal receipt date remains unchanged and must be acknowledged upon submission.

The Q&A responses clarify numerous technical specifications including: a 2-ply Garland roof membrane system as the base standard; one person may serve as Superintendent, Quality Control Manager, and Safety & Health Officer if qualified; a complete new BACnet DDC HVAC control system; complete demolition and replacement of the fire alarm system with Simplex, Notifier, or Fire-Lite equipment; Type 304 stainless steel vehicle exhaust ductwork with specific welding and sealing requirements; copper tubing for underground compressed air piping with brazed joints; hardwired electrical connections for automatic flush valves; and specific requirements for prefabricated insulated ductwork, condensate drain routing, and below-grade structural engineering of buried exhaust ductwork. The amendment also includes revised specification Section 23 07 00 for Insulation of Mechanical Systems and Section 23 35 00.00 10 for Overhead and Below-Grade Vehicle Tailpipe Exhaust Removal Systems, addressing materials, construction standards, delegated structural design requirements, testing procedures, and equipment specifications including AMCA-rated fans with 400-degree Fahrenheit continuous service capability. Only General MACC Contractors listed on the General Requirements cover page are eligible to submit proposals.

View the file

Other files

File Type Posted
Amend 0007.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
Pricing Sheet.pdf PDF
RFP 230040.pdf PDF
23-0040 APPD.pdf PDF
N4008523B0040 SpecsSigned.pdf PDF
N4008523B0040 DwgsSigned.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 128

AMENDMENT NO. 0006 11/18/26 23-0040

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-27-R-9000

10/22/26

23-0040, Repair Auto Maintenance Facility Bldg 575 Amendment 0006, Response to Requests for Information

The time and date for receipt of proposals remains unchanged.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

See continuation pages.

N40085-27-R-9000

Amendment 0006 Page 2 of 128

CONTINUATION SHEET

1. QUESTION: Key note 1 on A-105 and A-106 states to "Provide 3-Ply Modi ed Bitumen Roof System". The Membrane Roof System in Sec on 07 52 00 of the Speci ca ons is consistent with Garlands 2 Ply system as the possible "Basis of Design". Is the intent of spec sec on 07 52 00 to provide a 2-ply Membrane Roof System consistent with Garlands 2-Ply system?

ANSWER: The 2-Ply Garland system in the speci ca ons takes precedent as the base standard.

2. QUESTION: The Project Solicita on indicates one person may serve as Superintendent and SSHO. The QCM is a stand along posi on. Sec on 01 45 00 indicates the QC may serve as the Superintendent and SSHO, performing all 3 du es. Is one person or two person required for SSHO, Superintendent, and QC?

ANSWER: One person may ll the roles of Superintendent, Quality Control Manager and Safety & Health O cer, if duly quali ed for all three posi ons.

3. QUESTION: Iden fy the exis ng BAS/DDC manufacturer, so ware pla orm, licensing requirements, and incumbent controls contractor. Con rm all integra on requirements for new HVAC equipment and controls.

ANSWER: Per 23 09 23.13 Provide en re new BACnet DDC system(s) including associated equipment and accessories

4. QUESTION: Provide exis ng re alarm manufacturer/model and con rm available panel capacity for new devices. Con rm whether proprietary programming and tes ng services are required.

ANSWER: This project is a complete demoli on of the exis ng re alarm system. New re alarm system shall be Simplex, No er, or re-lite per Camp Lejeune Fire.

5. QUESTION: Con rm sprinkler hydraulic design criteria and verify whether the stated water ow test remains valid for nal sprinkler calcula ons.

ANSWER: OH1/OH2 and LH throughout; storage will be designed to protect Class IV storage. Updated hydrant ow test will be required as it is > 12 months past stated ow test.

6. QUESTION: Con rm available capacity within exis ng distribu on equipment, panelboards, and feeders receiving new loads. Provide available fault-current data.

ANSWER: This project is a complete demoli on of all exis ng electrical infrastructure with the excep on of the Exis ng Pad Mounted Transformer. See Plan E-601 for Available Fault Current data for this project.

7. QUESTION: Iden fy all systems subject to commissioning and provide required contractor par cipa on, seasonal tes ng requirements, TAB coordina on requirements, and witness tes ng requirements.

ANSWER: Refer to speci ca ons for MPE; For re, the re sprinkler and re alarm systems shall be subject to required acceptance tes ng and commissioning in accordance with the approved construc on documents, applicable NFPA standards, and AHJ requirements.

8. QUESTION: Con rm allowable shutdown windows for plumbing, HVAC, re protec on, and electrical systems serving occupied facili es.

ANSWER: Refer to project documents

9. QUESTION: Con rm whether exis ng re alarm system is to remain opera onal during construc on and de ne temporary protec on requirements.

ANSWER: The exis ng re alarm system is scheduled to be demolished in its en rety as part of the project scope. Accordingly, the exis ng system is not intended to remain opera onal throughout construc on. The contractor shall coordinate system impairment and demoli on ac vi es with the Owner and AHJ and provide temporary re protec on measures, including re watch where required, un l the new re alarm system is opera onal and accepted.

10. QUESTION: Please provide the required air compressor capacity (CFM and pressure) or the design basis used for sizing the compressor, including any future capacity requirements, so that all bidders can bid the same scope.

ANSWER: Compressor capaci es are listed in the compressor schedule.

11. QUESTION: Drawing/speci ca on Sec on 22 15 14 iden es aboveground compressed air piping as furnace bu -welded Schedule 40 black steel pipe. Please con rm whether a manufactured aluminum compressed air distribu on system u lizing compression ngs will be permi ed as an acceptable subs tute.

ANSWER: No.

