P200 Project Matrix.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- N4008527R0039
About this file
This file is a project matrix template used to document relevant project experience for federal contract proposals. The matrix requires offerors to list up to five completed projects that demonstrate their qualifications, with each entry capturing project title, location, completion year, prime or subcontractor role, delivery method (Design-Bid-Build or Design-Build), project type (renovation or new construction), and federal agency affiliation. The template is specifically tailored for the P-200 Aircraft Maintenance Hangar project at Marine Corps Air Station (MCAS) Cherry Point, North Carolina, and establishes minimum qualification criteria that prospective contractors must meet.
The matrix defines specific size, scope, and complexity requirements for relevant projects. Qualifying projects must involve new construction or building addition/expansion of an aircraft maintenance hangar with a final construction cost of $35 million or greater, excluding pre-engineered building systems and renovation projects. Critically, at least one submitted project must demonstrate a column-free open hangar bay with a clear span of not less than 200 feet. The matrix includes columns for recording the number of projects, PLA (Project Labor Agreement) feedback, and related elements, providing a structured format for offerors to substantiate their experience and capability to execute this Naval Facilities Engineering Systems Command project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Information Form.docx | DOCX document | |
| P200 Sources Sought Notice.pdf | ||
| Contractor Information Form.docx | DOCX document | |
| P200 PLA Request for Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Information
| SIZE | SCOPE | COMPLEXITY ELEMENTS | |||||||||
| # | Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | ||||||||
| (year) | Was your firm Prime or Sub/DOR? | DB or DBB | Renovation/New Construction | DoD / Fed | Final Construction Cost of $35M or greater | New construction or building addition/expansion of an aircraft maintenance hangar. Neither pre-engineered building systems nor renovation projects will be considered relevant. | For at least one relevant project (meeting the Size and Scope as defined above), the Offeror must demonstrate a column-free open hangar bay clear span not less than 200-ft. | Provided PLA Feedback | |||
| 1 | |||||||||||
| 2 | |||||||||||
| 3 | |||||||||||
| 4 | |||||||||||
| 5 |
File details come from the government source that posted it. Updated .