27R0017 Amendment 0002.pdf

PDF 218 KB Posted

Attached to
RM16-1405 BUILDING 592 RENOVATIONS
Solicitation number
N4008527R0017
Issued by

About this file

This is Amendment 0002 to Solicitation N4008527R0017, a Design-Build contract for Building 592 Renovations at Philadelphia Navy Yard Annex in Philadelphia, Pennsylvania, issued by NAVFAC Mid-Atlantic Contracting Core on November 12, 2026.

The amendment extends the proposal due date from December 1, 2026 at 2:00 PM EST to December 8, 2026 at 2:00 PM EST. The amendment also provides responses to Pre-Proposal Inquiries (PPIs) submitted by potential offerors. Of the 20 PPIs received, 14 have been answered by the government, including clarifications on personnel requirements (only US persons allowed in Building 592), hazmat responsibility (contractor responsible only for areas affected by the scope of work), commissioning requirements (not required per spec section 01 91 00), swing space and FF&E relocation (not required), NETA testing (required), air barrier testing (not required), wall tile height in restrooms (floor to ceiling), structural steel painting (field painted per structural plans), and various technical specifications regarding building heights, hazmat testing procedures, and material standards. Six PPIs remain pending government response, addressing option pricing validity periods, CMMC Level 1 requirements, concrete sealer specifications, structural steel finishing details, and design responsibilities under the design-build contract. The contract point of contact is Amber Stovall at amber.k.stovall.civ@us.navy.mil or 757-341-0146. All terms and conditions of the original solicitation remain in full force and effect except as modified by this amendment.

View the file

Other files

File Type Posted
27R0017 Amendment 0003.pdf PDF
N4008527R0017 Amendment 0001.pdf PDF
Attachment B - 1808017_SPC_01of01.pdf PDF
Attachment A - 1808017_DWG_01of01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0002 12-Nov-2026

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFAC MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N4008527R0017

9B. DATED (SEE ITEM 11)

28-Oct-2026

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N4008527R0017, DESIGN-BUILD, RM16-1405 BUILDING 592 RENOVATIONS, PHILADELPHIA NAVY YARD ANNEX, PHILADELPHIA, PA

The Amendment is issued to extend the proposal due date from 01 December 2026 2pm EST to 08 December 2026 2pm

EST.

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Amber Stovall; amber.k.stovall.civ@us.navy.mil; Phone: 757-341-0146

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

N4008527R0017

SF 30 BLOCK 14 CONTINUATION PAGE

The purpose of this amendment is to provide the following:

1. Provide Responses to PPIs

2. Extend to proposal date from 01 December 2026 2PM EST to 08 December 2026 2PM EST

PRE-PROPOSAL INQUIRY RESPONSES:

Question

Reference

Question Government Response Page Section

Paragrap h

Price

Schedule

Please advise about awarding the options. It's unrealistic to hold price for 365 days for all Options while PoP is 460 days, base bid price is valid for

120 days and timing for Options awards is unknown.

PENDING RESPONSE

01 14 00 Please confirm that only US Citizens allow to work inside B592.

Yes, only US persons are allowed to work inside B592.

RFP CMMC Please elaborate on CMMC Level 1 requirements. RFP, p. 4 mentioned the seed project which is no relevant to this task order. Do ALL subs need to be certififed with, at least, Level 1 of

CMMC?

PENDING RESPONSE

RFP Is NAVFAC planning to organize a site visit? It will be very beneficial for all parties.

Site visit details have been made available via Amendment 0001.

01 91 00 Who is responsible for

Commissioning? The spec does not include this section and if the

Contractor performs Cx, please provide specification.

Total Building Commissioning per spec section 01 91 00 is not required. Refer to individual sections for acceptance testing requirements

02 82 00 Hazmat Survey identified materials in different locations of the building.

Does the Contractor responsible for the complete removal of hazmat material or only in areas affected by this work? For example, exterior siding and numerous structural steel members are not part of this task order.

Contractor is not responsible for the complete removal of all hazmat materials in the building. In the sited example Contractor is not responsible for undisturbed exterior siding and undisturbed structural steel members.

Contractor is responsible for the areas affected by the scope of work.

01 50 00 Price Schedule calls for a swing space, required furniture, and equipment relocation. Please clarify requirements and provide details and/or drawings) for the swing space and removable

This work is not required.

FF&E. Also, who is responsible for moving in & out FF&E and equipment? Neither drawings nor specifications indicate this work.

Can there be a two-week extension as this is a significant project to quote?

(the week of Thanksgiving cuts the month short a bit)

Amendment 0002 is issued to extend the proposal due date from

01 December 2026 2pm EST to 08

December 2026 2pm EST.

H-101 02 82 00 General Notes 4.1 through 4.9 on drawings H-101 & H-102 call for painted surfaces containing RCRA and metals but no legends found on the drawings. Please clarify.

As indicated in General Sheet Note

4 Contractor shall assume that

ALL painted surfaces contain

RCRA 8 metals. This applies throughout all project work areas.

Please provide building sections showing heights of mezzanine, 2 floor, and the roof

'- Top of 1st floor slab: 0.00' +/-

- Top of mezzanine slab is 18.00'

- Top of 2nd floor slab is 53.5' +/-, second floor trusses are approximately 8' deep

- Top of Roof Steel is 75.5' +/- at monitors, minimum clear distance between second floor slab and roof framing is approximately 13.5'

23 05 93 It looks like the project does NOT require air barrier testing despite mentioning in spec 23 05 93, 3.2.4.1.d. Please clarify.

Air Barrier testing not required

I-102 Please clarify height of wall tiles in

Restrooms 202 and 203 or provide elevations.

Provide floor to ceiling wall tile in

Restrooms 202 and 203.

S-501 Drawing S-501 shows new grating for all exterior stairs landing while architectural drawings call for new grating only up to 2nd floor. Without a building elevation it's confusing, please clarify.

Elevations of the stairs are provided on both structural and architectural drawings. The stairs extend from grade to the second floor. Refer to structural plans for second floor elevation.

26 00 00 Does NAVFAC require NETA testing for this project?

Yes, NETA testing is required

A01 With Amendment 001 a scheduled site visit for November 19, please extend the due date for questions for, at least, 3 business days after the site visit.

Amendment 0002 is issued to extend the due date for PPIs from

17 November 2026 to 24

November 2026.

I-101 Finishes Drawing calls for whiteboards to be

CFGI. It might be GFCI. Please clarify.

Whiteboards are CFCI (Contractor furnished, contractor installed).

H-101 Hazmat Note 3 calls for Hazmat Testing of previously inaccessible areas. Please clarify if the offeror needs to include a hazmat survey in the proposal or any unexpected funding will be treated as a contract modification

A hazmat survey is not needed.

Destructive testing was not performed during the hazmat investigation, If suspect materials are uncovered during demolition, stop work in the area and notify the contracting officer. Bid per the quantities provided on the hazmat sheets. Include cost for all assumed/suspected materials listed on the hazmat sheets.

Painting Please clarify materials for the concrete sealer instead of generic high-performance coating specification

PENDING RESPONSE

Painting Please clarify if structural steel including stairs and railing is field painted or pre-finished.

PENDING RESPONSE

Price

Schedule

Para 1.0 states the "the contractor is responsible for providing all design…" Please elaborate on design requirements for this project since it's a design-bid-build per RFP.

PENDING RESPONSE

(End of Summary Changes)

File details come from the government source that posted it. Updated .