12. QUESTION: The contract documents do not appear to provide requirements for the underground compressed air piping system. Please con rm whether exis ng PVC sleeves or chase pipes are available for reuse between the maintenance facility and the HazMat storage building. Also, please provide the basis for the 1-inch compressed air connec on to the HazMat building, including any air-operated POL pumps or other equipment intended to be served.

ANSWER: Underground compressed-air piping beneath the building slab shall be ASTM B88 Type K so -temper copper tubing with brazed wrought-copper ngs.

Pipe o sets shall be made using properly formed bends in con nuous tubing wherever prac cal. Where ngs are required, provide wrought-copper ngs with brazed joints.

Threaded, compression, press-connect, and other mechanical joints shall not be permi ed beneath the slab.

Provide corrosion-resistant protec ve covering suitable for underground installa on.

Provide sleeves where piping penetrates the concrete slab, with the annular space sealed using an approved exible sealant.

Pressure-test and inspect all underground piping prior to back lling or placement of the concrete slab.

Exis ng PVC sleeves or chase pipes have not been con rmed as available or suitable for reuse. Do not assume their availability

Provide the indicated 1-inch compressed-air connec on to the HazMat building.

13. QUESTION: Please con rm whether the Owner will consider gran ng an extension to the scheduled comple on date if procurement of long lead- me equipment a ects the project schedule.

ANSWER: Contractor is responsible to procure materials for this project so that any long-lead items are on site when needed in accordance with approved construc on schedule.

14. QUESTION: Con rm responsibility for re watch and temporary sprinkler impairments during construc on.

ANSWER: The Contractor shall be responsible for coordina ng and managing all temporary re protec on impairments during construc on, including sprinkler system shutdowns and any required re watch. All impairments shall be coordinated with the Owner and AHJ, as applicable. The Contractor shall provide temporary re protec on measures, including re watch where required, un l the a ected systems are restored to service.

15. QUESTION: Please con rm the governing layout, required capacity and moun ng method, including whether any re ex nguisher cabinets are required.

ANSWER: Portable re ex nguishers shall be provided in accordance with NFPA 10 and the applicable re code. Fire ex nguishers may be wall-mounted on approved brackets or installed within cabinets where indicated on the architectural drawings. Recessed or semi-recessed cabinets are not required unless speci cally iden ed in the contract documents or required by the AHJ.

16. QUESTION: A-501 indicates window blinds and refers to the nish legend, but A-601 does not iden fy a blind product. Please provide the required type, material, opera on, moun ng details and loca ons, including whether clerestory windows receive blinds

ANSWER: Window blinds are not required for the clerestory windows. Requirements for types of blinds are found in speci ca on sec on 12 21 00 Window Blinds.

17. QUESTION: Please con rm whether the ba ery-shop workbench requires the indicated 6 PSF lead covering, including edges, or another corrosion-resistant nish. Con rm whether the same assembly applies to Room 188

ANSWER: Con rmed. This is required for all workbenches in ba ery-shop workspaces.

18. QUESTION: Please provide a HAZMAT Report.

ANSWER: See a ached report(s).

19. QUESTION: In reference to Amendment 5, ques on 7: “Counter- door series: Sec on 08 33 12- 2.3 Requests integral counter doors. 655 Series integral frame cost 3.5 mes more than the 652 standard equivalent door.” With the answer “The DOR found the devia on for the service counter doors acceptable as long as this is acceptable to the government.” Can the government con rm that they are content with this devia on?

ANSWER: GOVT to answer.

20. QUESTION: Will the wall le be installed behind all of the lockers or will it be installed around all of the lockers. Also, will there be mud bed and slope in the en rety of the locker rooms? If not, what areas will be sloped mud bed and will the le installers be the ones responsible for building the mud bed and slope?

ANSWER: Con rmed, wall le is to con nue behind all of the lockers. Tile install shall be via a mud bed and sloped to oor drain. Installer to eld verify all slopes to ensue nal install meets ABA compliance and does not allow for ponding of water.

21. QUESTION: For CLIN 1: On detail 2 on sheet C-502, it states to “provide asphalt leveling course as required to provide smooth, posi vely draining, paving surface”. In spec sec on 32 12 16.16 under 1.3.10 Plan Grade it states “provide a nal wearing surface of pavement conforming to the eleva ons and cross sec ons shown and not vary more than 0.05 foot from the plan grade established and approved at site of work”. These both seem like very subjec ve requirements considering only a few contours are provided at one of the entrances. Will more grading details be provided?

ANSWER: SEE ASI 1. CLIN #1 deleted from project.

22. QUESTION: The asphalt details provided on C-500 for the “base bid” call for a prime coat on the stone prior to the I19.0C intermediate asphalt being place, however the asphalt details provided on sheet C-502 do not show any prime coat. Please con rm that this is the intent of these details

ANSWER: SEE ASI 1. CLIN #1 deleted from project.

23. QUESTION: Detail 14 on sheet C-500 shows a 12” min edge mill required, please con rm that this needs to be an edge mill and not just a saw cut

ANSWER: SEE ASI 1. CLIN #1 deleted from project.

24. QUESTION: Detail 6 on sheet C-502 shows crack sealer of asphalt cracks for CLIN#1. The other details for CLIN #1 indicate that all of the asphalt will be removed and replaced, where do you intend on crack sealing?

ANSWER: SEE ASI 1. CLIN #1 deleted from project.

25. QUESTION: The referenced speci ca on states that at exterior loca ons provide locksets of full stainless steel type 302 or 304 construc on including fronts, strike, escutcheons, knobs, bolts and all interior working parts. Marine Grade I, fully non-ferrous. The hardware sets specify Yale 8800 series mor se lock sets. However, the paragraphs below require locks to be type 302/304 stainless steel, marine grade 1 & fully non-ferrous.

These spec’d Yale locksets in the hardware schedule would not sa sfy the material requirements for these locks. Please con rm whether the scheduled Yale series 8800 locks will be accepted as an excep on to the paragraphs below or whether a fully compliant stainless steel mor se lockset is required. There is no known manufacturer that makes this lockset. Please con rm acceptance of Yale locks as put in the HW schedule, or provide basis-of-design (MANUFACTURER & MODEL) for full Marine grade 302/304 stainless steel lockset that complies with BAA.

ANSWER: The YALE series lock is acceptable.

26. QUESTION: The referenced speci ca on states to "provide an extension of exis ng key system. Exis ng locks manufactured by Best." Will Best compa ble keyways produced by another manufacturer be acceptable on this project?

ANSWER: GOVT to answer. This is acceptable to the DOR.

27. QUESTION: The referenced speci ca on states to "Use stainless steel inside bracketed or door mounted closers on exterior doors. On interior doors use closers of 302 or 304 stainless steel or non-ferrous materials." Please con rm that aluminum door closers may be u lized on this project as aluminum is a non-ferrous material

ANSWER: GOVT to answer. This is acceptable to the DOR.

28. QUESTION: Drawing H101: General notes and Hazardous Materials Notes state to treat all painted surfaces to have LPB or lead. LBP was only iden ed on one beige CMU wall.

Do we need to treat all other surfaces throughout the en re building as containing LBP or lead?

ANSWER: No. Lead-based paint was iden ed in only one loca on, a beige CMU wall in the elevated storage area. All other sampled loca ons were below the regulatory threshold for LBP. However, several painted surfaces contained detectable lead concentra ons below the LBP threshold and may generate lead-containing dust if disturbed. Contractors must implement appropriate lead-safe work prac ces and worker protec ons when disturbing painted surfaces in accordance with project speci ca ons and applicable regula ons.

29. QUESTION: Will this project be done in one phase or mul ple phases?

ANSWER: Building will be unoccupied and done in one phase.

30. QUESTION: Spec 02 41 00 page 5 sec on 3.1.2: Will chain link fencing need to be turned over to the government?

ANSWER: No. Government to con rm.

31. QUESTION: Spec 02 41 00 page 7 sec on 3.1.13: Will all locksets on swinging doors need to be turned over to the government?

ANSWER: Yes. Government to con rm.

32. QUESTION: Spec 02 41 00 page 8 sec ons 3.1.14.2, 3.1.14.4, 3.1.15, 3.1.15.1, and 3.1.15.2: Will all piping, xtures/motors/machines, electrical equipment, xtures, devices need to be turned over to the government?

ANSWER: No. Government to con rm.

33. QUESTION: Spec 02 41 00 page 9 sec ons 3.1.15.3, and 3.1.15.4: Will all wiring ducts and conduit need to be turned over to the government?

ANSWER: No. Government to con rm.

34. QUESTION: Drawing MH101, General Note 2, states that a complete below-ground vehicle exhaust system is to be provided and that the ductwork is to be stainless steel.

General Note 3 speci es that the above-ground vehicle exhaust ductwork is to be 304 stainless steel with rolled edges, clamp-together connec ons, welded seams, and high-temperature ePTFE gaskets. Addi onally, Speci ca on Sec on 23 35 00.00 10, Paragraph 2.4, speci es round stainless steel ductwork with laser-welded seams, rolled edges, and ePTFE gaskets between sec ons. However, the speci ca on does not speci cally iden fy the material requirements for the below-ground vehicle exhaust ductwork. Please clarify whether the below-ground vehicle exhaust ductwork is to be the same material as the above-ground vehicle exhaust (304 stainless steel with rolled edges, clamp-together connec ons, welded seams, and high-temperature ePTFE gaskets.). If not, please iden fy the required material (duct construc on, joint, and ngs) for the below-ground vehicle exhaust system.

ANSWER: See revised Speci ca on Sec on 23 35 00.00 10.

Provide round, single-wall Type 304 stainless steel vehicle exhaust ductwork and ngs complying with ASTM A240/A240M. Duct sizes shown on the drawings represent clear internal dimensions.

Aboveground ductwork: Provide factory-fabricated ductwork with con nuously welded longitudinal seams and rolled-edge, clamp-together transverse joints. Provide high-temperature ePTFE gaskets compa ble with the exhaust airstream and rated for not less than 400°F con nuous service. Provide matching stainless steel ngs and manufacturer-approved connec ons.

Below-slab ductwork: Provide con nuously welded longitudinal seams and transverse joints. Provide air ght and water ght construc on, including connec ons to oor receptacles and risers. Spiral lock seams, slip joints, and ordinary rolled-edge clamp-together joints are not permi ed below the slab.

Sealing and tes ng: Provide Seal Class A, sealing all longitudinal seams, transverse joints, and duct-wall penetra ons using the speci ed welded or gasketed construc on. Provide a minimum nega ve-pressure construc on ra ng of 8 inches water gauge, increased where required for maximum fan suc on. Test below-grade ductwork before concealment at the speci ed nega ve pressure for at least 15 minutes. Maximum air leakage shall not exceed 1 percent of the required full simultaneous-use connec on air ow. Separately verify water ghtness at the design groundwater head using an approved procedure. General HVAC leakage-class limits do not replace these requirements.

Delegated structural engineering: Provide a quali ed professional engineer licensed in North Carolina to determine below-grade duct wall thickness, reinforcement, bedding, supports, anchorage, and ota on restraint. Design for internal nega ve pressure, external earth and groundwater pressures, construc on loads, applicable vehicle wheel/axle/track loads, buckling, and bearing condi ons. Coordinate the buried assembly and support reac ons with the Structural Engineer of Record.

Maintain the fans, controls, duct rou ng, clear internal sizes, eleva ons, and capaci es indicated on the drawings. Provide at least 1,200 cfm at each vehicle connec on with all connec ons opera ng simultaneously; diversity is not permi ed.

Submit signed and sealed structural calcula ons and installa on details iden fying design criteria, materials, wall thicknesses, joints, reinforcement, bedding, supports, and anchorage. Submit leakage- and water-ingress-tes ng procedures for approval and obtain required inspec ons and test acceptance before concealment.

35. QUESTION: Drawing MH101, General Note 4, states that all exposed supply, return, outside air, and exhaust ductwork must be prefabricated, pre-insulated double-wall ductwork. Speci ca on Sec on 23 07 00, Paragraph 2.2.4.3, directs the contractor to Speci ca on Sec on 23 73 33, Hea ng, Ven la ng, and Cooling System, for the requirements for prefabricated insulated ductwork. However, Speci ca on Sec on 23 73 33 does not appear to iden fy the speci c requirements for prefabricated, pre-insulated double-wall ductwork. Please provide the applicable material, insula on, and construc on requirements for the prefabricated, pre-insulated double-wall ductwork speci ed in Drawing MH101, General Note 4.

ANSWER: PREFABRICATED INSULATED DUCTWORK. Outdoor Installa ons: Provide double layered (total 50 mm thick min), double walled phenolic foam pre-insulated rectangular ductwork for all outdoor installa ons. Duct panels shall be manufactured of CFC/HCFC free phenolic foam (or other approved) bonded on both sides to a factory applied foil facing with a minimum thickness of 60 micron internal and 200 micron external. Phenolic panels are to be pre-fabricated and assembled into male/female interlocking sec ons. Thermal resistance R-10 minimum to include equivalent R-Value at all joints with no metal pass through. Outdoor cladding shall meet UL 1709. Ductwork shall be fabricated per "SMACNA HVAC Phenolic Duct Construc on Standards." Duct shall be fabricated not to pond water.

36. QUESTION: Plumbing schedule on drawing P-001 lists xture item (UR1) Hands Free Urinal, Wall Hung, 0.5GPF as having a ba ery-operated ush valve. Speci ca on sec on 22 00 00 paragraph 2.4.1 Automa c Controls states that all automa c, sensor operated faucets and ush valves are to have hardwired electrical connec ons. Which type of ush valve are we to provide for the (UR1) Urinals, Hardwired or Ba ery Operated?

ANSWER: Electrical has allowed for 120v connec ons for ush valves. Ba ery powered ush valve listed in error. Should be hardwired.

37. QUESTION: There does not seem to be a detail or drawing note to describe where to drain the condensate from the Roo op Air Handler units. Does the condensate spill on to the roof top and naturally drain towards the nearest roof drain, or do we need to pipe the condensate drain to the nearest roof drain?

ANSWER: Route condensate to nearest roof drain.

38. QUESTION: Condensate drain piping seems to be speci ed as copper pipe & ngs per speci ca on sec on 23 73 33 paragraph 2.4.3 Copper Cold Drain Piping. For the roo op HVAC units in past projects, it has been typical to install the condensate drainpipe as sch.

40 PVC pipe and ngs. Will sch. 40 PVC pipe and ngs be acceptable for use when installing condensate drains for the roo op HVAC equipment in this project?

ANSWER: No. Provide copper.

39. QUESTION: Plumbing drawing PW401 Detail 6 Enlarged Waste-Vent Pan shows (ET-03) expansion tank. I would like to con rm that this expansion tank should be labeled as ET- 01 as that is the only expansion tank listed in the plumbing schedule. There is only one expansion tank for the domes c water system, correct?

ANSWER: Expansion tank on plan is tagged incorrectly. It should be ET-01. There is only one expansion tank for the domes c hot water system.

40. QUESTION: Drawing M-503, Detail 1, appears to show two di erent methods for suppor ng the underground vehicle exhaust ductwork. Please clarify the intended support method and associated requirements. The upper detail shows a 5-inch-thick concrete base slab with embedded anchor es. Is the slab intended to extend con nuously along the en re ductwork route or only at speci c loca ons? Please clarify the required dimensions and anchorage requirements. The lower detail shows precast concrete piers at 4 feet on center. Based on the detail, it appears the ductwork may also be encased in concrete. If concrete encasement is required, are the precast piers s ll necessary? If the piers are required, please provide the basis of design, including the manufacturer, product designa on, and speci ca ons. Please con rm which support method is required for the underground vehicle exhaust ductwork: the concrete base slab, individual precast concrete piers, or another con gura on. Please also clarify the concrete encasement requirements, if applicable.

ANSWER: See revised Speci ca on Sec on 23 35 00.00 10. Provide round, single-wall Type 304 stainless steel vehicle exhaust ductwork and ngs complying with ASTM A240/A240M. Duct sizes shown on the drawings represent clear internal dimensions.

Aboveground ductwork: Provide factory-fabricated ductwork with con nuously welded longitudinal seams and rolled-edge, clamp-together transverse joints. Provide high-temperature ePTFE gaskets compa ble with the exhaust airstream and rated for not less than 400°F con nuous service. Provide matching stainless steel ngs and manufacturer-approved connec ons.

Below-slab ductwork: Provide con nuously welded longitudinal seams and transverse joints. Provide air ght and water ght construc on, including connec ons to oor receptacles and risers. Spiral lock seams, slip joints, and ordinary rolled-edge clamp-together joints are not permi ed below the slab.

Sealing and tes ng: Provide Seal Class A, sealing all longitudinal seams, transverse joints, and duct-wall penetra ons using the speci ed welded or gasketed construc on. Provide a minimum nega ve-pressure construc on ra ng of 8 inches water gauge, increased where required for maximum fan suc on. Test below-grade ductwork before concealment at the speci ed nega ve pressure for at least 15 minutes. Maximum air leakage shall not exceed 1 percent of the required full simultaneous-use connec on air ow. Separately verify water ghtness at the design groundwater head using an approved procedure. General HVAC leakage-class limits do not replace these requirements.

Delegated structural engineering: Provide a quali ed professional engineer licensed in North Carolina to determine below-grade duct wall thickness, reinforcement, bedding, supports, anchorage, and ota on restraint. Design for internal nega ve pressure, external earth and groundwater pressures, construc on loads, applicable vehicle wheel/axle/track loads, buckling, and bearing condi ons. Coordinate the buried assembly and support reac ons with the Structural Engineer of Record.

Maintain the fans, controls, duct rou ng, clear internal sizes, eleva ons, and capaci es indicated on the drawings. Provide at least 1,200 cfm at each vehicle connec on with all connec ons opera ng simultaneously; diversity is not permi ed.

Submit signed and sealed structural calcula ons and installa on details iden fying design criteria, materials, wall thicknesses, joints, reinforcement, bedding, supports, and anchorage. Submit leakage- and water-ingress-tes ng procedures for approval and obtain required inspec ons and test acceptance before concealment.

41. QUESTION: The vehicle exhaust fans are speci ed to include both AMCA Spark B construc on and high-temperature construc on rated for 400°F. AMCA Spark B construc on requires an aluminum fan wheel; however, aluminum fan construc on is generally limited to applica ons below 300°F. As a result, the speci ed Spark B and 400°F high-temperature construc on requirements cannot be provided simultaneously.

Please clarify which requirement should take precedence: AMCA Spark B construc on or 400°F high-temperature construc on.

ANSWER: There are fan manufacturers that can provide aluminum spark B and 400°F.

42. QUESTION: Plumbing drawings PD101, & PD102 indicate that all interior plumbing components, xtures, and piping are to be removed. Looking at drawing A-402 Keynote 17, it references two drinking fountains shown on the page. There appears to be no wall demo shown in these two loca ons, however the drinking fountains are to be demolished and provided as new. The domes c water, & DWV for the water fountains are located within the concrete block wall. Are the concrete block walls to be sawcut and have the blocks removed so that the exis ng piping can be removed and replaced as new? There are other areas in the building that show the same issue with wall mounted plumbing xtures and the piping in the wall cavity.

ANSWER: All exis ng piping, xtures, etc, are to be removed, unless speci cally noted otherwise. Saw cu ng of block will be required to remove and replace exis ng concealed piping.

43. QUESTION: There is a discrepancy between Plumbing drawing PD101 and Architectural drawing AD101. Drawing PD101 shows a small bathroom between column lines 1 and 2 adjacent to room 103. Drawing AD101 does not show this restroom. (Reference column lines 1 & 2, and E & F) The building layouts are di erent from one another. Which drawing is correct?

ANSWER: Original drawings were used to depict the demoli on scope for the plumbing drawings. The bathroom shown on the plumbing drawing may no longer exist. However, any piping that may remain must be removed.

44. QUESTION: Spec sec on 22 00 00 Table I Pipe & Fi ng material for DWV systems lists both Cast Iron and PVC as acceptable products for use with the underground DWV systems. Is there a preferred material between the two for use with the underground DWV systems?

ANSWER: Both types of material are approved. There is not preference.

45. QUESTION: Spec sec on 22 00 00 Table I Pipe & Fi ng material for DWV systems lists both Cast Iron and PVC as acceptable products for use with the aboveground DWV systems. Is there a preferred material between the two for use with the aboveground DWV systems?

ANSWER: Both types of material are approved. However, any exposed piping that may be in danger of being damaged, ie, exposed ver cal stack up a wall, must be cast iron to prevent damage.

46. QUESTION: During the site visit, it was observed that PVC pipe and ngs were installed for the exis ng aboveground roof drain piping. Typically, in previous projects at Camp Lejeune aboveground roof drain piping was speci ed as being cast iron piping.(perhaps due to sound restric ons) Spec sec on 22 00 00 Table I Pipe & Fi ng material for DWV systems lists both Cast Iron and PVC as acceptable products for use with the aboveground rainwater conductors. Will PVC be acceptable for the new aboveground roof drain piping throughout building 575?

ANSWER: Both types of material are approved. However, any exposed piping that may be in danger of being damaged, ie, exposed ver cal stack up a wall, must be cast iron to prevent damage.

47. QUESTION: Looking through the plumbing drawings and speci ca ons there does not seem to be anything shown or listed to state what piping material is to be installed for the underground compressed air piping. What piping material are we to install for the underground compressed air, and what type of joint is required for pipe o sets?

ANSWER: Underground compressed-air piping beneath the building slab shall be ASTM B88 Type K so -temper copper tubing with brazed wrought-copper ngs.

Pipe o sets shall be made using properly formed bends in con nuous tubing wherever prac cal. Where ngs are required, provide wrought-copper ngs with brazed joints.

Threaded, compression, press-connect, and other mechanical joints shall not be permi ed beneath the slab.

Provide corrosion-resistant protec ve covering suitable for underground installa on.

Provide sleeves where piping penetrates the concrete slab, with the annular space sealed using an approved exible sealant.

Pressure-test and inspect all underground piping prior to back lling or placement of the concrete slab.

48. QUESTION: Looking at Speci ca on sec on 23 07 00 Insula on of Mechanical Systems, there is no descrip on of what type of insula on to provide for the Roof Drain piping.

We will need to know what type of insula on to provide, and what thickness it needs to

be. Table I does not list the requirements for Roof Drain piping. Can we get this added to the insula on speci ca ons so that we may know what to provide?

ANSWER: See revised speci ca on, material has been added.

49. QUESTION: During the site visit, it was observed in the open bay areas that the exis ng roof drain piping had insula on on the horizontal runs as well as the ver cal risers that extended to the roof drain body. Speci ca on sec on 23 07 00 Part 3 Execu on, paragraph 3.1 Prepara on, line-item B lists Ver cal por on of interior roof drain pipelines as does not insulate. I would like to con rm that the newly installed ver cal risers will not require insula on per this narra ve. Correct?

ANSWER: Correct.

50. QUESTION: Will the underside of the roof drain body require insula on?

ANSWER: Yes

51. QUESTION: Plumbing drawing PG102 shows a 1” compressed air pipe dropping below grade (Reference keynote 5) and rou ng outside of building 575 to the hazmat building shown on drawing PG103. (reference keynotes 1 and 2) The concrete above this underground piping is not shown to be saw cut or demolished in drawing AD102 or replaced on drawing A102. (Reference room 203 Machine Shop) This work should be added to the drawings so that it is not missed and the concrete saw cu ng, demoli on, and replacement of concrete can be accounted for.

ANSWER: Sawcut and patch concrete paving. Refer also to ASI 1 for update regarding asphalt/concrete paving.

52. QUESTION: Plumbing drawing PG102 shows a 1” compressed air pipe dropping below grade (Reference keynote 5) and rou ng outside of building 575 to the hazmat building shown on drawing PG103. (reference keynotes 1 and 2) Drawing CD100 does not show or note any saw cu ng or demoli on of asphalt/concrete above this pipe loca on.

Drawing CS100 does not show any replacement or notes to replace the concrete/asphalt in this loca on. Should this be added to the drawings so that the site contractor can account for this work?

ANSWER: Sawcut and patch concrete paving. Refer also to ASI 1 for update regarding asphalt/concrete paving.

53. QUESTION: Plumbing drawing P-501 shows Detail 7 Compressed Air Tool Sta on Detail.

Looking at drawings PG101, PG102, and PG103 there does not appear to be any compressed air drops shown that refer to this detail. It appears that the compressed air system connects to hose reels either mounted high to the structure or pedestal mounted, the POL system pumps, and it routes underground outside to the hazmat structure to connect to three exis ng pumps. Drawing PG102 shows keynote 7 which states ½” compressed air piping down wall and terminate with ¼ turn ball valve and quick disconnect coupler. (this does not sound like detail 7/P-501) Where is Detail 7/P- 501 Compressed Air Tool Sta on used?

ANSWER: Detail 7/P-501 applies to the compressed-air tool sta on iden ed by Keynote 7 on Drawing PG102. Keynote 7 shall be revised to reference Detail 7/P-501 for the complete tool sta on assembly.

The detail does not apply to compressed-air connec ons serving hose reels, POL system pumps, or exis ng equipment at the hazmat structure unless speci cally noted on the drawings.

54. QUESTION: Looking through the Plumbing details, there does not seem to be a detail for HR1 compressed air hose reel, or the HR2 water hose reel. The only hose reel details shown refer to the POLS reels shown on drawing P-505. May we get details of these two hose reels to show the valves, lters, lubricators, regulators, etc... that may be required in the hose reel sta ons.

ANSWER: Air and water hose reels will be similar to the details on drawing P-505, only requiring a shuto valve before the connec on to the hose reel.

55. QUESTION: The speci ca ons require a "2-inch-thick mist eliminator in outside airstream." Please clarify the intended applica on and basis of design. Will a standard outside air hood and louver assembly be considered acceptable in lieu of a separate mist eliminator for protec on of the ERV core? If not, please provide acceptable manufacturers and performance requirements.

ANSWER: The 2-inch-thick mist eliminator is required in the outdoor-air inlet hood of RTU-7, upstream of the energy-recovery heat exchanger. Provide a removable, washable, corrosion-resistant metal-mesh mist-eliminator assembly in an accessible rack, with drainage that prevents collected water from reaching the heat exchanger or lters.

56. QUESTION: Can a complete ductwork speci ca on, including a duct construc on schedule iden fying the required pressure classes (WG) for each duct system be provided?

ANSWER: See included table.

57. QUESTION: Glass cloth nish on exible unicellular (elastomeric) insula on: Paragraphs

2.1.2.3 and 2.1.2.4 list a MIL-A-3316 nishing adhesive and MIL-C-20079 glass cloth "for nishing exible unicellular insula on," but Part 3 contains no execu on paragraph requiring this nish. Please con rm whether the adhesive and glass cloth nish is required on exible unicellular insula on. If it is, please con rm where it applies (all loca ons, exposed loca ons only, or outdoor only).

ANSWER: Only where required per spec.

58. QUESTION: Condensate drain insula on material: Table I lists "Chilled Water & Condensate" with polyisocyanurate only. The drawings show an air-cooled chiller (CH-

01) and A/C condensate drains from DAH-01 and DAH-02, so we understand this row to cover A/C condensate drain piping. Please con rm whether exible unicellular (elastomeric) insula on, ASTM C534, is acceptable as an alternate to polyisocyanurate on condensate drain piping at the same thickness.

ANSWER: No, use polyisocyanurate.

59. QUESTION: Exposed and outdoor ductwork: General note 4 on MH101 and MH102 requires all exposed supply, return, outside air and exhaust ductwork to be pre-fabricated, pre-insulated double-wall duct. Paragraph 2.2.2 of Sec on 23 07 00 calls for 1.5" thick, 6 pcf rigid mineral ber board on duct not in concealed spaces. Paragraphs

2.2.3 and 2.2.4.3 refer all ductwork located outside or exposed to weather to Sec on 23 73 33 for pre-fabricated insulated ductwork. Please con rm:

(a) No eld-applied insula on is required on exposed pre-insulated double-wall ductwork inside the building.

(b) No eld-applied insula on is required on ductwork located outside or exposed to weather.

(c) Field-applied duct insula on under Sec on 23 07 00 applies only to concealed ductwork.

ANSWER: All exterior duct to be PREFABRICATED INSULATED DUCTWORK. Sec on has been added to spec. Field applied insula on is not required on pre-insulated ductwork.

It is required on non pre-insulated ductwork both concealed and non concealed.

60. QUESTION: Please provide desired specs or parameter for Concrete sealer. Is the intent any type of penetra ng sealer? Please specify.

ANSWER: Basis of design product is H&C Clarishield – Clear nish or approved equal.

61. QUESTION: Will the EPX1 Resinous Floor be done in phases? Please detail how many phases or what sec ons would be available to complete at a me.

ANSWER: Contractor is responsible for scheduling. Building will be turned over to Contractor and completed per contract dura on.

62. All other terms and condi ons remain unchanged.

SECTION 23 07 00

INSULATION OF MECHANICAL SYSTEMS

03/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A167 (2011) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip

ASTM A240/A240M (2020a) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications

ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate

ASTM C177 (2019) Standard Test Method for Steady-State Heat Flux Measurements and Thermal Transmission Properties by Means of the Guarded-Hot-Plate Apparatus

ASTM C195 (2007; R 2013) Standard Specification for Mineral Fiber Thermal Insulating Cement

ASTM C533 (2017) Standard Specification for Calcium Silicate Block and Pipe Thermal Insulation

ASTM C534/C534M (2016) Standard Specification for Preformed Flexible Elastomeric Cellular Thermal Insulation in Sheet and Tubular Form

ASTM C547 (2017) Standard Specification for Mineral Fiber Pipe Insulation

ASTM C552 (2021) Standard Specification for Cellular Glass Thermal Insulation

230040 REPAIR AUTO MAINTENANCE FACILITY BLDG 575

ASTM C553 (2013; R 2019) Standard Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications

ASTM C578 (2019) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

ASTM C591 (2021) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

ASTM C592 (2016) Standard Specification for Mineral Fiber Blanket Insulation and Blanket-Type Pipe Insulation (Metal-Mesh Covered) (Industrial Type)

ASTM C612 (2014) Mineral Fiber Block and Board Thermal Insulation

ASTM C916 (2014) Standard Specification for Adhesives for Duct Thermal Insulation

ASTM C1136 (2017a) Standard Specification for Flexible, Low Permeance Vapor Retarders for Thermal Insulation

ASTM D828 (1993) Tensile Breaking Strength of Paper and Paperboard

ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E96/E96M (2022a) Standard Test Methods for Gravimetric Determination ofWater Vapor Transmission Rate of Materials

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS L-P-535 (Rev. E; Notice 2) Plastic Sheet (Sheeting): Plastic Strip: Poly (Vinyl Chloride) and Poly(Vinyl Chloride-Vinyl Acetate), Rigid

U.S. DEPARTMENT OF DEFENSE (DOD)

MIL-A-3316 (1987; Rev C; Am 2 1990) Adhesives, Fire-Resistant, Thermal Insulation

MIL-PRF-19565 (1988; Rev C) Coating Compounds, Thermal Insulation, Fire- and Water-Resistant, Vapor-Barrier

MIL-C-20079 (Rev. H) Cloth, Glass: Tape, Textile Glass; and Thread, Glass and Wire-Reinforced Glass

MIL-A-24179 (1969; Rev A; Am 2 1980; Notice 1 1987) Adhesive, Flexible Unicellular-Plastic Thermal Insulation

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 255 (2006; Errata 2006) Standard Method of Test of Surface Burning Characteristics of Building Materials

UNDERWRITERS LABORATORIES (UL)

UL 723 (2018) UL Standard for Safety Test for Surface Burning Characteristics of Building Materials

1.2 SYSTEM DESCRIPTION

Provide new and modify existing field-applied insulation for heating, ventilating, and cooling (HVAC) air distribution systems and piping systems which are located within, on, under, and adjacent to buildings;

and for plumbing piping systems.

1.2.1 Air Distribution System

Obtain Contracting Officer's written approval of systems under Section 23 05 93, "TESTING, ADJUSTING, AND BALANCING FOR HVAC" before applying field-applied insulation to air distribution systems.

1.2.2 Piping Systems

Obtain Contracting Officer's written approval of HVAC water distribution systems under Section 23 05 93, "TESTING, ADJUSTING, AND BALANCING FOR HVAC " before applying field-applied insulation to HVAC water distribution systems. At the Contractor's option and with Contracting Officer's written approval, the piping systems may be insulated before systems are tested, adjusted, and balanced (TAB'd). Piping insulation shall terminate immediately adjacent to each flow control valve, automatic control valve, or device. For chilled water and chilled-hot water piping, the ends of pipe insulation and the space between ends of pipe insulation and piping shall be sealed with waterproof vapor barrier coating. After systems are TAB'd, the control valves and devices shall be insulated.

1.3 DEFINITIONS

1.3.1 Finished Spaces

Spaces used for habitation or occupancy where rough surfaces are plastered, panelled, or otherwise treated to provide a pleasing appearance.

1.3.2 Unfinished Spaces

Spaces used for storage or work areas where appearance is not a factor, such as unexcavated spaces and crawl space.

1.3.3 Concealed Spaces

Spaces out of sight. For example, above ceilings; below floors; between double walls; furred-in areas; pipe and duct shafts; and similar spaces.

1.3.4 Exposed

Open to view. For example, pipe running through a room and not covered by other construction.

1.3.5 Fugitive Treatments

Treatment subject to deterioration due to aging, moisture, high humidity, oxygen, ozone, and heat. Fugitive materials are entrapped materials that can cause deterioration, such as solvents and water vapor.

1.3.6 Outside

Open to view up to 5 feet beyond the exterior side of walls, above the roof, and unexcavated or crawl spaces.

1.3.7 Conditioned Space

An area, room or space normally occupied and being heated or cooled for human habitation by any equipment.

1.4 SUBMITTALS

Submit the following in accordance with Section 01 33 00, "Submittal Procedures."

SD-03 Product Data

Piping insulation

Piping insulation finishes

Heating, ventilating, and air conditioning systems insulation

Duct insulation finishes

Accessory materials

Adhesives, sealants, and coating compounds

1.5 QUALITY ASSURANCE

Every package or standard container of insulation, jackets, cements, adhesives, and coatings delivered to the project site shall have the manufacturer's stamp or label attached giving name of manufacturer, brand and description of material. Insulation packages and containers shall be asbestos-free.

1.6 FLAME-SPREAD AND SMOKE-DEVELOPED RATINGS

In accordance with NFPA 255, ASTM E84 or UL 723, the materials on interior of the building shall have a flame-spread rating of not more than 25 and a smoke-developed rating of not more than 150 interior to the bulding.

1.6.1 Materials Tests

Test factory-applied materials as assembled. Field-applied materials may be tested individually. Use no fugitive or corrosive treatments to impart flame resistance. UL label or satisfactory certified test report from a testing laboratory will be required to indicate that fire hazard ratings for materials proposed for use do not exceed those specified.

Flame-proofing treatments subject to deterioration due to effects of moisture or high humidity are not acceptable.

1.6.2 Materials Exempt From Fire-Resistant Rating

Nylon anchors.

PART 2 PRODUCTS

2.1 PIPING INSULATION

Piping systems, except buried pipe requiring insulation, types of insulation required, and insulation thickness shall be as listed in Tables I herein. Unless otherwise specified, insulate all fittings, flanges, and valves, except valve stems, hand wheels, and operators. Provide factory premolded, precut, or field-fabricated insulation of the same thickness and conductivity as insulation on adjacent piping. Insulation exterior shall be factory cleanable, grease resistant, non-flaking and non-peeling. Pipe insulation shall conform to the referenced publications.

All piping must be labeled per ASME A13.1. Labels must show use and direction of flow.

2.1.1 Pipe Insulation Beyond Building Walls

For 5 feet beyond the exterior side of building walls, conform to Section 23 07 00, "Thermal Insulation for Mechanical Systems," in tunnels, in manholes, under and above piers, in trenches on piers, and for aboveground piping.

2.1.2 Flexible Unicellular Insulation

2.1.2.1 Recommended Adhesive

ASTM C534/C534M. Provide adhesive as recommended by insulation manufacturer or conforming with MIL-A-24179, Type II, Class 1.

2.1.2.2 Polyolefin thermoplastic

Polyolefin thermoplastic meets ASTM C534/C534M, except density.

2.1.2.3 Adhesive For Finishing Flexible Unicellular Insulation

MIL-A-3316, Class 1, Grade A.

2.1.2.4 Glass Cloth For Finishing Flexible Unicellular Insulation

MIL-C-20079, Type I, Class 1, 3, or 5.

2.1.3 Polyisocyanurate Insulation

ASTM C591, Type I. Supply the insulation with a factory applied vapor retarder/barrier that complies with Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS. The insulation and all covering must pass the flame spread index of 25 and the smoke developed index of 50 when tested in accordance with ASTM E84.

2.1.4 Cellular Glass Insulation

ASTM C552, Type II.

2.1.5 Mineral Fiber

ASTM C547, Class I.

2.1.6 Piping Insulation Finishes

2.1.6.1 All-Purpose Jacket

Provide a factory applied all-purpose jacket when field applied jacketing is not specified. All purpose jackets shall include integral vapor barrier as required by service. Provide jackets in exposed locations with a white surface suitable for field painting. Allow a maximum water vapor permeance of 0.05 perm in accordance with ASTM E96/E96M, a puncture resistance of not less than 50 Beach units, and a minimum tensile strength of 35 pounds-force per inch of width in accordance with ASTM D828.

2.1.6.2 Vapor-Barrier Material

ASTM C1136. Resistant to flame, moisture penetration, and mold growth.

Provide vapor-barrier material on pipe insulation as required in Table I.

2.1.6.3 Metal Jackets

Provide metal jackets on all piping exposed to weather.

a. Aluminum Jackets: ASTM B209, Temper H14, minimum thickness of 27 gage (0.016 inch), with factory-applied polyethylene and kraft paper moisture barrier on inside surface. Provide smooth surface jackets for jacket outside diameters less than 8 inches. Provide corrugated surface jackets for jacket outside diameters 8 inches and larger. Provide stainless steel bands, minimum width of 0.5 inch. Provide factory prefabricated aluminum covers for insulation on fittings, valves and flanges.

b. Stainless Steel Jackets: ASTM A167 or ASTM A240/A240M; Type 304, minimum thickness of 33 gage (0.010 inch), smooth surface with factory-applied polyethylene and kraft paper moisture barrier on inside surface. Provide stainless steel bands, minimum width of

0.5 inch. Provide factory prefabricated stainless…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .